Post Job Free
Sign in

Engineer Project

Location:
India
Posted:
October 16, 2013

Contact this candidate

Resume:

Name : J. Sasi Kumar

Nationality : Indian

Date of Birth : 16th September 1979

Profession : Civil Engineer

Qualification : B. Tech., Civil Engineering, Madras

University, Kanchipuram, (T.N) April, 2003

Diploma in Railway Engineering, Institute of

Permanent Way Engineer (INDIA), April 2008.

Post Diploma in Concrete Technology & Concrete

Structure. Annamalai University April2003

Diploma in Rail Transport & Management, Institute of

Rail Transport & Management, April 2002.

Diploma in Civil Engineering, Sri Nallaghu,

Polytechnic.Redhills, April, 2000

Key Experience : A Highway Design Engineer by Profession with

Civil Engineering background and Professional

experience nearly Ten years in the fields of

Highway Engineering, By using AutoCAD Civil 3D

& MX-Road software for Road design, Geometric

design, Preparation of Detailed Project Report

and Feasibility Report, Co-ordination of

detailed engineering surveys and

investigations.

Employment Record:

Present Employer : Khatib & Alami (CEC), Sharjah

U.A.E.

Period : From May 2008 to July 2013.

Position : Project Engineer.

Projects

1. Roads & Infrastructure in Muwailah Land Development, -

Planning, Grading & Infrastructure development for an area of

some 165 hectares, Sharjah U.A.E

Client : Directorate of Public Works

Government of Sharjah

2. Muwailah Commercial, - Infrastructure development for an area

of some 386 hectares, Sharjah U.A.E

Client : Directorate of Public Works

Government of Sharjah

3. Sharjah Internal Roads in Central Regions, Sharjah U.A.E

. Package - 1 (Hamda, Al Sajaa, Tal Zafraan, Ruwaida, Al

Harf, Um Fneen Areas)

. Package - 2 (Weshah, Sidra & Tayyiba Areas )

. Package -3 (Zubaida, Al Khatam Al Karam, Towa Fatima,Al

Khawaled, Bin Madan & Mashey Areas, Mubarak Naseeb,

Khasony, Shibani & Khamees Areas)

Client : Directorate of Public Works

Government of Sharjah

4. Site Grading and Road works for H.H.Sultan Al Qassimic

Residence Complex Phase - I, Sharjah U.A.E

Client : Directorate of Public Works Government of

Sharjah

5. Pearl Jumeira Island - Merras Land Development - 70 hectares,

Sharjah U.A.E

Client : MERAAS Land Development, Dubai

6. ASAS Land Development in Juwaiza, Sharjah U.A.E

Client : ASAS Land Development, Sharjah

7. Azhar University in Gaza, Palestine

Client : Azhar University, Palestine

8. H.H. Investment & Development Roadworks in Jebel Ali

Industrial Area, Dubai U.A.E

Client : H.H. Investment is Creation

9. New General Hospital at Muscat, Oman

Client : Government of Muscat

10. Al Khoula Hospital - Phase - 8, Oman

Client : Ministry of Health, Oman.

11. Emirates Sharjah Roads & Infrastructure Development in Al

Rahumainya Residential Area, Sharjah U.A.E

Client : Sharjah Municipality - Government of

Sharjah. U.A.E

12. Earth work Grading & Plot Corner Levels for the Sajaa

Industrial area at Sharjah (1780 ha) Sharjah U.A.E

Client : Sharjah Town Planning & Survey Department

(DTPS), Government of Sharjah. U.A.E

13. Improvement, Development, Upgrading and dualisation of Dibba-

Masafi Road, Stage II Part II (Gona to Masafi), Sharjah

UAE

Client : Ministry of Public Works UAE

14. Access Road & Internal Roads in Mahila Market Complex in

Mahila Central Region, Sharjah U.A.E

Client : Directorate of Public Works Government of

Sharjah

Responsibilities:

> Responsible for finalization and modification in

Highway design and drawings pertaining to horizontal/

vertical alignment and geometric design of the

project road (using MX - Road, AutoCAD Civil 3D, Land

Development Desktop software and Auto CADD), etc.

> Preparing the Plan & Profile drawings as per client

requirement.

> For the design of road geometry, ancillary works,

computation of quantities for major urban and rural

highway scheme.

> Design of Junction & roundabouts.

> Preparing the tender drawings.

> Regular site inspection & send the review & comments.

> Finalizing the Geometric Design as per AASHTO & Dubai

Municipality Standards.

