Todd Midgette
Freehold, NJ 07728
H: 732-***-****
M: 215-***-****
************@***.***
Summary
A self-motivated manager with 20 years of experience leading people and developing teams
using a strategic approach to drive continuous improvement
Highlights
-Excellent communication skills
-strategic thinker
-Team Builder
-Goal driven
-Skilled at driving change
Accomplishments
Safety
Led initiatives that reduced the OSHA recordable rate 25% over a three year period
(2009-2011)
Quality
Reduced “out of box” incident rate year over year for 4 years in a row (2008=2011)
Productivity
Improved plant operations which led to a decrease in labor cost throughout my career
Cost Control
Worked with finance to set the budget then made the proper adjustments throughout
the year to make sure spending and labor both direct and indirect was in line with
sales.
Logistics
Led the production and shipping team to improve on time delivery from 85% year
ending 2009 to 98.5% year ending 2011
Lean Culture
Developed a culture of continuous improvement through analytic thinking, training,
employee involvement, and continual kaizen events. This change in culture led to all
of improvements in Safety, Quality, Productivity and On time delivery
Experience
June 2012-Present Northeast Building Products Philadelphia,
Pa
Plant Manager
Responsible for the day to day operations for the company’s window and door
manufacturing business unit. Accountable for the safety, quality, productivity, on time
delivery and overall employee wellbeing. Measure our performance versus our goals and
identify the problems that challenge us from meeting these goals. We take an analytical
approach from the point we identify a problem all the way through implementing and
monitoring a solution.
January 2012- Northeast Building Philadelphia,
PA
June 2012 Continuous Improvement Manager
Accountable for identifying opportunities for improvements throughout the window and
door business. Acted as a change agent from scheduling through shipping. We identified
the root cause of the problems and implemented changes that led to measurable
improvements in safety, quality and cost of labor.
July 2000- SilverLine Building Products North Brunswick,
NJ
January 2012 General Manager
Responsible for all operations at the North Brunswick and Middlesex plants. Led a
management team that included the managers from safety, quality, production, extrusion,
receiving,shipping and continuous improvement. Held daily meetings to ensure goals were
being met and that accomplishments were being recognized. We defined problems, collected
data, analyzed information and implemented solutions. Our team managed more than 800
team members over 2 shifts.
August 1995- SilverLine Building Products North Brunswick,
NJ
July 2000 Plant Manager
Managed the manufacturing floor at the North Brunswick plant. Responsible for leading a
team of production managers and supervisors. Our team was accountable for safety, quality,
productivity and on time delivery.
August 1993- Patriot Manufacturing Hammonton,
NJ
July 1995 Plant Manager
Responsible for entire manufacturing operation. Accountable for safety, quality, productivity
and continuous improvement.
July 1990- Patriot Manufacturing Hammonton,
NJ
August 1993
Line supervisor. Responsible for safety, quality and productivity on an assembly line that
consisted up to 20 team members.
Education
1990 College of New Jersey Trenton, NJ
BS Industrial Engineering