CURRICULUM VITAE
KASHINATH.K.C Working No:+971*********
E-mail: ***********@*****.***
Work Experience:
Period Designation & Company
April Deputy Manager, M/s. Yokogawa India Limited, Bangalore.
'06~Present Project Engineer in ABB Ltd, Bangalore
Dec'05~April' Project Engineer in ABB ltd in contract basis from ICPL.
06 Project Engineer in ICPL Bangalore
Dec'03~Dec
'05
June'03~Dec'0
3
Present work Location: Deputed to Yokogawa Dubai for the project.
Phone number: +971*********
Career Summary:
< 10.4 years of hand on experience in System and Project Engineering for
Process and industrial Automation.
< Proficiency and hand on experience in YOKOGAWA, ABB make DCS and AB
PLC.
< Interaction with the customer, process licensor and consultant for the
complete design of the DCS.
< Exposure to ABB Symphony Harmony (Infi 90) and Yokogawa CENTUM VP &
CS3000 systems.
< Exposure to Honeywell Field Instruments.
< Preparation of functional specifications of the project.
< Design and development of complete DCS application software.
(This includes complete DCS software like Close loop Control, Sequence
control, logging reports, sequence tables, logic charts, Graphics and
other HMI, etc.)
< Generation and Debugging of the same.
< Conducting Factory acceptance test (FAT) for system acceptance by
customer.
< Conducting Site acceptance test.
< Commissioning and Site support.
Training
Name of CS 3000 Fundamentals and Engineering.
course: Ekalavya Self Learning Training Module for CS
3000/1000.
Educational Qualification:
BE In "Instrumentation and Technology" From SJCE Mysore in 2003
Final Year aggregate: 82%
Computer skills:
1. C programming, Mat Lab, DSP.
2. Undergone Embedded system training from ISM Bangalore.
3. Microcontrollers.
4. Networking, basics of LINUX, WINDOWS.
Automation Products Familiar:
DCS System : CENTUM VP/CS3000/CS1000 (YOKOGAWA SYSTEM),
Symphony Harmony (ABB).
PLC : SLC 8
Serial Protocol : RS - 232, RS - 485, Ethernet.
Project Summary:
Period: Sept'11 to Till Date
Project: Total Laggan Tormore UK
Customer: TOTAL UK
Role: ASSISTANT MANAGER
Responsibili Front End Engineering- Understanding the
ty: Application/Plant requirements including design and
drawings.
TOTAL E&P Standards.
DCS of CENTUM VP R5.
Standard Function Logic generation and the document
generation for the same.
FAT for complex typical loop and the sequences.
Interaction with Customers to get the timely inputs and
design deliverables.
Design Validation Test for the above project
Functional Analysis document preparation
Interface Functional Analysis Document preparation,
generation and the testing.
Standard FDS preparation (Software, HMI, PRM, Historian
etc)
Alarm management procedure and the specification.
Alarm Management implantation for rationalizing the
alarms using CAMS
Process Functional Analysis generation and execution
Cyber Security
Network Management System
Cyber Security Risk assessment
Exaquantum database generation.
Subsystem Communication.
Period: Oct'10 to August'11
Project: JANA chemicals 120K epoxy resin
Customer: JANA CHEMICALS Saudi Arabia, Technip
Role: ASSISTANT MANAGER
Responsibili Front End Engineering- Understanding the
ty: Application/Plant requirements including design and
drawings. Managing the team of 4 people 1 graphics
programmer and 3 system engineers.
Preparation of FDS Document.
Customer interaction for getting the timely inputs.
Batch processing.
Recipe management.
ISA 88 model programming.
SEBOL programming
Quality checking and the improvements of the project
using various tools like database consistency etc.,
Getting the approval for the design documents with
customer.
Coordination between software and hardware engineering
team.
Batch programming for the 120K expansion plant.
Period: April'10 to Sept'10
Project: Reshadat Offshore Wellhead Platform
Customer: SADRA
Role: ASSISTANT MANAGER
Responsibili Front End Engineering- Understanding the
ty: Application/Plant requirements including design and
drawings. Managing the team of 3 people 1 graphics
programmer and 2 system engineers.
Preparation of FDS Document.
Customer interaction for getting the timely inputs.
SUB System communication.
Quality checking and the improvements of the project
using various tools like database consistency etc.,
Getting the approval for the design documents with
customer.
Coordination between software and hardware engineering
team.
Logic designing for wellhead platform.
Period: Aug'09 to July'10
Project: SOUTHPARS OIL AND GAS PROJECT
Customer: SOUTHPARS
Role: ASSISTANT MANAGER
Responsibili Front End Engineering- Understanding the
ty: Application/Plant requirements including design and
drawings. Managing the team of 6 people 2 graphics
programmers and 4 system engineers.