Previous Employer : Intercontinental Consultants

Technocrats Private Limited New Delhi,

INDIA.

Period : From July 2006 to May2008

Position : Design Engineer.

Projects

March 2008, Independent Consultancy Services for 4 Laning of

Islam Nagar to Kadtal from 230+000 to 278+000 of Nagar to

Hyderabad section of NH -7 in the State of Andhra Pradesh

(Package No NS2/IC/AP-7).

January 2008, Independent Consultancy Services for 4 Laning of

Thirssur (270+000) to Edapally (342+000) Section of NH - 47 in

the State of Kerala on BOT Basis (Consultancy Package KL - 1)

September 2007, Independent Consultancy Services for 4 Laning of

Namakkal-Karur Section of NH-7 from Start of Proposed Flyover at

Namakkal (Km. 248.625) to Start of Karur Bypass (Km. 292.600) in

the State of Tamil Nadu on North-South Corridor Under Phase II

Programme of NHDP (Consultancy Package No. NS-2/IC/TN-3)

March 2007, Independent Consultancy Services for Design,

Engineering, Construction, Development, Finance, Operation and

Maintenance of 4 Laning the existing 2 Lanes section from Km 121

(near Tindivanam) to Km 192.25 (near Ulundurpet) on NH-45 in

state of Tamil Nadu on BOT basis (Package VI-A)

July 2006, Independent Consultancy Services for 4/6 Laning of NH-

7 from Jadcherla(Km 80.050) to end of Kotakota bypass( Km

135.469) in the state of Andra Pradesh on North - South

Corridor under Phase -II Programme of NHDP.

Client : National Highway Authority of India (NHAI), INDIA

Responsibilities:

> Design Engineer, Responsible for finalization and

modification in Highway design and drawings

pertaining to horizontal/ vertical alignment and

geometric design of the project road (using MX - Road

software and Auto CADD), etc. and Assist the Team

Leader in Highway design issues.

> Checking the Plan & Profile prepared by contractor as

per Standards & send the Comments to the

Concessionaire.

> And if any Modification or Deviation in the

Horizontal & Vertical Alignment has to be informed to

you client.

> And Preparation of Monthly Progress Report.

Previous Employer : Wilbur Smith Associates Pvt. Ltd.,

Chennai, Tamil Nadu, India

Period : From April 2003 to June 2006

Position : Highway Engineer.

Projects

A) 2006, Preparation of Detailed Feasibility Report for Construction of

a link road from Light House on Kamarajar Salai to Besant Nagar

(Via) Santhome Bypass, Sreenivasapuram, Uoorurkuppam (length 10 km,

two lanes) including construction of a high level Bridge across

Adyar Estuary to join ECR.

Client : Highways Department, GoTN.

Responsibilities:

> Fixing of new alignment for bypasses for about 10Km

from Radhakrishnan salai to Kottivakkam beach using

the MX - Road Software and Auto CADD.

> Preparation of Detailed Project report.

> Finalizing the Geometric Design as per IRC Standards

> Designing of new flexible pavement as per IRC

standards

B) 2006,Preparation of Feasibility Study and Detailed Project Report

for four / six laning of Nagapattinam - Thanjavur - Trichy Section

(length 135.6 km) of NH-67 in the State of Tamil Nadu under NHDP

Phase lit - Package No. NHDP - III/DL4/17

Client : National Highway Authority of India (NHAI), INDIA.

Responsibilities:

> Design of Highway Geometrics for the proposed

widening Scheme of Existing Two Lane Road to Four

Lane Road Using MX ROAD.

> Finalizing the Geometric Design & Pavement Design as

per IRC Standards

> Analysis of BBD Data.

> Co-ordination of Topographical Survey, Benkelman Beam

Deflection and Road Inventory

> Finalizing eight bypass stretches like Vallam Bypass

(3.5 km), Poondi Bypass (2 km), Saliyamangalam Bypass

(3.5 km), Ammapet Bypass (2 km), Needamangalam Bypass

(18 km), Ammiayappan Bypass (1.5 km), Adikamangalam

Bypass (3.5 km), Nagapattinam Bypass (14 km)

(C) 2005, Integrated Infrastructure Development of Thiru Vi Ka

Industrial Estate, Guindy, Chennai.

Client : TNRDC (Tamil Nadu Road Development Company),

Chennai.

Responsibilities:

> Finalization of pavement Cross Section and Alignment.

> Preparation of Detailed Project report.

> Analysis of BBD Data.

