Post Job Free
Sign in

Project Manager Electrical

Location:
Matawan, NJ
Posted:
October 17, 2013

Contact this candidate

Resume:

Terry C. Williams

**** **** **** ****

Williamston, NC 27892

919-***-****

******@*****.***

Objective

To obtain a quality position in a results-oriented company that seeks an individual

whose skills, education, and experience will be utilized toward continued growth as a

manager in the electrical field. To secure a long term position utilizing my broad electrical

expertise, where I will have the opportunity to act, react, and interact with a group of

qualified professionals.

Highlights of Expertise

• Successful state federal bids from $10,000 - $100,000

• Master Electrician license - North Carolina

• Successful commercial bids from $25,000 - $750,000

• 18 years’ experience in the residential, commercial, and industrial electrical industry in

all capacities: helper, journeyman electrician, electrical supervisor, electrical estimator,

electrical project manager and Master electrician.

• Trained as an electronic technician; able to troubleshoot circuit problems down to the

component level

• Experienced with the oscilloscope, digital multi-meter, logic probe, and soldering iron

• MS Word expertise; skilled in typing and navigation of the internet

• Proficient in Electrical and Piping and Instrumentation diagram/ (PID) Print reading

• Ability to perform calibrations, installation and maintenance of process and analytical

instrumentation

• Installing and servicing individual UPS systems for server rooms including HVAC and

alarm management.

• Bidding, installing, and scheduling installation of diesel generators 1-100kw including:

coordination with utilities, concrete pad fabrication, metering systems, and transfer

switches.

• Allen Bradley Control Logix, Micrologic, PLC5 Logix 500 & SLC 5000

• Able to troubleshoot single and three phase equipment, AC/DC motors, VFDs, PLCs, and

Servo motors

Qualified to read and interpret schematics and process control diagrams (Piping and

Instrumentation diagram)Print.

• Willingness to analyze trending work force performance alarms and process problems,

identify root causes, and propose/implement remedies.

• Experienced in troubleshooting control systems, including limit switches, proximity

switches, photo-electric sensors, solenoid valves, and PLC I/O modules.

Experience

Weyerhaeuser Company, Inc., Plymouth, NC. 03/2011-present

Plant Electrician

Primary Responsibilities included:

• Troubleshoot PLC controlled high speed production equipment

• Maintain the power distribution of operations and maintenance equipment

• Maintain variable speed drives and production equipment

• Disassembling, repairing, and reassembling equipment

• Use of precision measurement tools

• Reading blueprints and equipment manuals

• Troubleshooting and correcting electrical problems in a fast paced environment

• Maintain high quality and plant safety requirements

• Complete assigned work efficiently pre Standard Operating Procedures (SOP’s)

• Worked in a team or as an autonomous group performing work orders and providing

electrical support for the entire lumber processing facility.

Tamter Electric Co., Inc. /Independent Estimator & Consultant 10/2005 – Present

Electrical Estimator / Project Manager

•Projects won in New Jersey: Navesink Country Club = $755,000; Pilot Travel Centers =

$219,000; United Teletech Federal Credit Union = $22,000

•Monitored several bid invitation websites for new projects

•Established relationships with general contractors, building owners, purchasing managers,

etc., to secure work for 25 journeymen and helpers

•Performed take-offs, downloaded data into estimating software, prepared estimate per

scope, and sent plans to reprographics vendor for duplication

•Adjusted estimates due to any addendums or deviations from the bid plans, while remaining

in constant contact with the potential customer

•Executed value-engineering, added alternate options where required, and prepared a project

folder with all necessary information to ensure a seamless transition at the project

transition meeting

•Proficient with computers, Microsoft Office, Adobe, Power Estimator by Jaffee, Intelli bid

by ConEst, Aces Estimator program, and Blue Beam document editor by Adobe.

•Projects won in Virginia, NC, and Washington, DC: University of the District of

Columbia = $320,000; Fort Belvoir Army Base = $52,000; Andrews Air Force Base =

$15,000; Elizabeth City State University = $85,000

•Responded to bid invitations, and drafted a bid schedule and logs for upcoming bids

•Prepared word schedule progressions and submitted material and equipment specs to the

general contractor

•Performed take-offs, downloaded data, prepared estimates, and submitted bids with any

necessary paperwork, including any change orders, alternates or communications

•Conducted site visits; met with the project engineer, and fire alarm and security vendors to

discuss project details

•Ordered materials; responsible for accurate "as-built" drawings.

Eastern Omni Construction, Greenville, North Carolina 2003 to 2005

Journeyman Electrician

• Worked with a crew of industrial electricians at the Plymouth Weyerhaeuser facility installing

the cabling, and controls for the new machinery in the "new wood yard"

• Worked in the "MCC" pulling in and terminating cables for the newly installed conveyers,

belts, and other electrical equipment.

• Operated an aerial lift up to 60 feet installing light fixtures on newly constructed structure,

including conduit and branch circuits.

• Traveled to the Weyerhaeuser facility in New Bern to help electricians when requested on

various projects that were needed to be completed quickly, including :

Installation of high voltage main and distribution centers, control wiring for stand-by generators,

terminating wiring on newly installed equipment, including temperature and pressure indicators.

Scholes Electrical Inc., Piscataway, NJ 3/2002 - 8/2003

Journeyman Electrician

•Installed hundreds of batteries in the UPS battery rooms in the Goldman Sachs Building

located at 30 Hudson, in Jersey City, NJ

•Monitored charging of batteries, and bringing up of backup system, monitoring temperature,

charging level, amps, and other data as needed.

•Worked in every capacity of a Journeyman, installing general lighting and receptacles,

transformers, power distribution systems, cable trays, and the overall electrical

installation of the building

Power Electric Inc., Belleville, NJ

12/ 2000 – 09/ 11/ 2001

Journeyman Electrician

•Worked with an electrical crew to wire the new Continental Airlines terminal C at Newark

Airport

•Installed PVC, EMT, and rigid conduit systems

•Installed conductors of all sizes, light fixtures, devices, panel-boards, grounding grids, etc.

•Installed portable UPS systems for critical communications systems.

Education

The Institute at Middlesex County College, Edison, NJ, 2009

Electronic Technician Training

*Certificate of Completion

*Certificate of Recognition for Outstanding Performance

Martin Community College, Williamston, NC, 1994

Electrical Maintenance & Installation

*Certificate of Completion

Military Experience

United States Marine Corps

Honorable Discharge

Salary Requirements/Relocation

Open for discussion



Contact this candidate