Post Job Free
Sign in

Project Manager

Location:
Makati City, NCR, Philippines
Posted:
October 03, 2013

Contact this candidate

Resume:

CURRICULUM VITAE

MR. BAYANI M. NUQUE

Road *, Teachers Village,

Science City of Munoz, Nueva Ecija

Philippines

3119

E Mail Address *******@*****.***

*******@*******.***

1.0 DESIRED POSITION: Senior Maintenance Specialist

2.0 PERSONAL DATA

DATE OF BIRTH: 9 September 1960

NATIONALITY: Filipino

CIVIL STATUS: Married

SSS No.: 020 805806 1

TIN No.: 129 346 719

PAG IBIG No.: 000*-******-**

RELIGION: Latter day Saints (Mormons)

HEIGHT: 1.75 meter

WEIGHT: 90.0 kgs.

PASSPORT NO: XX2675159

VALID UNTIL: December 9, 2013

OBJECTIVE:

To be a part of prestigious and dynamic organization with a challenging work environment that

offers potential career and professional growth that will reward me success in this global scale of

technology and competitive works in the industry and I will bring my technical experience,

leadership and expertise that will integrate in company perspective.

WORK EXPERIENCES

April 20, 2013 Equipment Manager DMCI Mining Corporation

To Present 1283 3rd Floor Dacon Building,

Chino Roces Avenue Extension,

Makati City, Metro Manila

1.0 JOB DESCRIPTION AND RESPONSIBILITIES

• Reviews and approves departmental short term/long term plans and production schedules with subordinates.

Ensures that related strategies in plant efficiency management, inventory control and coordination of shipments

support overall objectives.

Coordinates support functions to ensure optimal efficiency in line with meeting site goals.

• Controls and/or coordinates the allocation of departmental personnel, machinery and other resources to

optimize production at the lowest possible cost.

• Evaluates proposed facility maintenance shutdowns and/or equipment repairs. Considers relative cost to

benefit issues and approves or reschedules accordingly

Maintains Workshop operating instructions and efficiency statistics.

• Cultivates proactive health, safety and environmental processes, which support company policy and comply

with law.

• Ensures that all company standards, practices and procedures are followed.

• Prepares and maintains departmental budgets and capital requests.

• Evaluates and manages operational costs, equipment/process efficiencies and departmental productivity.

Provides related guidance to direct reports as necessary.

• Monitors departmental employee performance, development, training and succession management needs.

Establishes protocols which prompt optimal growth in said areas.

• Utilizes available company resources effectively and promulgates positive interdepartmental relationships.

• Promotes and monitors a departmental culture conducive of generating effective collaboration, continuous

improvements, customer satisfaction and employee morale.

• Provide leadership and supervision for reporting staff to meet company

deliverables.

• Ensure all equipment and assets are designed, built, serviced and maintained in

a safe, efficient and professional manner.

• Ensure equipment in the field is promptly repaired and serviceable for field staff

to operate in a safe manner.

• Ensure all workshop and yard tasking and operations are undertaken in a safe,

Oversee workshop operations including rig repairs, new plant & equipment

manufacture, design and construction activities

• Responsible for Workshop & Yard safety compliance.

• Compliance with Company ESHMS within area of operations ient, cost effective and professional manner.

!Ensure a safe working environment by leading on the implementation of

Health and Safety policy, systems and procedures.

!Develop and deliver work methods and standards that will ensure health

and safety legislation is complied with.

!Undertake duties in relation to fire safety, as set out in the H&S Policy

including upkeep of a Fire Safety Plan.

!Ensure that all persons are aware of safety procedures and embed a strong

organizational culture seeking to develop a positive attitude to health and

safety among staff, volunteers and participants.

!Establish that all equipment, plant and substances used are suitable for the

task and are kept in good working condition; this includes the regular

maintenance and servicing of equipment

!Provide adequate training, information, instruction and supervision to ensure

that work is conducted safely;

! Take immediate and appropriate steps to investigate and rectify any risks to

health and safety arising from the work activity;

!Attend regular H&S committee in accordance with the H&S policy;

December 15, 2012 Workshop Service Manager Qatari Industrial Equipment

To April 10, 2013 Street 14, P.O. Box 9377

Qatar Industrial Area,

Doha,State of Qatar

2.0 JOB DESCRIPTION AND RESPONSIBILITIES

- Develops Business Plan and Strategy for the Heavy Equipment Workshop Division that ensures

attainment of company goals and profitability

- Responsible for the performance and development of the department

- Initiates and coordinates development and implementation of marketing plans as needed

- Conducts one-on-one review with all section manager to build more effective communications, to

understand training and development needs and to provide insight for the improvement of department

sales and activity performance

- Provide timely feedback to general management regarding performance

- Provides timely, accurate, competitive pricing on all completed prospect applications submitted for

pricing and approval, while striving to maintain maximum profit margin

- Maintains accurate records of all pricing, sales and activity reports submitted by Sales personnel

- Creates and conducts proposal presentations

-Supervise and control the equipment and fleet operations including car pools, transportation contracts,

following up on maintenance of fleet, and others in order to ensure the provision of transportation

services, in line with the general services strategy.

- Ensure that all relevant HSE procedures, instructions and controls are adhered to so that HSE

compliance can be guaranteed.

- Coordinate the maintenance and follow up on equipment maintenance in order to ensure fleet

availability and functionality at all times.

-Inspect the vehicles in need of maintenance by testing the potentially damaged parts and taking the

vehicle for a test drive.

- Organize and oversee equipment contracts including participating in negotiations and maintaining

professional relations with relevant suppliers

- Recruits, tests, and hires personnel based on criteria agreed upon by senior management

- Control expenses to meet budget guidelines

- Al all times operate in a responsible manner, projecting an image of sincerity and professionalism

- Report to management any aspect of company operations deemed to be contrary to interests or

objectives, particularly with regards to loss of profits/ assets or adversely affecting company image.

- Attends meetings, conferences and training sessions required

- Maintain effective communication with all customers, colleagues and suppliers

-To monitor and control vehicle down time of the fleet within the maintenance cycle ensuring this is kept

to a minimum reducing the cost of replacement vehicles.

-Highlight all necessary damages all departments and furnish the necessary information along with the

supporting documents with respect to cost of damage repairs to the respective functions for the purpose

of invoicing. In case of dispute by the customer relating to damages to the vehicle and invoicing, he

refers the matter to his Supervisor.

-To provide support and guidance the invoice processor and drivers regarding all jobs pertaining to the

Maintenance Department to enhance the productivity of the department.

-To ensure that equipment transferred to the maintenance project are efficiently dealt with and

processed upon completion to the correct project..

January 10, 2012 Logistics and Equipment Manager Konstrak International Inc.

To December 30, 2012 AmaiaScapes Mass Housing Project

Greenfield City

Cabuyao, Laguna

Heads the Project Logistics and Equipment Department in managerial capacity the following;

1. Warehouse and Materials Supply Management

2. Coordinates’ with SMPI smartblock OSP production and deliveries

3. Equipment and Motorpool Workshop

4. Procurement

5. Fabrication

GENERAL

• Plans, manages and supervises all phases and aspects of Logistics work, equipment requirements within

the pre determined schedule or time frame of every Project.

• Represents the Company and acts in its behalf, at all functions and within the limits of authority delegated

and assigned.

