Post Job Free
Sign in

Engineer Quality Assurance

Location:
New Delhi, 07, India
Posted:
June 20, 2013

Contact this candidate

Resume:

FAROOQUE KHAN

Address: Jawahar Nagar, Post Azad Nagar, Jamshedpur, 832110, India.

Mobile No. (0091) 916**-*****, E-mail: ***********@**********.***

POST APPLIED – SENIOR FABRICATION SUPERVISOR / ENGINEER

TOTAL EXPERIENCE: 13 YEARS (INDIA & ABROAD)

CAREER OBJECTIVE

To utilize my professional skills and experience, to achieve success in contributing towards the

corporate objective of a progressive company that offers professional growth, while being resourceful

and flexible, I believe to take responsibility to get a job in multifunctional business management, and

diligence is my forte.

SUMMARY OF EXPERIENCE

Having Degree in Mechanical Engineering with dedicated 13 years of working experience in

Mechanical, Heavy & Medium Structure Piping Fabrication, Steel Structures & High Pressure Tanks

& vessels fabrication, installation, testing, commissioning & project coordination, supervision,

management, planning, implementation, execution in the field of Plant Equipment Maintenance,

Shutdown, piping,fabrication/erection, single or packaged equipment erection, Modules and Plant

Construction/Repair/Modification, Pre-commissioning and Commissioning works for mechanical static

and rotating equipment in the field of Oil & Gas, Power Plant, Petrochemical & Refineries in Indian

and Abroad locations.

All Types of Mechanical Manufacturing and Mechanical Fabrication Manufacturing Drawing, P & ID,

General Arrangement (GA) Drawing, Isometric Drawing, Piping and Piping Support Drawing, GA

Drawing for Equipment Erection, Materials Codes and Standards(IS, ASME, ASTM, API, ANSI,

DIN,BS etc.)

As a part of Project Management team with a wide range of experience in Oil & Gas Industry. Able to

work on initiative and as part of a team. Proven leadership skills involving managing, developing and

motivating teams to achieve their Targets. First-class analytical, design problem solving skills. Able to

take decisions under pressure, fully understanding and awareness of international HSE standards,

codes and procedures, able to work in desert / arctic condition, Excellent inter- personnel &

communication skills.

EXPERIENCE PROFILE

Over 13 years of hard core working experiences in Oil and Gas Industries, Petrochemical Industries,

Refinery under the department of Fabrication in different locations in India & Libya. Where I have a

different exposure with national and international clients in India and Abroad, like Indian Oil

Cooperation, Tata Steel, BOC Gases, Praxair Gases including best Safety working standard to reach

the organization target zero harm to people or with Lost Time Injury.

DURATION EMPLOYER POSITION

02.12.2005 – 10.01.2013 Indian Engg. & Const. Co. Pvt. Ltd, Jamshedpur Fabrication Engineer

20.05.2002 – 16.10.2005 LISCO, Libya DRP Workshop Fabrication Supervisor

18.08.2001 – 12.05.2002 Thermo Construction Ltd., Jamshedpur Fabrication Supervisor

Farooque Khan CV: Page No. 1/6

SUMMARY OF EXPERIENCE

Duration : 02.12.2005 – 10.01.2013

Employer : Indian Engineering & Construction Co. Pvt. Ltd, Jamshedpur

Position : Fabrication Engineer

PROJECT HANDLE WITH DIFFERENT CLIENTS:-

Client - 3 : Barauni Refinery, Barauni, India

Work Location : IOC, Barauni, India.

Duration : 18.04.2010 to 20.12.2012

Position : Site Fabrication Engineer

Principle responsibility

Well conversant with the Project HS&E Plan. Proactively participate in achieving the highest

possible International standard of HSE implementation. Review, and apply the contract

Specifications, project procedures, relevant codes and standards in the execution of

Fabrication engineering.

Review the scope of work as described in the Contract. Well familiar with procedures and

documentation. Compile and ensured timely issue of detailed Fabrication works, Work-packs

containing, work-scope description, piping fabrication of isometrics and Material Issue Notes.

