Post Job Free
Sign in

Project Manager

Location:
Bangalore, KA, India
Posted:
October 17, 2013

Contact this candidate

Resume:

CURRICULUM VITAE

KASHINATH.K.C Working No:+971*********

E-mail: ***********@*****.***

Work Experience:

Period Designation & Company

April Deputy Manager, M/s. Yokogawa India Limited, Bangalore.

'06~Present Project Engineer in ABB Ltd, Bangalore

Dec'05~April' Project Engineer in ABB ltd in contract basis from ICPL.

06 Project Engineer in ICPL Bangalore

Dec'03~Dec

'05

June'03~Dec'0

3

Present work Location: Deputed to Yokogawa Dubai for the project.

Phone number: +971*********

Career Summary:

< 10.4 years of hand on experience in System and Project Engineering for

Process and industrial Automation.

< Proficiency and hand on experience in YOKOGAWA, ABB make DCS and AB

PLC.

< Interaction with the customer, process licensor and consultant for the

complete design of the DCS.

< Exposure to ABB Symphony Harmony (Infi 90) and Yokogawa CENTUM VP &

CS3000 systems.

< Exposure to Honeywell Field Instruments.

< Preparation of functional specifications of the project.

< Design and development of complete DCS application software.

(This includes complete DCS software like Close loop Control, Sequence

control, logging reports, sequence tables, logic charts, Graphics and

other HMI, etc.)

< Generation and Debugging of the same.

< Conducting Factory acceptance test (FAT) for system acceptance by

customer.

< Conducting Site acceptance test.

< Commissioning and Site support.

Training

Name of CS 3000 Fundamentals and Engineering.

course: Ekalavya Self Learning Training Module for CS

3000/1000.

Educational Qualification:

BE In "Instrumentation and Technology" From SJCE Mysore in 2003

Final Year aggregate: 82%

Computer skills:

1. C programming, Mat Lab, DSP.

2. Undergone Embedded system training from ISM Bangalore.

3. Microcontrollers.

4. Networking, basics of LINUX, WINDOWS.

Automation Products Familiar:

DCS System : CENTUM VP/CS3000/CS1000 (YOKOGAWA SYSTEM),

Symphony Harmony (ABB).

PLC : SLC 8

Serial Protocol : RS - 232, RS - 485, Ethernet.

Project Summary:

Period: Sept'11 to Till Date

Project: Total Laggan Tormore UK

Customer: TOTAL UK

Role: ASSISTANT MANAGER

Responsibili Front End Engineering- Understanding the

ty: Application/Plant requirements including design and

drawings.

TOTAL E&P Standards.

DCS of CENTUM VP R5.

Standard Function Logic generation and the document

generation for the same.

FAT for complex typical loop and the sequences.

Interaction with Customers to get the timely inputs and

design deliverables.

Design Validation Test for the above project

Functional Analysis document preparation

Interface Functional Analysis Document preparation,

generation and the testing.

Standard FDS preparation (Software, HMI, PRM, Historian

etc)

Alarm management procedure and the specification.

Alarm Management implantation for rationalizing the

alarms using CAMS

Process Functional Analysis generation and execution

Cyber Security

Network Management System

Cyber Security Risk assessment

Exaquantum database generation.

Subsystem Communication.

Period: Oct'10 to August'11

Project: JANA chemicals 120K epoxy resin

Customer: JANA CHEMICALS Saudi Arabia, Technip

Role: ASSISTANT MANAGER

Responsibili Front End Engineering- Understanding the

ty: Application/Plant requirements including design and

drawings. Managing the team of 4 people 1 graphics

programmer and 3 system engineers.

Preparation of FDS Document.

Customer interaction for getting the timely inputs.

Batch processing.

Recipe management.

ISA 88 model programming.

SEBOL programming

Quality checking and the improvements of the project

using various tools like database consistency etc.,

Getting the approval for the design documents with

customer.

Coordination between software and hardware engineering

team.

Batch programming for the 120K expansion plant.

Period: April'10 to Sept'10

Project: Reshadat Offshore Wellhead Platform

Customer: SADRA

Role: ASSISTANT MANAGER

Responsibili Front End Engineering- Understanding the

ty: Application/Plant requirements including design and

drawings. Managing the team of 3 people 1 graphics

programmer and 2 system engineers.

Preparation of FDS Document.

Customer interaction for getting the timely inputs.

SUB System communication.

Quality checking and the improvements of the project

using various tools like database consistency etc.,

Getting the approval for the design documents with

customer.

Coordination between software and hardware engineering

team.

Logic designing for wellhead platform.

Period: Aug'09 to July'10

Project: SOUTHPARS OIL AND GAS PROJECT

Customer: SOUTHPARS

Role: ASSISTANT MANAGER

Responsibili Front End Engineering- Understanding the

ty: Application/Plant requirements including design and

drawings. Managing the team of 6 people 2 graphics

programmers and 4 system engineers.