• Exercises cost control measures and ensures the various phases of Logistics support, regarding materials

requisition and equipment requirements of every Project are conducted in the most economical method and within

the approved budgeted cost.

• Informs the SPM and Chief Operating Officer of any discrepancies or changes in materials specifications,

additional requirements not within the approved budget cost, and where possible make recommendations as to

possible solution of discrepancies at the Project.

• Conduct monthly Coordination Meeting with Warehouse, Equipment staff and Procurement Officers on

program of works.

Logistics

Establishes the program requirements for all areas of the project, and monitors the draft and final

deliverables for adherence to these criteria. Responsible for the development and distribution of a one to

two-page description of the project to all members of the project team for reference.

Plans, directs, supervises, and controls the execution of all business, technical, fiscal, and administrative

functions of the assigned project. Assigns responsibility for executing project plans to key subordinates

after careful assessment of how to utilize their qualifications and strengths. Provides input to

performance reviews and development plans for subordinates. Field responsibilities may include labor

relations, local procurement and payroll operations, etc., if required.

Mobilizes company resources, through liaison with support departments, other offices, or subsidiaries, to

create project teams capable of completing effective, quality work. Discusses the qualifications required

of the key project positions in specific detail with the profit center and department managers.

Collaborates with the office facilities staff to address project space requirements.

Works with other managers, project engineers, and discipline leads to develop budgets, schedules, and

plans for the various elements of a project. Ensures that the project meets or exceeds goals established in

these plans.

Works with the key project individual to devise and execute actions plans to rectify potential cost

overruns or delays, or to accommodate significant changes to the scope of work. Advises the client and

company management of any such changes. The Project Manager is specifically responsible for

maintaining current and timely change orders.

Promotes technical and commercial excellence on the project through application of Quality Assurance

processes. Monitors and reports to management on the progress of all project activity within the

program, including significant milestones, and any conditions, which would affect project cost or

schedule. Establishes weekly meeting to review project status and formulate action items.

Equipment and Motorpool

• Make thorough study and initiates change or orders for overruns and other additional Logistics support not

included in the original approved Project requirements.

• Formulation of effective equipment operations, handling, repair and maintenance, preventive Maintenance

and reconditioning procedures of all deployed equipment in the Project.

• Maintenance of technically qualified personnel complementary responsive to the aim of the Department

which is the insurance of high and effective equipment availability and utilization.

• Ensures speedy and quality repair, maintenance and preventive maintenance of equipment through timely

completion of the Project’s schedule by timely supply, provision, and delivery of equipment.

• Ensures high availability, utilization and effectiveness of equipment at the Project through the effective

operation handling, repair and maintenance

Formulation of effective equipment operations, handling, repair and maintenance, preventive Maintenance and

reconditioning procedures of all deployed equipment in the Project.

Maintenance of technically qualified personnel complementary responsive to the aim of the Department which is

the insurance of high and effective equipment availability and utilization.

Ensures speedy and quality repair, maintenance and preventive maintenance of equipment through timely

completion of the Project’s schedule by timely supply, provision, and delivery of equipment.

Ensures high availability, utilization and effectiveness of equipment at the Project through the effective operation

handling, repair and maintenance.

Supervise the erection and operation of Concrete Batch Plant for the concrete requirement of the Projects.

Ensures that operation of Concrete Batch Plant complements with existing local and national law considering its

environmental safety and necessity.

Approval of material requirements and spare parts requirement of Batch plant with the insurance that availability

of request will complement with existing Project schedule.

Initiates enterprising study for smooth, effective and profitable operation of Concrete Batch Plant.

Initiates and provisions of integrated supply of spare parts, materials and quality resources from established

Suppliers.

Established efficient procedures and programs for proper procurement schedule of requested materials and

spare parts.

Established pre cautionary program, training and safety in operation, handling, repair and maintenance of

equipment deployed at the Project.

• Evaluates area freight, trucking and handling rates within established industry range.

Ensures availability of appropriate transportation and carrier units by determining and maintaining an optimum

fleet size which will serve the requirements.

Ensures timely and accurate reporting of relevant information for the effective planning and control of

Warehousing and Logistics activities

Established effective communications linkage with transport and field operations.

Fabrication

- To plan, execute and finalize projects according to strict deadlines and within budget. This includes acquiring resources

and coordinating the effort of team members and third-party contractors or consultants in order to deliver projects

according to plan. The Fabrication Manager will also define the projects objectives and oversee quality control

throughout its life cycle.

Plan, direct and coordinate the work activities and people resources for manufacturing fabricated (welded)

-

items in accordance with cost, quality and schedule.

Provides leadership and direction to the fabrication staff, which includes a superintendent, project

-

engineers, fabrication estimators, and shop foremen.

Responsible for the productivity of the fabrication dept. Reviewing production orders, schedule, staffing

-

requirements, work procedures while operating under budget limits and often tight time constraints.

Provides advanced technical support; guides and reviews the work of the above employees.

-

Work with Fab superintendent to hire, train, and give a technical evaluation of new fabricators, as well as

-

resolve personnel grievances.

Work closely with Quality Control Manager to insure the policy and procedures in Fabrication Shop are

-

being followed.

Plan, recommend and coordinate facility and equipment maintenance, repair or modification including

-

capital expenditures such as new machines or equipment.

Review and maintain production reports, personnel records and salary/hourly pay scales and ranges for

-

all fabrication employees.

Warehouse and Materials Supply Management

• Manages logistics and warehouse activities and schedule of deliveries as per approved requisition of

Project Management Team.

• Approves Materials Issuance for the delivery of requested materials in every area.

• Coordinates with Operation department regarding material deliveries as per their approved schedules.

• Plans, manages and supervises all phases and aspects of Logistics and Warehousing work, equipment

requirements within the pre determined schedule or time frame of every areas in the Project.

• Informs the Project Manager of any discrepancies or losses in materials packing list not within the

delivered items, and where possible make recommendations as to possible solution of discrepancies at the

Project.

• Plans and provide adequate and proper storage preservations and handling facilities for purchased

materials and supplies.

• Ensures that the materials and supplies requisitioned by Site Operations are acquired by specifications.

• Ensures effective planning, scheduling and monitoring of deliveries to Sites.

• Reviews performance of Suppliers, discusses their strength and areas for improvement based on Client’s

feedback for the attainment of shared benefits.

• Evaluates area freight, trucking and handling rates within established industry range.

Make thorough study and initiates change or orders for overruns and other additional Logistics support not

included in the original approved Project requirements.

Evaluates job performance of field personnel and makes recommendations of awards and salary increases for

Management approval.

Approval and provisions of integrated supply of Construction materials spare parts with in the approved

Requisition Requirements and budget.

Established efficient system for proper procurement schedules of requested construction materials and spare

parts.

Established and negotiates procurement contract, terms and conditions and other viable system to Suppliers.

Formulates contracts and Lease Agreement to Equipment lessors in accordance with the best practice and

profitable procedures.

Plans, establishes and monitors system in coordination with Purchasing guidelines in sourcing of qualified and

reliable local suppliers that will provide quality materials and service for the long term.

Plans and control acquisition of quality materials and supplies at optimum cost in order to insure availability

when required.

Ensures an effective users feedback system whenever ordering and purchasing is being done That will provide

an information and data on status of quality purchase and services provided.