Preparation of FDS Document.
Conducted FAT for the above project in DUBAI.
Managing the Remote Engineering activities in India.
Customer interaction for getting the timely inputs.
SUB System communication.
Quality checking and the improvements of the project
using various tools like database consistency etc.,
Conducted training for above system.
Getting the approval for the design documents with
customer.
Coordination between software and hardware engineering
team.
Boilers and its complex loop and the sequence
designing.
Period: April ' 09 And July '09
Project: Khurais Refinery Project
Customer: SAUDI ARAMKO, Saudi Arabia
Role: ASSISTANT MANAGER
Responsibili Commissioning of the above mentioned project.
ty: Integration of 4 different projects.
Established plant wised single network.
Fieldbus device commissioning.
Layer 3 switch configuration.
Time synchronization of the network.
Boilers and utilities complex loop generation and its
sequence logic design.
Period: June'08 to March' 09
Project: SASREF ULSD Project, Ultra Low Sulphur Diesel refinery
plant.
Customer: SHELL, Saudi Arabia
Role: ASSISTANT MANAGER
Responsibili Front End Engineering- Understanding the
ty: Application/Plant requirements including design and
drawings.
Preparation of FDS Document.
Conducted FAT for the above project in BAHRAIN.
SEBOL programming for the complex loops.
Complex loops generation for Boilers and Power plant.
(Compressors)
SUB System communication with Bentley Nevada systems.
Data base generation using Y-GET tool and ENG tool.
Incinerator logic generation and debugging.
FDS, DDS preparations for approval from the customers.
Graphics generation/debugging Support.
Conducted training for above system.
ZMSSVC configuration.
Period: June'06 to June'08
Project: YANBU PETROCHEMICAL COMPLEX U & O, Executed from
Singapore
Customer: Yanbu Petro Chemical, Saudi
Role: System Engineer.
Responsibili Front End Engineering- Understanding the
ty: Application/Plant requirements including design and
drawings.
Preparation of FDS Document.
Conducted FAT for the above project in SINGAPORE.
SEBOL programming for the complex loops.
Complex loops generation for the incinerator package.
Complex loops generation for Boilers. (Contains Master
Pressure control, Fuel control, Oxygen control, Master
Fuel control, Temperature control)
SUB System communication with Triconex, Bentley Nevada
systems.
Data base generation using Y-GET tool and ENG tool.
Incinerator logic generation and debugging.
Supporting for Plant startup and commissioning in YANBU
PETROCHEMICAL COMPLEX in Saudi Arabia. System setup for
SAT, networking with the systems.
Coordinating with the customers for site engineering
activities.
FDS, DDS preparations for approval from the customers.
Involving in preparation of Bill of materials.
Graphics generation/debugging Support.
Conducted training for above system.
Period: Dec 03 to April 06 in ABB
DCS: Symphony Harmony Infi 90.
Project: Gujarat Mineral and Development Power Project 2X125 MW
(ABB). (FAT, ENGINEERING, COMMISSIONING)
Jindal Thermal Power Project (FAT, ENGINEERING)
Vindyachal Power Project (FAT, ENGINEERING)
Customer: GMDC, JINDAL, NTPC
Role: Project Engineer
Responsibili Front End Engineering- Understanding the
ty: Application/Plant requirements including design and
drawings.
I/o list preparation: Preparing I/O list which included
interaction with customer / consultant, P & ID's and
point database etc.
IO loading, Node assignment, BOM preparation.
The Engineering of the above project using Composer
(Logics) and Process portal (HMI).
System Engineering:
Panel Hardware setup.
System Configuration.
Networking and communication with system.
Engineering and commissioning of OLCS.
Engineering and commissioning of CLCS like Fuel
control, Drum Level control, Combustion air Control,
Temperature control of super heater and re-heater.
Sequence Event Recording implementation and
commissioning.
MODBUS commissioning with SEIMENS, Rockwell Automation
PLC systems.
UMC Implementation. (Unit Master Control).
Sequential logic controls of drives like FD Fan, ID
Fan, PA Fan Etc.
Annunciation system.
Vibration monitoring systems.
PLC Rockwell Automation.
Training to the customer on the DCS.
Period: June 03 to Dec 03 in ICPL
Project: Commissioning and Erection of Blast Furnace (ICPL)
Customer: JINDAL VIJAYANAGAR STEELS
Role: Project Engineer
Responsibili Commissioning of field equipments.
ty: Electrical Panel Erection and commissioning.
PLC commissioning.
Personal Data:
Age : 32 years.
Nationality : Indian.
Marital Status : Married.
Father's Name : R.C. Krishnamurthy Setty.
Languages known : English, Hindi, Kannada, Telugu.
Date:
Place: Bangalore (KASHINATH.K.C)