Muhammad Zubair Khaliq
***, *, *-* ********, Lahore, Pakistan
Cell +92-323-*******, Land Line +92-042-********
Email ****************@*****.***
Personal:
Father Name: Muhammad Zubair Khaliq
Date of Birth: April 06, 1984
Marital status: Married
Nationality: Pakistani
CNIC No: 35403-7988199-1
Permanent Address: 473-4-B1 Town Ship Lahore Pakistan
Qualifications:
2007-2009 (University of the Punjab, Lahore, Pakistan)
M.Sc. Applied Geology, Specialization in Engineering Geology & Geo-hydrology, (First Division)
Obtained 643/800 marks (80%)
2004-2007 (University of the Punjab, Lahore, Pakistan)
B.Sc. Applied Geology, (First Division)
Obtained 1882/3000 marks (63%)
2003 (Govt. Ambala Muslim College Sargodha, Pakistan)
F. Sc. (Geology), (Second Division)
Obtained 518/1100 marks (49%)
2000 (Divisional Public School, Town Ship Lahore Pakistan)
Matriculation (Science), (First Division)
Obtained 510/850 marks (60%)
Professional Experience:
Three (+3) years of Professional experience in Dam & HP Sector. (To recent)
1/2
Key responsibilities are,
Prepration of Lithic and Structural log sheets,
Performance of InSitu Test (Permeability Test in Bed Rock, Permeability Test in Alluvium, SPT, CPT, etc…
Regional Geological Mapping at 1:50,000 with the help of Topographic sheet
Detailed Geological Mapping with the help of survey grid at 1:5000
Supervision of Core and Non Core drilling and location of drill holes for the subsurface Geological Investigation
Core studies
RQD Test (Rock Quality Designation)
Coordination with Senior Geologist
Maintain Field & Office data received from site Office.
Worked one (01) year as Site In-charge / Engineering Geologist at Patrind Hydropower Project
Muzaffarabad, AJK
Current Projects WITH ACE
Munda Dam Project (July, 25- 2012 to date)
Working as Junior Engineering geologist at Mohmad Dam Project with key responsibilities as
a. Digitization of field Borehole log sheets and in-situ testing for Geological interpretation
b. Preparation and digitization of Geological section and units
c. Digitization and preparation of Geological maps
d. Preparation of strip logs / Summary logs
e. Frequent site visits for supervision of Geotechnical Investigations
f. Demarcation of Geological units on left bank and right bank at dam site
g. Collect and maintain site and office Geotechnical record /data
h. Coordination with Senior Geologists
Foundation Hydropower Project Chashma (PAEC)
Sehra Hydropower Project
Tarbela 4th Extension Hydropower Project
Computer Skills:
AutoCad
Microsoft word, power point and excel sheets
Exploring windows
Languages:
Urdu
English
Objective:
To work in a progressive and competitive environment in a future oriented organization.
2/2