Conduct weekly Coordination Meeting to all Warehouse Staffs to oversee that all targets and projection were met

at any given time and schedules.

Development of programs that will enhance the performance of Logistics Department at the Project.

Performs other jobs that may be given from time to time.

May 10, 2011 to January 5, 2012 Project Manager Will Decena and Associates Inc.

Optodev Manufacturing Plant Extension Project

LagunaInternationalIndustrial Park

Sta.

Rosa, Laguna

1.0 JOB DESCRIPTION AND RESPONSIBILITIES

- Plan a construction project and prepare a construction schedule in conjunction with the Project

Superintendent.

- Cooperate fully with the Project Superintendent to get the project completed.

-. Process contract drawings and specifications and ensure that the building is built in accordance with

these documents.

- Ensure that the contract drawings are the same as the estimate set of drawings.

- Process changes received from the Architect including contacting the subcontractor for pricing,

checking subcontractor quotations to ensure that they are complete and reasonable, and itemizing

changes and presenting them to the Architect with confidence that the pricing is in accordance with the

changes.

- Meet with Owners and Architects in a professional manner and have the ability to communicate

effectively both the concerns and best interests of the company.

-Ensure progress billing in full for the contract price including all accumulative changes and credits, etc.

- Instill a positive working relationship with the Owner and Architect to ensure repeat business.

- Prepare regular, timely and accurate billings for Owners, and ensure timely payment of subcontractor

billings.

- Monitor, in conjunction with the Project Superintendent, a project’s material and labor costs and ensure

accurate quality reporting is being conducted.

-. Have the ability to read, interpret, analyze and forecast a project’s cost reports and determine the status

of the job in terms of schedule and costing.

- Be aware of unit costs and monitor and compare daily progress on site with that of the project’s

estimate in conjunction with the Project Superintendent.

- Recognize competent subordinates worthy of promotion and be abreast of position vacancies to ensure

staff progression.

-. Conduct project meetings, bi-weekly or monthly as needed.

- Coordinate, manage and communicate with all subcontractors and effectively deal with problems such

as delivery, labour, schedule and payment disputes.

- Maintain a good working knowledge of trade unions, their agreements and stipulations.

- Ensure that the project is in a positive cash flow position and prepare Project Manager Reports

accurately and timely for submission to the Area Manager.

October 15, 2010 to May 8, 2011 Project Manager MTD ( Philippines) Construction Ltd.

Rehabilitation of South Luzon Expressway

Alabang – Calamba Sto. Tomas Grid

Alabang, MuntinlupaCity

2.0 JOB DESCRIPTION AND RESPONSIBILITIES

*Responsible for the Overall management of the project, both off and on site through delegation of

duties in accordance with the organizational chart, and for the effective implementation of the project

management system, quality and safety systems. Represent the company at project site and to provide

management oversight for all phases of the construction project, including coordinating workers,

material, and equipment, ensuring that specifications are being followed, and work is proceeding on

schedule and within budget.

Specific responsibilities include:

o Prepare project plan and update it as required.

o Define project staff qualification, assign them and define their job description and authorization.

o Review material tracking list, manpower tabulation, construction program and revise them as required.

o Review project budget breakdown, cash flow program and revise them as required before approving

them.

o Liaise with project accountant with respect to project cost coding system and cost control reports.

o Prepare subcontractors list, negotiate them, review subcontracts and revise them as required before

signing the said subcontracts.

o Review purchase orders, negotiate the vendors, sign the orders and follow up with procurement

manager till receiving the materials.

o Review Engineering department plan, revise as required, follow up progress in liaison with the

Engineering manager.

o Review Construction department plan, revise as required, follow up progress in liaison with the

Construction manager.

o Review Quality control department plan, revise as required, follow up quality control in liaison with

the Quality control manager.

o Review and submit the monthly valuation.

o Review and negotiate the change order

o Review, revise and submit progress reports.

o Review, revise and submit progress bill

o Liaise and coordinate with the consultant and owner representatives with respect to project

management.

o Continue responsible for the project till handing it over to the client.

o Achieving timely completion of the project at the most economic costs by coordinating the

construction activities.

o Negotiate and coordinating with and monitoring subcontractors regarding their scope of work and

ensuring alignment with the subcontract and ensuring alignment with the project’s schedule.

o Closely monitoring the project schedule, and implementing proper cost control to minimize

expenditure.

- Also responsible for ensuring that adequate resources are allocated to activities and utilizing the

available resources effectively.

- Promoting the requirement of a safe working environment on site. Ensuring that all work is being

carried out in safely manner and in accordance with company safety policy.

- Adequate control of materials received on site for implementation, Co-ordination of construction works

between site and with other contractors,

- Close liaison with Engineering in order to provide direction of planning, procedures and method

statements for construction requirements, responsible for acceptance, commissioning and handover of

the project.

- Develop and maintain good social and working relationships with the client’s representatives,

Consultant Government and Utilities officials, to ensure the smooth running of the project.

-Oversees establishment of Project Execution Plan, Health and Safety Plan, Quality Assurance/Quality

Control Plan, and other documents as required.

Establishes the program requirements for all areas of the project, and monitors the draft and final

deliverables for adherence to these criteria. Responsible for the development and distribution of a one to

two-page description of the project to all members of the project team for reference.

Plans, directs, supervises, and controls the execution of all business, technical, fiscal, and administrative

functions of the assigned project. Assigns responsibility for executing project plans to key subordinates

after careful assessment of how to utilize their qualifications and strengths. Provides input to

performance reviews and development plans for subordinates. Field responsibilities may include labor

relations, local procurement and payroll operations, etc., if required.

Mobilizes company resources, through liaison with support departments, other offices, or subsidiaries, to

create project teams capable of completing effective, quality work. Discusses the qualifications required

of the key project positions in specific detail with the profit center and department managers.

Collaborates with the office facilities staff to address project space requirements.

Works with other managers, project engineers, and discipline leads to develop budgets, schedules, and

plans for the various elements of a project. Ensures that the project meets or exceeds goals established in

these plans.

Works with the key project individual to devise and execute actions plans to rectify potential cost

overruns or delays, or to accommodate significant changes to the scope of work. Advises the client and

company management of any such changes. The Project Manager is specifically responsible for

maintaining current and timely change orders.

Promotes technical and commercial excellence on the project through application of Quality Assurance

processes. Monitors and reports to management on the progress of all project activity within the

program, including significant milestones, and any conditions, which would affect project cost or

schedule. Establishes weekly meeting to review project status and formulate action items.

Performs other responsibilities associated with this position as may be appropriate.

Aug.15, 2009 March. 23, 2009 Project Manager Transtech Builders Development Corp./

Gem Holdings Incorporated

Malampaya II Oil Exploration Project

El Nido, Palawan

JOB DESCRIPTION AND RESPONSIBILITIES

Ensure all activities comply with company and Client HSES requirements and guidelines.

Provide Construction Engineering input into tender preparation and evaluation, to design engineering, and pre-qualification of

project facilities.

Provide engineering reviews during the detailed design phase relating to fabrication, installation and hook-up.

Participate in design review of project QRA as required.

Oversee contractor activities to ensure construction schedules and connected delivery dates are achieved.

Manage all aspects of offshore installation and hook-up works, including multi discipline construction teams and multiple support

contracts.

Provide offshore supervision for installation workscopes.