Preparation of FDS Document.

Conducted FAT for the above project in DUBAI.

Managing the Remote Engineering activities in India.

Customer interaction for getting the timely inputs.

SUB System communication.

Quality checking and the improvements of the project

using various tools like database consistency etc.,

Conducted training for above system.

Getting the approval for the design documents with

customer.

Coordination between software and hardware engineering

team.

Boilers and its complex loop and the sequence

designing.

Period: April ' 09 And July '09

Project: Khurais Refinery Project

Customer: SAUDI ARAMKO, Saudi Arabia

Role: ASSISTANT MANAGER

Responsibili Commissioning of the above mentioned project.

ty: Integration of 4 different projects.

Established plant wised single network.

Fieldbus device commissioning.

Layer 3 switch configuration.

Time synchronization of the network.

Boilers and utilities complex loop generation and its

sequence logic design.

Period: June'08 to March' 09

Project: SASREF ULSD Project, Ultra Low Sulphur Diesel refinery

plant.

Customer: SHELL, Saudi Arabia

Role: ASSISTANT MANAGER

Responsibili Front End Engineering- Understanding the

ty: Application/Plant requirements including design and

drawings.

Preparation of FDS Document.

Conducted FAT for the above project in BAHRAIN.

SEBOL programming for the complex loops.

Complex loops generation for Boilers and Power plant.

(Compressors)

SUB System communication with Bentley Nevada systems.

Data base generation using Y-GET tool and ENG tool.

Incinerator logic generation and debugging.

FDS, DDS preparations for approval from the customers.

Graphics generation/debugging Support.

Conducted training for above system.

ZMSSVC configuration.

Period: June'06 to June'08

Project: YANBU PETROCHEMICAL COMPLEX U & O, Executed from

Singapore

Customer: Yanbu Petro Chemical, Saudi

Role: System Engineer.

Responsibili Front End Engineering- Understanding the

ty: Application/Plant requirements including design and

drawings.

Preparation of FDS Document.

Conducted FAT for the above project in SINGAPORE.

SEBOL programming for the complex loops.

Complex loops generation for the incinerator package.

Complex loops generation for Boilers. (Contains Master

Pressure control, Fuel control, Oxygen control, Master

Fuel control, Temperature control)

SUB System communication with Triconex, Bentley Nevada

systems.

Data base generation using Y-GET tool and ENG tool.

Incinerator logic generation and debugging.

Supporting for Plant startup and commissioning in YANBU

PETROCHEMICAL COMPLEX in Saudi Arabia. System setup for

SAT, networking with the systems.

Coordinating with the customers for site engineering

activities.

FDS, DDS preparations for approval from the customers.

Involving in preparation of Bill of materials.

Graphics generation/debugging Support.

Conducted training for above system.

Period: Dec 03 to April 06 in ABB

DCS: Symphony Harmony Infi 90.

Project: Gujarat Mineral and Development Power Project 2X125 MW

(ABB). (FAT, ENGINEERING, COMMISSIONING)

Jindal Thermal Power Project (FAT, ENGINEERING)

Vindyachal Power Project (FAT, ENGINEERING)

Customer: GMDC, JINDAL, NTPC

Role: Project Engineer

Responsibili Front End Engineering- Understanding the

ty: Application/Plant requirements including design and

drawings.

I/o list preparation: Preparing I/O list which included

interaction with customer / consultant, P & ID's and

point database etc.

IO loading, Node assignment, BOM preparation.

The Engineering of the above project using Composer

(Logics) and Process portal (HMI).

System Engineering:

Panel Hardware setup.

System Configuration.

Networking and communication with system.

Engineering and commissioning of OLCS.

Engineering and commissioning of CLCS like Fuel

control, Drum Level control, Combustion air Control,

Temperature control of super heater and re-heater.

Sequence Event Recording implementation and

commissioning.

MODBUS commissioning with SEIMENS, Rockwell Automation

PLC systems.

UMC Implementation. (Unit Master Control).

Sequential logic controls of drives like FD Fan, ID

Fan, PA Fan Etc.

Annunciation system.

Vibration monitoring systems.

PLC Rockwell Automation.

Training to the customer on the DCS.

Period: June 03 to Dec 03 in ICPL

Project: Commissioning and Erection of Blast Furnace (ICPL)

Customer: JINDAL VIJAYANAGAR STEELS

Role: Project Engineer

Responsibili Commissioning of field equipments.

ty: Electrical Panel Erection and commissioning.

PLC commissioning.

Personal Data:

Age : 32 years.

Nationality : Indian.

Marital Status : Married.

Father's Name : R.C. Krishnamurthy Setty.

Languages known : English, Hindi, Kannada, Telugu.

Date:

Place: Bangalore (KASHINATH.K.C)



Contact this candidate