Post Job Free
Sign in

Supply Chain Management

Location:
Mansfield, TX
Salary:
55000
Posted:
October 17, 2013

Contact this candidate

Resume:

Archit Sanghvi

*** * **** ** *** ***, Arlington, TX 76013

817-***-****, ******.*******@****.***.***

EDUCATION

University of Texas at Arlington May 2013

Master of Science in Industrial and Manufacturing System Engineering

Gujarat University, India July 2011

Bachelor of Engineering in Aeronautical Engineering

TECHNICAL SKILLS

• Software Proficiency: Auto CAD PRO-E Solid Works Microsoft Office Suites MS Project MS Visio

Warehouse Management System Supply Chain Guru

• Ability to read and understand engineering drawings.

• DMAIC to improve speed, quality and cost, Value Stream Mapping, Voice of the Customer, Lead Time

ENGINEERING SKILLS

• Logistics skills: Supply Chain Management, Warehouse Management System, LTL, 3PL, Forecasting

• Manufacturing Skills: Product Life cycle management, Lean manufacturing, ERP, 5s and Kaizen

• Business Skills: Motion and Time Study Measurement, Takt Time Studies, JIT

• Machine Skills: CNC, Injection Molding, Plastic Molding, Lathe, Milling, Welding Machine

WORK EXPERIENCE

Electrotherm India Inc., Ahmedabad, Gujarat, India

Trainee Engineer January 2010- December 2010

• Performed various manufacturing operations and manufacturing processes such as casting, Molding

• Recommended possible solutions of plans and designs which were considered by the department

Ahmedabad Aviation & Aeronautics Ltd., Ahmedabad, Gujarat

Engineering Technician January 2011- June 2011

• Designed wings and fuselage structure using CATIA

• Analyzed and maintained aircraft systems such as navigation, fuel, hydraulic, landing gear system

ACADEMIC PROJECTS

3PL Warehouse Management, GENCO ATC, Fort Worth

• Optimized storage space layout, work and process flow at GENCO ATC Fort Worth

• Visualized overall process and work flow using MS Visio

• Analyzed process development and improved current layout using Auto CAD

CW Sports Case Study (Material Handling Student Design Competition)

• Calculated the area and forecasted demand from year 2012-2016 of CW Sports using MS Excel

• Used AutoCAD to develop new facility for new data and new storage locations

• Organize plan, tasks, budget and workloads of the facility using MS Project

Glass dispenser automation

• Designed model of glass dispenser and its parts using Pro-E

• Analyzed various parts and represented its function

Ocean Shipping with focus on DFW Metroplex

• Collected data of different ports for ocean shipping and represented DFW Metroplex and its

locations.

• Examined project of Panama Canal Expansion and determined its benefits to DFW Metroplex

Time Study Measurement at General Motor Assembly Plant Arlington, TX

• Examined and Determined portion of the time of worker’s daily activities

• Observed normal time and calculated standard time and made time study sheet related to that

activities

Automatic Straw Dispenser

• Developed model of automatic straw dispenser by using sensor, DC motor, pulley and Acrylic Glass

• Examined speed and controlled power of DC motor and represented its applications for soda shop

CERTIFICATIONS

• Lean six sigma Green Belt certification course Ongoing

Institute of Industrial Engineers



Contact this candidate