Provide learning and development opportunities to Construction Engineers via mentoring, and Learning and Development

offerings, and ensure IPC's are completed for individuals as per guidelines

Provide offshore supervision to brown-field construction projects.

Provide technical support for major brown field developments, specifically with relation to the constructability and application of

relevant codes and standards.

Responsible for the preparation and/or approval of project work packs ensuring company specifications and standards are

applied.

Responsible for resource management for specific offshore construction projects, job specific material management and control

for offshore construction projects.

Liaises with offshore management and ensures all PTW and safety requirements are enforced for projects under his supervision.

Monitoring of progress re projects under supervision and related progress reporting.

Liaise with 3rd party test and certification bodies during offshore inspection.

Support Offshore maintenance staff as required.

Responsible for ensuring project close out is complete including all drawings marked up and submitted to document control for

revision and controlled re-issue.

Nov. 20, 2006 Logistics, Equipment& Project Manager Dreamwork Construction Inc.

To Sept. 15, 2009 Unit 203 2/F, ValenzuelaBuilding

Investment Drive, MadrigalBusinessPark,

Alabang, MuntinlupaCity

July 25, 2006 Project Manager NAIA 1 Passenger Departure Terminal Project

NAIA Terminal 1, PasayCity

JOB DESCRIPTION AND RESPONSIBILITIES

Oversee the construction project from start to finish.

Perform a key role in project planning, budgeting, and identification of resources needed.

Create the teams, develop the objectives/goals of each and assign individual responsibilities.

Project accounting functions including managing the budget, tracking if team expenses and

minimizing exposure and risk in the project

Ensure that construction activities move according to pre-determined schedule.

Devise the project work plans and make revisions as and when need arises.

Communicate effectively with the contractors responsible for completing various phases of the

project.

Co-ordinate the efforts of all parties involved in the project, which include the architects,

consultants, contractors, sub-contractors and laborers.

Monitor the progress of the construction activities on a regular basis and hold regular status

meetings with all the sub-teams.

Maintain strict adherence to the budgetary guidelines, quality and safety standards.

Periodic inspection of construction sites.

Ensure project documents are complete.

Identify the elements of project design and construction likely to give rise to disputes and claims.

Serve as a key link with the clients and review the deliverable prepared by the team before

passing onto client.

JOB DESCRIPTION AND RESPONSIBILITIES

Heads the Company Logistics and Equipment Department in managerial capacity.

Plans, manages and supervises all phases and aspects of Logistics work, equipment requirements

within the pre determined schedule or time frame of every Project.

Coordinates with the President, Construction Manager and Engineering Manager regarding the

approved Equipment Schedules and Materials Requirements of Projects in all phases of works, within the

agreed upon in house estimates with the relative profits for the company.

Represents the Company and acts in its behalf, at all functions and within the limits of authority

delegated and assigned by the President.

Exercises cost control measures and ensures the various phases of Logistics support, regarding

materials requisition and equipment requirements of every Project are conducted in the most economical

method and within the approved budgeted cost.

Informs the General manager of any discrepancies or changes in materials specifications, additional

requirements not within the approved budget cost, and where possible make recommendations as to

possible solution of discrepancies at the Project.

Conduct monthly Coordination Meeting with Logistics and Equipment staff (Procurement Officers and

Equipment Supervisors) on program of works. Logistics and equipment status and implement new

techniques for past faced construction methods for the Project.

Make thorough study and initiates change or orders for overruns and other additional Logistics support

not included in the original approved Project requirements.

Formulation of effective equipment operations, handling, repair and maintenance, preventive

Maintenance and reconditioning procedures of all deployed equipment in the Project.

Maintenance of technically qualified personnel complementary responsive to the aim of the Department

which is the insurance of high and effective equipment availability and utilization.

Ensures speedy and quality repair, maintenance and preventive maintenance of equipment through

timely completion of the Project’s schedule by timely supply, provision, and delivery of equipment.

Ensures high availability, utilization and effectiveness of equipment at the Project through the effective

operation handling, repair and maintenance

3.0 WORK EXPERIENCES

Buzwair Engineering and Contracting, Ltd

Position: Equipment Workshop Manager

Doha Causeway Foundation Expressway Project

Al Muntasha,Doha, Qatar

August 20, 2005 October 19, 2006

Buzwair Engineering and Contracting, Ltd.

Position: Equipment Workshop Manager

Al Dukhan Expressway Project

Al Dukhan,Doha, Qatar

January 25, 2005 August 15, 2005

3.0 JOB DESCRIPTION AND RESPONSIBILITIES

Heads the company Logistics and Equipment Department in managerial capacity.

In charge and responsible for provision, repair and maintenance of all equipments for Buzwair Groups,

Buzwair Engineering & Contracting, Buzwair Industrial Gases Factories, Qatar Gas Station and Buzwair

Crushers.

Formulation of effective equipment operations, handling, repair and maintenance, preventive Maintenance

and reconditioning procedures of all deployed equipment in Buzwair Groups..

Maintenance of technically qualified personnel complementary responsive to the aim of the Department

which is the insurance of high and effective equipment availability and utilization.

Ensures speedy and quality repair, maintenance and preventive maintenance of equipment through timely

completion of the Project’s schedule by timely supply, provision, and delivery of equipment.

Ensures high availability, utilization and effectiveness of equipment at the Project through the

effective operation handling, repair and maintenance.

Plans, manages and supervises all phases and aspects of Logistics work, equipment

requirements within the pre determined schedule or time frame of every Project.

Coordinates with the General Manager, Plant Manager and Engineering Manager regarding the approved

Equipment Schedules and Materials Requirements of Projects in all phases of works, within the agreed

upon in house estimates with the relative profits for the company.

Represents the Company and acts in its behalf, at all functions and within the limits of authority delegated

and assigned by the General manager.

Exercises cost control measures and ensures the various phases of Logistics support, regarding materials

requisition and equipment requirements of every Project are conducted in the most economical method and

within the approved budgeted cost.

Informs the General manager of any discrepancies or changes in materials specifications, additional

requirements not within the approved budget cost, and where possible make recommendations as to

possible solution of discrepancies at the Group.

Feb. 13, 2005 Workshop Manager R.D. Policarpio Construction I Hazama

August. 25, 2005 Construction, Co., Ltd.

Subic Clark Tarlac Expressway project

Porac, AngelesCity, Pampanga

3.0 JOB DESCRIPTION AND RESPONSIBILITIES

Heads the projects Logistics and Asset in acting managerial

Capacity.

Primarily responsible for timely request, provision and delivery of required equipment for the Project.

Formulation of effective equipment operations, handling, repair and maintenance, preventive

Maintenance and reconditioning procedures of all deployed equipment in the Project.

Maintenance of technically qualified personnel complementary responsive to the aim of the Department

which is the insurance of high and effective equipment availability and utilization.

Ensures speedy and quality repair, maintenance and preventive maintenance of equipment through

timely completion of the Project’s schedule by timely supply, provision, and delivery of equipment.

Ensures high availability, utilization and effectiveness of equipment at the Project through the effective

operation handling, repair and maintenance.

Supervise the erection and operation of Concrete Batch Plant for the concrete requirement of the

Projects.

Ensures that operation of Concrete Batch Plant complements with existing local and national law

considering its environmental safety and necessity.