Responsible for prepare piping hydro test packs and personnel involvement in pre-

commissioning activities (identify SYSTEM and SUB SYSTEMS for precommissioning)

Responsible for Mechanical Completions (MC) for fabrication and mechanical equipment, and

personnel involvement in producing following documents

Mechanical Equipment : Mechanical Completion Certificate

Mechanical Completion Status Index

Mechanical Compleation Check Record’s

Punch list form and Preservation Certificate,

For Piping (Check sheets ) : Line index

Piping installation

Piping system Flushing & Testing

Test pack Reinstatement

Test pack bolt tensioning

Chemical cleaning and Hot oil Flushing

Access and interrogate the site review station. Communicate, record and issue design changes

and revised fabrication works to the project team in a timely manner and in accordance with

the project procedures; i.e. Contract Change Notices, Site Engineering Queries, Field Change

Notices, Site Instructions.

Liaise with fabrication personnel to ensure issue of site engineering information and drawings

are being issued in line with the construction schedule. Preparing the plans of day to day

complete Fabrication of star columns, Heavy beams, columns, Bracing etc. Issue all the

Drawing to contractor for Day to Day activities and records Co-ordinate with planning after

receipt of raw materials to clear from QC/ Third party Stage inspection of all activities

in fabrication shop include Fit-up, Assembly.

Farooque Khan CV: Page No. 2/6

Third party Inspection for the job as per Quality assurance plan / spec

sub-assembly Manage, assembly, welding joints with NDT inspection witnessed by third party

inspection. After final inspection material sends to sand blasting and painting. Co-ordinate with

planning dept. to plan all the activities in Fabrication (plate cutting, edge preparation, fit-up,

assembly, welding), Development of systems to manage consumable inventory and ordering.

Sequence of fit-up & Assembly in fabrication to meet the welding joint requirement as per

company standard.

Client - 2 : BOC GASES, Jamshedpur

Work Location : Jamshedpur

Duration : 20.01.2008 – 12.04.2010

Position : Fabrication Engineer

Principle responsibility

During this period I have been involved in fabrication, installation, testing and commissioning

& Fabrication of piping systems (Process) of the projects. Which includes the following day to

day responsibilities:-

Review the scope of work as described in the Contract. Liaise with the Piping Superintendent,

Mechanical Engineer, Planning Engineer and Forman. Estimate the scope of work and liaise

with the fabrication Engineering Manager to ensure that Contractor supplied material is

requisitioned in a timely manner to enable procurement in accordance with the Contract

Master Schedule.

Liaise with fabrication personnel to ensure issue of engineering information and drawings are

being issued in line with the construction schedule. Ensure all work being carried out is done in

a timely manner and in line with the master schedule. Effective maintenance of Performance

through HS&E and STOP program. Achieve safety standards as defined in personal

performance contract.

Review, and apply the contract specifications, project procedures, relevant codes and standards

in the execution of piping production engineering. Preparation of construction work packs and

job cards. Work with the inspectors and contractor for resolution of quality control related

issues or concerns.

Oversight of all contractors’ fabrication and installation activities for successful completion of

the work in accordance to the project schedule and contract. Responsible for on and offshore

construction activities. Work with the inspectors and contractor for resolution of quality control

related issues or concerns.

Construction of atmospheric above ground storage tanks, shell plate erection on going

by jacking method. Coordinating fabrication and erection activities for the tanks. Coordinating

shell course shifting from fabrication yard to tank area. Preparation/coordination in getting

approval of daily inspections from the client. Getting the mechanical clearance for testing,

commissioning of all tanks.

Supervise and manage the subcontractors for the construction of storage tanks and report to

engineer. Monitoring and reviewing the tankage job as per required by client. Lead and

coordinate with the QA/QC in all quality related aspects which is related to site Mechanical

Fabrication works.

Review the approval documents about Inspection Test Plan of the project to ensure inspection

shall be in accordance with the required quality standard and procedures. Execute and submit

Farooque Khan CV: Page No. 3/6

inspection documentation works for static and rotating equipments

toassure that the required forms used in testing submitted are approved by client representative

as per procedure and specifications approved from the client side such as:-Installation

checklist for static/rotating equipments-Leveling/alignment recording forms for horizontal and

vertical package type-Axial/radial, soft foot parallelism forms for pumps and compressors.

