Olivier Baugard Ngounou
**************@*****.***
OBJECTIVE
Having over 15 years of experience in the Electrical field and possessing a Master of Science in Electrical
Engineering, I am interested in pursuing a position as Electrical Engineer, Control Engineer, Application
Engineer, Maintenance Engineer or Field Service Engineer. My expansive skill set in engineering
techniques and intricate grasp of engineering principles uniquely position me for the responsibilities
associated with high level electrical engineering projects.
WORK EXPERIENCE
Independent contractor July 2009 present
Baol Appliance repair York, PA
Business Services Other
Installed and serviced residential and commercial equipment (washers, dryers, refrigerators, microwaves,
dishwashers, ranges, stoves, air conditioning and heating equipment) with Sears Roebuck, Best buy, 24/7
express repairs
Field Service Technician March 2004 June 2009
Sears Home Improvement Products, Inc Glen Burnie, MD
Business Services Other
Install repair and service residential and commercial equipment (washers, dryers, refrigerators,
microwaves, dishwashers, ranges, stoves, air conditioning and heating equipment).
Project Engineer February 1997 May 2003
H2TX Douala
Engineering Services
Project Management • Process Plant Design & Modifications • Plant systems Maintenance
Define project scope and deliverables, develop and refine design specifications, create and execute work
schedules and ensure compliance with timelines.
Conduct design reviews with project owners and work groups, prepare and report on budgets and
completion of project milestones.
Manage activities of outside vendors and suppliers, assuring services and supplies are delivered on time
and meet project specifications.
Analyze cost benefit of capital improvements and evaluate economy of equipment replacement.
Develop packages, analyze product lifecycle, and select and procure components and equipment, and
design review processes.
Support start up and troubleshooting activities and manage field work and construction issues.
Establish maintenance plans and workflow, serving as repair coordinator for turnarounds.
Troubleshoot and diagnose issues, and develop FMEA/root cause failure testing, utilizing Failure Modes &
Effects Analysis.
Conduct post maintenance monitoring to ensure repairs and changes to systems are effective.
Employ Reliability Maintenance (RCM) program to conduct studies and analyses according to RCM
criteria.
Electrical Engineer July 1993 February 1997
Cover Ink Douala
Printing and Publishing
Electronic Teacher September 1991 June 1993
Technical High School Yaoundé
Education
EDUCATION
Master's Degree, Electrical Engineering, February 1989 December 1991
University of Douala Douala
Bachelor's Degree, Electrical Engineering, September 1985 July 1989
University of Ngaoundere Ngaoundere
CERTIFICATION
EIT certificate July 2009
SC Board of Professional Engineers
EPA CFC certification Universal June 2009
EPASKILLS
Power systems design and analysis, Power electronics and controls, PLC Programming
Short circuit calculations, Electrical systems and thermal design, Load flow and systems studies
Electomechanical troubleshooting, Electrical Troubleshooting, Control panel design
Equipment specifications and sizing calculations, Low voltage and Medium voltage switchgear
CAREER HIGHLIGHTS
Evaluated, identified, and resolved HP IP steam turbine thrust bearing problem, proposed and led
installation along with controls and baffles in the boilers to ensure high quality steam, condensate drains
are installed in the steam piping leading to the turbine.
Oversaw the renovation of a 30km high voltage 15kv between Edea and Douala Cameroon.
Designed and implemented the installation of a Process Plant of Alcohol Distillation.
Assembled and managed an interdisciplinary, winning team of technicians and coordinated their training
and scheduling.
Implemented test methods, conducted real time performance testing, and troubleshot design issues.
Renovated a 6 and 5 color printing machines Roland Favorit
Designed and implemented a station on water treatment for wetting water.
Improved production efficiency from 60% to 85%.