Approval of material requirements and spare parts requirement of Batch plant with the insurance that

availability of request will complement with existing Project schedule

April 15, 2004 Logistics I Warehouse Equipment Manager Alan Dick Philippines Corporation

To Sept. 30, 2004 21st Floor, Raffles Corporate Center

Emerald Avenue, Ortigas Complex

1605 Pasig Ciy

3.1 JOB DESCRIPTION AND RESPONSIBILITIES:

Heads the Nokia Globe Phase 10 Project Logistics and Warehouse Department.

Manages logistics and warehouse activities and schedule of deliveries as per approved requisition of Operation

Management Team.

Approves Materials Issuance for the delivery of requested tower parts and materials in every area.

Coordinates with Operation department regarding tower deliveries as per their approved schedules.

Plans, manages and supervises all phases and aspects of Logistics and Warehousing work, equipment

requirements within the pre determined schedule or time frame of every areas in Phase 10 Project.

Coordinates with the Purchasing Manager and Construction Manager regarding the approved Delivery

Schedules and Materials Requirements in all phases of works at Phase 10 areas.

Informs the Purchasing Manager of any discrepancies or losses in materials packing list not within the delivered

items, and where possible make recommendations as to possible solution of discrepancies at the Project.

Oversees that all schedule of deliveries are met as per request of Phase 10 areas and see that all materials

were served as per their approved Materials Requisition Forms.

Plans and provide adequate and proper storage preservations and handling facilities for purchased materials

and supplies.

Ensures that the materials and supplies requisitioned by Clients are acquired by specifications.

Ensures effective planning, scheduling and monitoring of deliveries to Sites.

Reviews performance of carriers, discusses their strength and areas for improvement based on Client’s

feedback for the attainment of shared benefits.

Evaluates area freight, trucking and handling rates within established industry range.

Ensures availability of appropriate transportation and carrier units by determining and maintaining an optimum

fleet size which will serve the requirements.

Maintains the set physical condition standards for transport units on optimum cost thus insuring its availability.

Ensures timely and accurate reporting of relevant information for the effective planning and control of

Warehousing and Logistics activities

Established effective communications linkage with transport and field operations.

Plans, establishes and monitors system in coordination with Purchasing guidelines in sourcing of qualified and

reliable local suppliers that will provide quality materials and service for the long term.

Plans and control acquisition of quality materials and supplies at optimum cost in order to insure availability

when required.

Ensures an effective users feedback system whenever ordering and purchasing is being done That will provide

an information and data on status of quality purchase and services provided.

Conduct weekly Coordination Meeting to all Warehouse Staffs to oversee that all targets and projection were met

at any given time and schedules.

Development of programs that will enhance the performance of Warehouse Department at Phase 10 Project.

Performs other jobs that may be given from time to time.

Overseas Engineering and Construction Corporation, Ltd.

Position: Workshop Manager

Construction of LesCayes PortSalut Expressway Project

Port au Prince,

Republique de Haiti

July 10, 2004 December 5, 2004

Overseas Engineering and Construction Corporation, Ltd.

Position: Workshop Manager

RSEA Expressway Project

Bocas del Toro, Panama City,

Panama

February 10, 2004-July 5, 2004

3.2 JOB DESCRIPTIONS AND RESPONSIBILITIES:

-Heads the Project Equipment and Warehouse Division. In managerial capacity.

Responsible for the management of the Project wide Equipment Dispatching schedule for Operation

use and equipment utilization.

Monitor spare parts requisition and issuance to serve equipment requirements for breakdown units.

Approval of Receiving Reports and materials requisition and withdrawal of Warehouse to monitor

delivered items for the Project.

Monitoring of all stocks of materials, equipment, POL products and other items in Warehouse as

reference for requisitions.

Responsible for the strict implementation and enforcement of the dispatching and traffic regulations

within the jobsites and authorized destinations of equipment.

Exercise cost control measures and ensures the various phases of corrective and preventive maintenance

of equipment are conducted in the most economical method and within the approved budgeted cost.

Ensures speedy and quality repair, corrective and preventive maintenance of all equipment and oversee

the timely completion of Project schedule through timely provision of quality equipment for the Project

as follows;

Kenworth C500 Dump Trucks - 36 units

Mack CH600 Dump Trucks l8units

Kenworth T400A Tractor 6 units

Caterpillar DC 769 Offroad Trucks 24 units

Caterpillar R80 Rough Terrain Trucks 12 units

International 9700HR Tractor 5 units

Hitachi UH203 Excavator 6 units

Caterpillar 350C Excavator 26 units

Caterpillar D9R Bulldozer 15 units

Caterpillar D6R Bulldozer 12 units

Komatsu 0155 Bulldozer 6 units

Furukawa EC750 Rock Drill 4 units

P&H Telescopic Crane 250 T Cap 4 units

Mack HC600 Transit Mixer 24 units

lvecoTurbostarl90 Concrete Pump 8 units

Clark 175B Payloader 27 units

Caterpillar C930 Payloader 15 units

Rotary Drills 13 units

Lattice Crane Wesserhoth 6 units

Pile Driving Equipments 8 units

Crusher Plant 250 M3 capacity 2 units

Batching Plant Elba 60m3 cap. 3 units

Toyota Hilux Service vehicle 4x4 64 units

Toyota Land Cruiser 12 units

Honda CRV van 8 units

Toyota Hi Ace Van 9 units

In charge in the fabrication of the following tools and sheet files for the drilling and excavation Roadways

in tunnel and on shore engineering works:

1. Sheet files for pile driving works

2. Installation of bucket tooth for Rotary Drilling Buckets

3. Fabrication of flange for Pile Driving Layer pipes

4. Fabrication of diverse metal sheets for forms and shoring.

5. Repairs and fabrication of metals and pipes for rigging overhead shoring in underground tunnels.

6. Fabrication of steel pipes for layers of pile driving equipments.

7. Fabrication of metal sheets for cutting edge of heavy equipments.

8. Fabrication of metal sheets for metal padding in the tunnel.

9. Fabrication of metal sheets for rotary drill buckets.

10. Fabrication of I beams for overhead cranes...

Ensures high availability, utilization and effectiveness of equipment in the Project through effective

equipment operation, handling, repair and maintenance.

Monitor and check in house production of Crushing Plant, Batching Plant and Asphalt plant and

periodically check that all production of plants is within the Project requirements.

Oversee proper control of requisitions in the Project and see to it that requested items are not available

prior to procurement.

Coordinate with Procurement Division regarding the materials and spare parts requested for speedy

purchasing and delivery of materials.

Perform other duties that may be given from time to time.

October 13, 2003 Logistics / Warehouse Manager Alan Dick (Philippines) Corporation

To December 1,2003 Unit 701 I 702, 5th Street,

Angeles Livelihood Complex

Brgy. Cacutod, Angeles City,

Pampanga

3.3 JOB DESCRIPTION AND RESPONSIBILITIES:

Heads the Nokia Globe Phase 9 Project Warehouse Department in managerial capacity.

Manages warehouse activities and schedule of deliveries as per approved requisition of Operation Management

Team.

Approves Materials Issuance for the delivery of requested tower parts and materials in every area.

Coordinates with Operation department regarding tower deliveries as per their approved schedules.

Plans, manages and supervises all phases and aspects of Warehousing work, equipment requirements within

the pre determined schedule or time frame of every areas in Phase 9 Project.