Regular surveillance checking at site to verify the preservation requirements for anchor bolts

during construction stage. Check the physical condition of anchor bolts and leveling of

foundations before erection of equipments. Check preservation status of equipments at site.

Ensure to have a preservation log for all the equipments checked and monitoreddaily/weekly

for easily tracking the status.

Obtaining a complete check list of the assembling equipment and keep a record of a same

responsible person for clearance of materials inspection. Responsible for erection of

equipments such as pumps, vessels, tanks and compressors and other equipments as per the

approved method statement. Check equipment orientation before and after erection. Check the

shimming requirements for static and rotating equipments. Check the condition of pump

alignment (axial/radial) for preparation for piping & fabrication installation. After getting

clearance note of civil about foundation ready preparation for alignment and leveling and

checked setting of padding plates.

Client - 1 : PRAXAIR GASES, Jamshedpur, India

Work Location : Fabrication Yard, Praxair Gases

Duration : 05.01.2006 – 10.01.2008

Position : Fabrication Engineer

Principle responsibility

Checking and verifying the drawings and specifications familiarized on the construction details.

Ensure that the drawings are in latest revision and editions, approved for fabrication and

construction. Monitoring inspection at implementation of projects procedure, specifications at

method for statement. Coordinating with the sub contractors (Engineers, Supervisors and

Inspectors) to ensure the compliance of quality assurance. Carried out Visual inspection or line

checking for hydro testing, pneumatic testing and reinstatement of pipe.

Assigning the Utility area respectively, conducting walk down inspection and punch clearing

work. Study and implement approved ITP’s (Inspection and Test Procedure) to be conducted on

all piping installation. Supervising and monitoring of pipe spool on above ground pipe racks

and under ground pipe line, conducting punch clearing for rectified punched items and make

confirmation to hand over to the client’s consultant for final walk down / punch listening and

clearing prior to test requirements.

Inspection of surveillances of pipes and ensuring it is in accordance with the General

Specifications and approved for construction. Enforce soundless of quality for field

workmanship. In charge of monitoring for cleaning of punch item of test packages. Coordinates

schedule of testing on piping to both hydro test group and QC. Perform related jobs as

assigned by the area piping Superintendent.

Direct supervise and coordinate activities of workers engaged in the fabrication, installation

and underground pipes for drains and above grounds for process plants and structure erection

equipments. Studies plan drawings to determine the extent of work to be done, material and

equipment to be used assists in preparation the schedule of work activities and gives

assignments to subordinates like Foreman, Charge Hand and gives priority to critical areas.

Farooque Khan CV: Page No. 4/6

Inspects work in progress to determine conformity with plans and specifications, suggest better

way of pursuing works assignments to achieve more economical and efficient work operations.

Installation of two new Gas Turbine, Involves in Piping connections and Structural also involve

in extension of piping and fully connections of Hydro Testing and Testing Commission.

Installation of Vessel and fully connections of piping.

Modifications and fabrication of plans as per the approved drawings, modification of piping,

Gas Turbine, New structural installed and piping work. Installation of Oil Lines and

Installation of new process platform. Installation of Process Platform, water injections platform

and fully piping installation. Fiber Glass pipe for Fire Fighting, Stainless Steel, Nice, Mild

Steel etc. Modification of tank and flair pipe line.

Installation of Pumps, compressors of new moves and piping work. Fully piping, vessel

installation, Connection, Hydro testing and commissioning works. Structural, Piping, Vessels

and Installation of Hydro Testing and Commissioning.

Duration : 20.05.2002 – 16.10.2005

Employer : Libya Iron & Steel Company, Libya

Position : DRP Workshop Fabrication Supervisor

Principle responsibility

Scheduling maintenance and Planning of Gas base DR Module (DRP Plant) which includes the

following major responsibilities coordinating the weekly minutes of meeting with Plant

Engineers, Planning Engineers about the planning and preparation of Procurement of

materials required for the ongoing jobs in presence of Plant Manager, and distribution the

concerned attendees for their follow up actions.