> Co-ordination of Topographical Survey, Benkelman Beam

Deflection and Road Inventory

> Finalizing the Geometric Design as per IRC Standards

(D) 2005, Preparation of Detailed Project Report for Kerala High Speed

Corridor (km 0 to km 300)

Client : PWD Kerala

Responsibilities:

> Fixing a new Alignment for about 0 to 40Km Stretch

> Detailed engineering surveys and investigations.

> Fixing a new Alignment by taking control points using

handle GPS.

(E) 2005, Preparation of Detailed Project Report for Upgradation and

Strengthening of Roads under TNUDP, Phase III, Minjur - Karanodai

Road (km 0/0 to km 16/4), Minjur - Kattur -Tirupalaivanam Road (km

0/0 to km 17/4), Tiruvotriyur - Ponneri -Panjetti Road (km 13/4 to

km 28/0) and Ariyalur - Vilangadupakkam Road (km 0/0 to km 6/4),

Client : Highways Department, GoTN

Responsibilities:

> Design of Highway Geometrics for the Existing Single

Lane Road to Two Lane Road Using MX ROAD.

> Detailed engineering surveys and investigations.

> Analysis of BBD Data.

> Finalizing the Geometric Design as per IRC Standards

> Co-ordination of Topographical Survey, Benkelman Beam

Deflection and Road Inventory

> Fixing a new bypass Alignment by taking control

points using handle GPS.

(F) 2004, Strengthening and widening of Manali Oil Refinery Road (MORR)

and Inner Ring Road (IRR) (length 15 km), Chennai, Tamil Nadu.

Client : TNRDC (Tamil Nadu Road Development Company), Chennai.

Responsibilities:

> Design of Highway Geometrics and Alignment proposal

and widening Scheme of Existing Road using MX ROAD.

> Field Supervision and checking of Topographical and

Geo-technical surveys

> Designing of new flexible pavement and overlay as

per IRC standards

> Preparation of project reports

(G) 2004, Detailed Engineering Study for Old Mahabalipuram Road (IT

Corridor) (km 0/0 to km 30/4), Chennai, Tamil Nadu.

Client : TNRDC (Tamil Nadu Road Development Company),

Chennai.

Responsibilities:

> Design of Highway Geometrics and Alignment proposal

and widening scheme of Existing Road using MX ROAD.

> Analysis of BBD Data.

> Preparation of Detailed Project report.

> Designing of new flexible pavement and overlay as

per IRC standards

(H) 2003, Feasibility Study / Detailed Engineering studies for

Improving Old Mahabalipuram Road from Siruseri Junction of East

Coast Road (OMR) (km 30/2 to km 54/6), Chennai.

Client : TNRDC (Tamil Nadu Road Development Company)

Responsibilities:

> Design of Highway Geometrics and Alignment proposal

and widening Scheme of Existing Road using MX ROAD.

> Analysis of BBD Data.

> Preparation of Detailed Project report.

> Designing of new flexible pavement and overlay as

per IRC standards

> Fixing of By Pass using GPS at Densely Built-up

Location.

(I) 2003, Detailed Engineering Study for Tiruvotriyur-Ponneri-Panjetti

Road (TPP) Road (Strengthening and widening to four lanes), Chennai,

Tamil Nadu (km4/4 to km 13/4).

Client : TNRDC (Tamil Nadu Road Development Company)

Responsibilities:

> Design of Highway Geometrics and Alignment proposal

and widening Scheme of Existing Road using MX ROAD.

> Analysis of BBD Data.

> Preparation of Detailed Project report.

> Designing of new flexible pavement and overlay as

per IRC standards

Language and Degree of Proficiency:

Languages Speaking Reading Writing

English Excellent Excellent Excellent

Tamil Excellent Excellent Excellent

PERSONAL DETAILS:

Name : Sasi kumar.J

Sex : Male.

Date of Birth : 16.09.1979

Martial status : Married.

Permanent address : V.V. Homes

Block F-2, First Floor

No.11, Valamiki Street Sri Devi Nagar,

Annanur Chennai-600109.

TamilNadu, INDIA.

Cell No : +91-893******* (India)

Email : *********@*****.***

PASSPORT DETAILS:

Passport No : K8430204

Place of Issue : Dubai

Date of Issue : 16/01/2013

Date of Expiry : 15/01/2023

DECLARATION

I declare that the above details furnished by me are correct and true to

the best of my knowledge.

Place :

Date :

Signature

(SASI KUMAR.J.)



Contact this candidate