Coordinates with the Logistics Manager and Construction Manager regarding the approved Delivery Schedules

and Materials Requirements in all phases of works at Phase 9 areas.

Informs the Logistics Manager of any discrepancies or losses in materials packing list not within the delivered

items, and where possible make recommendations as to possible solution of discrepancies at the Project.

Oversees that all schedule of deliveries are met as per request of Phase 9 areas and see that all materials were

served as per their approved Materials Requisition Forms.

Control and oversee all repairs of breakdown equipments for the use of Project.

Conduct weekly Coordination Meeting to all Warehouse Staffs to oversee that all targets and projection were met

at any given time and schedules.

Development of programs that will enhance the performance of Warehouse Department at Phase 9 Project.

Performs other jobs that may be given from time to time.

January 19,2002 Equipment Superintendent F. Gutierrez Construction Corporation

To February 10, 2003 Cervantes Road and Bridge Project

F. Gutierrez Construction Corporation

Daewoo Engineering and Construction, Ltd.

Baguio Bontoc Banaue Halsema Road

Rehabilitation Project

Km. 54, Natubleng, Bugias, Benguet

March 15,2001 Equipment Superintendent F. Gutierrez Construction Corporation

To January 3, 2002 Raytheon Ebasco Overseas Ltd. Co.

San RoqueMulti Purpose Power Plant

And Dam Project

San Manuel, Pangasinan

3.4 JOB DESCRIPTIONS AND RESPONSIBILITIES

Heads the Project Asset and Equipment Department in acting managerial capacity.

Responsible for the effective administration of Equipment Utilization rules and guidelines to ensure a company

wide and continuing organization of sound Equipment Management.

Responsible for the supervision of the Project wide Equipment Utilization Safety Program and the

development safety and educational training programs.

Evaluates Project Logistics support in, equipment requirement and schedule and make recommendations for

possible solutions for speedy delivery of required items.

Monitor unserved items and make thorough study and evaluation for overruns in other additional Logistics

support not included in approved Project requirements.

Approval and provision of established Suppliers for Project request.

Approval of Receiving Reports of Warehouse to monitor delivered items for the Project.

Monitoring of all stocks of materials, equipment, POL products and other items in Warehouse as reference for

requisitions.

Development of program for timely sourcing, provision and delivery of required spare parts and procurement

system for the Project.

Responsible for the strict implementation and enforcement of the dispatching and traffic regulations within the

jobsites and authorized destinations of equipment.

Exercise cost control measures and ensures the various phases of corrective and preventive maintenance of

equipment are conducted in the most economical method and within the approved budgeted cost.

Prepares regular progress reports for the Project and prepares forecast regarding manpower, materials and

equipment schedule properly supported by:

a. Materials Requisition

b. Equipment Requirement

c. Manpower Requirement

Conduct weekly coordination meeting with Field Staff (Maintenance Supervisor, Workshop Supervisor,

Warehouse Supervisor, Equipment Engineer, Chief Mechanic and Dispatching Foreman) and other concerned

personnel on changes in scheme, Equipment schedules, and speedy repair of equipment breakdowns, program

of works and status of Logistics.

Ensures speedy and quality repair, corrective and preventive maintenance of all equipment and oversee the

timely completion of Project schedule through timely provision of quality equipment for the Project.

Ensures prompt and realistic submission of monthly reports to the Management.

Formulates Personnel Development Program by providing training opportunity and hands on exposure to

Technical personnel.

Development of programs that will enhance the performance of Asset Management and Equipment Department.

Performs other job that may be given from time to time.

8 September1999 Logistics and Equipment Manager Luzviminda Engineering

to 2 March 2001

Suite 305, Dona Margarita Bldg.

J.P. Rizal cor. Cardona Street

Makati City, Metro Manila

CebuInternationalPort Project

CebuCity, Cebu

3.5 JOB DESCIPTIONS AND RESPONSIBILITIES

Heads the Company Logistics and Equipment Department in managerial capacity.

Plans, manages and supervises all phases and aspects of Logistics work, equipment requirements within the

pre determined schedule or time frame of every Project.

Coordinates with the General Manager, Construction Manager and Engineering Manager regarding the

approved Equipment Schedules and Materials Requirements of Projects in all phases of works, within the agreed

upon in house estimates with the relative profits for the company.

Represents the Company and acts in its behalf, at all functions and within the limits of authority delegated and

assigned by the General Manager.

Exercises cost control measures and ensures the various phases of Logistics support, regarding materials

requisition and equipment requirements of every Project are conducted in the most economical method and within

the approved budgeted cost.

Informs the General manager of any discrepancies or changes in materials specifications, additional

requirements not within the approved budget cost, and where possible make recommendations as to possible

solution of discrepancies at the Project.

Conduct monthly Coordination Meeting with Logistics and Equipment staff (Procurement Officers and Equipment

Supervisors) on program of works. Logistics and equipment status and implement new techniques for past faced

construction methods for the Project.

Make thorough study and initiates change or orders for overruns and other additional Logistics support not

included in the original approved Project requirements.

Evaluates job performance of field personnel and makes recommendations of awards and salary increases for

Management approval.

Approval and provisions of integrated supply of Construction materials spare parts with in the approved

Requisition Requirements and budget.

Established efficient system for proper procurement schedules of requested construction materials and spare

parts.

Established and negotiates procurement contract, terms and conditions and other viable system to Suppliers.

Formulates contracts and Lease Agreement to Equipment lessors in accordance with the best practice and

profitable procedures.

Primarily responsible for timely sourcing, provisions and delivery of required quality equipment for the Projects.

Formulation of programs for speedy and quality repair and maintenance of all equipment in the Project.

Developments of programs, training and procedures that will enhance the performance of Logistics and

Equipment Department

Evaluates Project Logistics support in materials requisition, equipment requirement and schedule and make

recommendations for possible solutions for speedy delivery of required items.

Monitor unserved items and make thorough study and evaluation for overruns in other additional Logistics

support not included in approved Project requirements.

Approval and provision of established Suppliers for Project request.

Approval of Receiving Reports of Warehouse to monitor delivered items for the Project.

Monitoring of all stocks of materials, equipment, POL products and other items in Warehouse as reference for

requisitions.

Development of program for timely sourcing, provision and delivery of required materials and procurement for

the Project.

Performs other job that may be given from time to time.

10 March 1998 Equipment Superintendent AsiakonstruktI Taisei Construction, Ltd.

To July 2, 1999 Bataan Polythelene Corporation Japan Gas

Corporation Project

PNOC PPDC PetroChem Complex

Batangas Dos. Mariveles

Bataan

25 June 1997 Equipment Superintendent AsiakonstruktI Taisei Construction, Ltd.

To 30 June 1998 Philippine Resin Indusrial, Inc. Project

PNOC PPDC PetroChem Complex

Batangas Dos, Mariveles

Bataan

3.6 JOB DESCRIPTIONS AND RESPONSIBILITIES

Heads the projects Construction Machinery and Equipment Department in acting managerial capacity.

Primarily responsible for timely request, provision and delivery of required equipment for the Project.

Formulation of effective equipment operations, handling, repair and maintenance, preventive Maintenance

and reconditioning procedures of all deployed equipment in the Project.

Maintenance of technically qualified personnel complementary responsive to the aim of the Department

which is the insurance of high and effective equipment availability and utilization.