Maintenances of rotary and static equipment, Maintaining Gear Boxes, Stem Rod, Couplings,

Vertical Pumps, Horizontal pumps, Centrifugal Pumps, Gas and Water Pipe Line, Hydraulic &

Hydraulic line, etc. all types of pneumatic valves, relief valves, gates valves, butterfly valves,

check valves, Gear Box and Industrial Pumps, conveyors, hydraulic and pneumatic actuator,

EOT Cranes Etc. Inspection of the material / equipment on arrival in the warehouse before

final purchase.

Well trained and experienced in Pipe fittings, maintenance and excavation work Maintenance

& servicing of (Screw type) air compressors, Operation & Maintenance of air Conditioning

plants, Operation & Maintenance of Cooling towers, Air washers Centrifugal Pumps,

Compressors, Blower’s, Pumps, Hydraulic and Pneumatic machines and gearboxes, Shifting,

conveying screws, centralized oil and grease lubrication systems and P&ID, Erection and

commissioning of heavy machines, Pipes and pipe supports. Different type of Fabrication

Works in work shop as requirement for the Plant Maintenance.

Punch List handling with groups to correct punched items and preparing a list of missing

materials for request. Also attend and supervised bolt tensioning activities. Assigning to the

Fabrication of the Piping supports. Closely monitor fabrications activities in accordance with

the specs and fabrication drawings. Counter check up daily production status compares with

the fabrication index and prepares progress report.

Preparing shop drawing and isometric drawings, supervise the fabrication and erection works,

preparing daily work schedule, prepare daily work progress, closely monitor and follow up

urgent materials. Evaluate and monitoring manpower, equipment and other urgent materials to

Farooque Khan CV: Page No. 5/6

meet the estimated work production and propose, suggest corrective action to the client when

encountering field interfaces.

Duration : 18.08.2001 – 12.05.2002

Employer : Thermo Construction Limited, Jamshedpur

Site Location : Tata Steel Limited, Jamshedpur

Position : Fabrication Supervisor

Principle responsibility

Worked as a Fabrication Charge hand and responsible for all the day to day site construction

activities like material handling and inspection, fabrication, erection and commissioning and

successfully completed it as per the Project Drawings and specification and standards up to the

client satisfaction. Attended the minutes of meeting with Client as well as sub-contractor, raised

technical Queries (if required) and clarified and coordinated with other problems related to

design or site construction with them.

Fabrication, erection of various types of Pipe, piping structural, piping supports based on

piping layout Drawings to suit site conditions including required modifications to pipe work

and piping supports based on clients’ approval. Responsible and reviewing activities like

hydrostatic testing, pneumatic testing, and re-instatement work. Responsibility in interpretation

of all related drawings of piping works. Responsibility in fabrication and erection activities,

responsibility in safekeeping of materials, tools for installed. Responsibility in making daily

accomplishment report. Conducting punch list and pre-commissioning activities.

Conducting all kinds of testing in accordance to piping standard, conducting safety meeting

prior to commence of daily activities, coordinating with the sub contractors (Engineers,

Supervisors and Inspectors), to ensure the compliance of quality assurance, carried out visual

inspection or line checking for hydro testing, pneumatic testing and reinstatement of pipe.

assigning the Utility area respectively, conducting walk down inspection and punch clearing

work, study and implement approved ITP’s (Inspection and Test Procedure) to be conducted on

all piping installation.

Checking and verifying the drawings and specifications familiarized on the construction details.

Ensure that the drawings are in latest revision and editions, approved for fabrication and

construction. Monitoring inspection at implementation of projects procedure, specifications at

method for statement. Inspects work in progress to determine conformity with plans and

specifications, suggest better way of pursuing works assignments to achieve more economical

and efficient work operations. Review and apply the contract specifications, project procedures,

relevant codes and standards.

EDUCATIONAL QUALIFICATION

Completed Bachelor Degree in Mechanical Engineering with 1st Class, 2001.

Completed Intermediate (10+2 th Class) Education in year 1996.

PERSONAL DETAILS

Name : Farooque Khan

Age : 35 years

Nationality : India

Marital Status : Married

Language Known : English, Hindi, Urdu, Bengalis.

Farooque Khan CV: Page No. 6/6



Contact this candidate