Ensures speedy and quality repair, maintenance and preventive maintenance of equipment through timely

completion of the Project’s schedule by timely supply, provision, and delivery of equipment.

Ensures high availability, utilization and effectiveness of equipment at the Project through the effective

operation handling, repair and maintenance.

In charge in the fabrication of the following tools and sheet files for the drilling and excavation for dam

roadways.

Sheet files for pile driving works

Supervise the erection and operation of Concrete Batch Plant for the concrete requirement of the Projects.

Ensures that operation of Concrete Batch Plant complements with existing local and national law considering

its environmental safety and necessity.

Approval of material requirements and spare parts requirement of Batch plant with the insurance that

availability of request will complement with existing Project schedule.

Initiates enterprising study for smooth, effective and profitable operation of Concrete Batch Plant.

Initiates and provisions of integrated supply of spare parts, materials and quality resources from established

Suppliers.

Established efficient procedures and programs for proper procurement schedule of requested materials and

spare parts.

Established pre cautionary program, training and safety in operation, handling, repair and maintenance of

equipment deployed at the Project.

Ensures prompt and precise submission of monthly reports to Management.

Development of program that will enhance the performance of the Department.

Performs other jobs that maybe given from time to time.

May 15, 1996 Equipment Superintendent AsiakonstruktI Bechtel Corporation

To June 10, 1997 Quezon Power Plant Project

Mauban, Quezon

March 10, 1995 Equipment Superintendent AsiakonstruktI Ormat Technology, Ltd.

To May 13, 1996 Tongonan 230KVA Power Plant Project

Tongonan, Leyte

3.7 JOB DESCRIPTIONS AND RESPONSIBILITIES

Heads the projects Construction Machinery and Equipment Department in acting managerial Capacity.

Primarily responsible for timely request, provision and delivery of required equipment for the Project.

Formulation of effective equipment operations, handling, repair and maintenance, preventive Maintenance and

reconditioning procedures of all deployed equipment in the Project.

Maintenance of technically qualified personnel complementary responsive to the aim of the Department which is

the insurance of high and effective equipment availability and utilization.

Ensures speedy and quality repair, maintenance and preventive maintenance of equipment through timely

completion of the Project’s schedule by timely supply, provision, and delivery of equipment.

Ensures high availability, utilization and effectiveness of equipment at the Project through the effective operation

handling, repair and maintenance.

Supervise the erection and operation of Concrete Batch Plant for the concrete requirement of the Projects.

Ensures that operation of Concrete Batch Plant complements with existing local and national law considering its

environmental safety and necessity.

Approval of material requirements and spare parts requirement of Batch plant with the insurance that availability

of request will complement with existing Project schedule.

Initiates enterprising study for smooth, effective and profitable operation of Concrete Batch Plant.

Initiates and provisions of integrated supply of spare parts, materials and quality resources from established

Suppliers.

Established efficient procedures and programs for proper procurement schedule of requested materials and

spare parts.

Established pre cautionary program, training and safety in operation, handling, repair and maintenance of

equipment deployed at the Project.

Ensures prompt and precise submission of monthly reports to Management.

Development of program that will enhance the performance of the Department.

Performs other jobs that maybe given from time to time.

April 15, 1994 Equipment Supervisor AsiakonstruktI Ansaldo Construction, Ltd.

to March 5, 1995 MakilingBanahaw Binary Power Plant Project

Sto. Tomas, Batangas

April 1, 1993 Equipment Supervisor Asiakonstrukt I Ormat Construction, Ltd.

to April 10, 1994 350 MW Calaca II Coal Fired Power Plant Project

Calaca, Batangas

July 25, 1992 Equipment Supervisor Asiakonstrukt I PNOC ERC Dev’t

To March 25, 1993 Palinpinon Geothermal Power Plant Project

Phase II

Valencia, Negros Oriental

3.8 JOB DESCRIPTIONS AND RESPONSIBILITIES

Heads the projects Construction Machinery and Equipment Department in Supervisory capacity.

Primarily responsible for timely request, provision and delivery of required equipment for the Project.

Formulation of effective equipment operations, handling, repair and maintenance, preventive Maintenance and

reconditioning procedures of all deployed equipment in the Project.

Maintenance of technically qualified personnel complementary responsive to the aim of the Department which is

the insurance of high and effective equipment availability and utilization.

Ensures speedy and quality repair, maintenance and preventive maintenance of equipment through timely

completion of the Project’s schedule by timely supply, provision, and delivery of equipment.

Ensures high availability, utilization and effectiveness of equipment at the Project through the effective operation

handling, repair and maintenance.

Supervise the erection and operation of Concrete Batch Plant for the concrete requirement of the Projects.

Ensures that operation of Concrete Batch Plant complements with existing local and national law considering its

environmental safety and compliance.

Initiates and provisions of integrated supply of spare parts, materials and quality resources from established

Suppliers.

Established efficient procedures and programs for proper procurement schedule of requested materials and

spare parts.

Ensures prompt and precise submission of monthly reports to Management.

Development of program that will enhance the performance of the Department.

Performs other jobs that maybe given from time to time.

April 21, 1991 Equipment Control Supervisor AsiakonstruktI Millworks Industries Inc.

To July 20, 1992 Toyota Autoparts Project

Toyota Motor Philippines

Sta. Rosa, Laguna

March 12, 1990 Equipment Control Engineer Asiakonstrukt I Ansaldo Const., Ltd

To April5, 1991 365 MW Bacon Manito GeothermalProj.

Bacon. Sorsogon

3.9 JOB DESCRIPTIONS AND RESPONSIBILITIES

Heads the projects Construction Machinery and Equipment Department in Supervisory capacity.

Primarily responsible for timely request, provision and delivery of required equipment for the Project.

Formulation of effective equipment operations, handling, repair and maintenance, preventive Maintenance and

reconditioning procedures of all deployed equipment in the Project.

Maintenance of technically qualified personnel complementary responsive to the aim of the Department which is

the insurance of high and effective equipment availability and utilization.

Ensures high availability, utilization and effectiveness of equipment at the Project through the effective operation

handling, repair and maintenance.

Ensures prompt and precise submission of monthly reports to Management.

Development of program that will enhance the performance of the Department.

Performs other jobs that maybe given from time to time.

March 12, 1989 ` Equipment Control Aide AsiakonstruktI Taisei Construction, Ltd.

To March 10, 1990 UP NLRC Project

University of the Philippines

Diliman, Quezon City

3.10 JOB DESCRIPTION AND RESPONSIBILITIES

Assist the Equipment Supervisor in carrying plans and programs in provision, delivery and Mobilization of

equipment for the Project.

Prepares requisition forms for spare p parts for approval of Project Manager.

Coordinates with Construction Supervisors and Field Engineers for actual operation of equipment deployed at

the Project

Coordinates with Operators for the accomplishment of daily equipment utilization of equipment.

Monitor movement of equipment and enforce that proper utilization, operation and handling are observed.

Provides security and maintains order, disciplines with in the Workshop area.

Schedule the priority repair and preventive maintenance of equipment in accordance with the approval of

Equipment Superintendent.

Prepares accomplishment reports. Internal Billings and Repair History Report in accordance with actual

utilization of equipment.

Ensures proper implementation of company policies, guidelines and regulations to all Equipment personnel.

Formulates program for higher efficiency and utilization of equipment.

Performs other jobs that may be given from time to time.

June 20, 1986 Cadet Engineer I UpperPampangaRiver Integrated Irrigation

May 10, 1989 System Project UPRIIS

National Irrigation Administration

CLSU, Maharlika Highway

Munoz, Nueva Ecija

3.11 JOB DESCRIPTIONS AND RESPONSIBILITIES

Assist the Equipment District Engineer in planning, supervision and managing in all phases of equipment work

schedule and activities in assigned Project to finish he Project with in the predetermined schedule or time frame.

Prepares Masterlist of Equipment Requirements to a designated scope of work in the Project within the agreed

in house estimate for its equipment requirements.

Plans and supervise the insurance of security measures of all equipment deployed in the area.

Monitor consumption of fuel and lubricants issued to the equipment and prepare the request necessary for

refilling.

Make thorough study and evaluation of equipment performance of equipment deployed and oversee that it is

being maximized to certain efficiency.

Prepare accomplishment reports and daily utilization report as per equipment shift hours.

Prepare job orders for repair of equipment that breakdown for approval by District Equipment Engineer. Ensures

that operators and drivers are implementing proper guidelines, rules and regulation as per directed by District

Office.

Reports to District engineer any untoward incident or deliberate malfunctions regarding equipment and

personnel.

Performs other job that may be given from time to time.

February 5, 1984 Equipment Control Aide Erectors, Incorporated

Mantrade Building

Pasong Tamo Ave.

Makati, Metro Manila

March 25, 1985 to Equipment Control Aide Erectors, Incorporated

May 30, 1986 Makban I Geothermal Plant Project

Sto. Tomas, Batangas

3.12 JOB DESCRIPTION AND RESPONSIBILITIES

Assist the Equipment Supervisor in carrying plans and programs in provision, delivery and Mobilization of

equipment for the Project.

Prepares requisition forms for spare parts for approval of Project manager.

Coordinates with Construction Supervisors and Field Engineers for actual schedule for operation of equipment

deployed at the Project

Coordinates with Operators for the accomplishment of daily equipment utilization of equipment.

Monitor movement of equipment and enforce that proper utilization, operation and handling are observed.

Provides security and maintains order, disciplines with in the Workshop area.

Schedule the priority repair and preventive maintenance of equipment in accordance with the approval of

Equipment Superintendent.

Prepares accomplishment reports. Internal Billings and Repair History Report in accordance with actual

utilization of equipment’s.

Ensures proper implementation of company policies, guidelines and regulations to all Equipment personnel.

Formulates program for higher efficiency and utilization of equipment.

Performs other jobs that may be given from time to time.

4.0 SCHOLASTIC RECORD

Bachelor of Science in Mechanical Engineering

Central Luzon Polytechnic College

Cabanatuan City, Nueva Ecija

Date Graduated: 25 March 1983

Masters Degree in Business Administration

Araullo University

Cabanatuan City, Nueva Ecija

June 10, 2002 November20,2003

( Undergraduate)

5.0 GOVERNMENT EXAMINATION TAKEN

PASSED Professional Regulation Commission

Board of Mechanical Engineering

Date April 10 11, 1986

Rating 79%

Registration Number. 0032578

6.0 TRAINING AND SEMINAR ATTENDED

Certified byNEBOSH in Occupational Health and

Safety for International General Certificate

Master log certificate No:00099205/323743 –Int’l. General Certificate

Master log certificate No: IGC1/00099205/321196 – HSEManagement

Master log certificate No: IGC2/00099205/272672 – Control of Int’l. Hazards

Master log certificate No: IGC3/00099205/273054 –HSEPractical Application

Baguio International Convention Center

April 4 – June 25, 2011

Baguio City, Benguet

Taking Personal Safety in Welding To The Next Level of Excellence

Philippine Welding Society

Chiyoda Construction Division

TESDA Center, East Service Road, SLEX, Taguig City

June 12 16, 2011

Latest Development in Non Destructive Equipment

Cifra Industrial Services Corporation

TESDFA Center,East Service Road, SLEX, Taguig City

June 15 20, 2011

Industrial and Finances Systems Training and Seminar { IFS)

Alan Dick Philippines Corporation

21st Floor Raffles Corporate Center

Emerald Avenue, Ortigas Complex

1605 Pasig City

April 28 30, 2004

Understanding ISO 9001 : 2000 Requirements

Alan Dick Philippines Corporation

21 st Floor, Raffles Corporate Center

Emerald Avenue, Ortigas Complex

1605 Pasig City

April 15 18, 2004

Construction Safety and Health Course for Site Safety Officer

Construction Manpower Development Foundation

Department of Trade and Industry

MakatiCity, MM

September 15 19, 2003

Construction Project Quality Management

Construction Manpower Development Foundation

Department of Trade and Industry

CMDF Seminar Room

MakatiCity, MM

August 14 15, 2003

Internal QMS Auditor

Neville Clark International

Clark, Pampanga

August 20 21, 2003

ISO 9001: 2000 IRCA Foundation

Neville Clark International

MakatiCity, MM

June 6, 2003

International Standard (ISO 9001 ) Training and Seminar

Taisei Construction, Ltd.

JGC BPC Project

PNOC PPDC PetroChem Complex

Batangas Dos, Mariveles

Bataan

March 27 April 21, 1999

Basic Corrective Maintenance and Preventive Maintenance Applications

Association of Construction Equipment Lessors (ACEL)

Strata 200 Building, P. Padilla Street,

Ortigas Complex, Pasig City

Metro Manila

April 24 28. 1997

Career Financial ConsultantTrainingCourse

ZurichPhilippines

HotelManrio

CabanatuanCity, Nueva Ecija

September 10 22, 2000

Preventive Maintenance Applications Seminar

Pilipinas Shell

Raytheon Ebasco Overseas, Limited

San RoqueMulti Purpose Project

San Roque, San Manuel, Pangasinan

Marchl8.19, 2001

Fulfilling Construction Plans through Continues Commitment

F. Gutierrez Construction Corporation

El Marco Hotel, Alwana Village

Cagayan de Oro City

October 19 20, 2001

7.0 SPECIAL SKILLS

Basic Autocadd

Primavera Planning Software, Oracle

Knowledgeable in basic computer software, MS Word. MS Excel and PowerPoint, MS Office

Excellent in oral and written communication skills.

Above average in analytical and inter personal skill.

Reliable in supervision of working force.

Knowledgeable in Electro mechanical works

Driving and operation of Heavy equipment.

Welding (Arc,TIG and Oxy acetylene)

Can manage civil works and general construction

Sales management

Fabrication of sheet files and metals as per shop drawings.

8.0 CHARACTER REFERENCES

ENGR. RAMON C. TORRES

Chairman of the Board

Dreamwork Construction Incorporated

ValenzuelaBuilding, 263 Alabang Zapote Road

Las PiñasCity

Metro Manila, Philippines

Tel No. 091*-***-****

ENGR. CHARLES N. ABAD

Engineering Manager

Buzwair Engineering & Contracting

P.O. Box 319, Airport Road

Doha, State of Qatar

Tel No. 097*-********, 097*-********

MR. JESUS P. BLANCO

Vice President Finance & Administration

TransfilMegapower Industries Inc.

Unit 17 SolidGoldBuilding, Macabling, Sta.RosaCity,

Laguna

Tel No. 632-***-****/ 634*-*******

MR. BAYANI M. NUQUE



Contact this candidate