CURRICULUM VITAE
< Jonson L. Simanjuntak >
PERSONAL INFORMATION
Name : Jonson L. Simanjuntak
Address : Buana Vista Blok J 38, Batam Island-Indonesia
Phone : (+62 ) 085*-********
Email : ********@****.***
Gender : Male
Place/date of birth : Pekan Baru, February 17th, 1973
Marital Status : Married
Last Position : Field Instrument Engineer
Passport No : U207826
B. EDUCATION BACKGROUND
Bachelor Degree of Institute Technology Medan ( Electro ) on july 5th
2000
C. PROFESSION
Electrical & Instrument Engineer
D. SUMMARY OF QUALIFICATIONS
More than 7 years overall total experienced already in Electrical &
Instrumentation, Construction & Maintenance in Oil & Gas Project and
understood at work sequence, specification,especially for electrical and
instrumentation with or without under supervised be willing self innovated
. General work coordination to maintain highest possible performance
including planning method and supervise in summary duties : Electrical &
Instrument Construction, Electrical load and unload test system,
Termination low and high voltage ( Transmission line ), Instrumentation
test, loop check and commissioning, Control system substantial and trouble
shooting, Fabrication and modification, Electrical & Instrument Quality
Control and Maintenance.
E. COURSES / TRAININGS
. T-Bosiet Training by M&O Batam, 07 oct 2013
. Hazardous Area Awareness Training by PT.Mcdermott 0n June 9th, 2010.
. Permit to Work Coordinator Training by Commissioning Manager of North
Belut Project ( Conoco Phillips ) on January 7th, 2009
. Performing Authority Training Course by Commissioning Manager of North
Belut Project ( Conoco Phillips ) on December 9th 2008
. Permit to Work & Confined Space Training by PT.Mcdermott Batam on
November 4th, 2008.
. Combined Sea Survival,First Aid,Fire Fighting & Travel safely by Boad
Training by MSTS on july 2008
. Oil & Gas Industries Instrument Inspector by Yayasan IKBAL-M-YOS (
Certified by SGS, UKAS, APITINDO ) on October 2007.
. Confined Space Entry and Permit to Work by British Safety Council on
August 2007
. Quality Management System Training by IKBAL-M-YOS on June 2007
. Elevated Working Platform by Australian Skills Training on September 2007
. Medium Air Compressor Operation Training by Atlas Copco on July 2006
. For successfully completing the 1 day Powerwave AC/DC 1000 Maintenance
Training by Lincoln Electric Company ( Asia facific ) on March 2006.
. Overhead Traveling Crane Training by McDermott on October 2005.
. 3 Days Basic Safety and Orientation Management Training by PT Mcdermott
on October 2005.
E. OTHER CERTIFICATES
* Certificate of Appreciation for outstanding performance and continued
support rendered during the offshore construction phase of Su Tu Vang CPP
Hook Up and Commissioning project, Vietnam on October 2008.
* Certificate of appreciation for effort in doing excellent job on the
Completion support to the Woodside Project by Completion Department-PT
McDermott on December 2006.
* Special Recognition for Outstanding Performance as part of the E&I
Construction and Inspection by Foster Wheeler-Worley JV on May 2007.
F. SPECIAL SKILL
. Equipment, especially in Welding machine,Generator Set and
Overhead Crane
. Electrical, especially in Central Processing Platform ( CPP )
electric process
. Computer package software ( Windows xP, Vista and Ms Office )
G. PROFESSIONAL WORKING EXPERIENCE
1 Period July 2013 up to present
Company PT. SMOE Indonesia
Position Commissioning PTW Coordinator
Project Naga & Pelikan Wellhead Platform, Client by Primer Oil Natuna
Sea B.V
Job Verify that the scope of work is clearly defined on all CP
Descripti applications.
on Verify that all isolations, safety requirements and precautions
and support documents are specified on each CP application.
Verify that all isolations, safety requirements and
documentation are in place before issuing a Commissioning
Permit.
Verify from the permit data base that a Commissioning Permit is
not issue for a job, which may conflict with another task
creating a hazardous situation and advise Authorized Signatory
accordingly.
Provide list of work related permits and scope on the new
commissioning permit.
Verify that the Commissioning Permit Holder understand the work
scope, safety requirements and precautions.
Prepare and subsequently submit Non Permit Activities List at
each SCM meeting.
Administer the Commissioning Permit Office.
Maintain an accurate record of the range and status of all
activities for which a commissioning permit has been issued.
Archiving of completed commissioning permits.
Maintain a register systems, sub-systems area that have reached
Ready for Non Hydrocarbon Commissioning ( RFNHC ) and that have
been handed over to the commissioning team.
Maintain a record of live systems/subsystems in permit office.
2 Period November 2009 - 25 May 2011
Company PT. Mcdermott Indonesia
Position : Field Instrument Engineer
Project : ESSO KTT Project at Mcdermott Fabrication Yard, Batam
Descripti Island-Indonesia
on
Job Understand and implement Engineering polices and yard
Descripti procedures though working practice.
on Attending training and provide feedback or improvements as
required.
Check material availability includes drop off management
Prepare drop of list status periodically.
Ensure yard is supplied with the correct materials and drawings
to meet the schedule requirement.
Assist. Production Engineer to ensure materials, fabrication
and installation are in accordance with drawings and
specifications.
Follow up material Issued request ( MIR ) and monitor material
movements.
Assist in the verification of the test lines ( as line walk )
and confirming which are ready for testing,clearing
construction punch list and performance of any testing if
required.
Coordinate with shop engineer/warehouse personnel in
reconciliation of drop off materials.
Support and adhere of the implementation of safe working
practice, high quality, productivity and compliance with the
code business conducts.
High standard of safe working practice, quality and
productivity as well as compliance with the code of business
conducts.
3 Period December 2008 - September 2009
Company PT. Mcdermott Indonesia
Position : Commissioning PTW Coordinator
Project : CPP North Belut Project Client by Conoco Phillips
Descripti
on
Job Issuing and subsequent control of the PTW system on the
Descripti site.Routine site tours monitoring permit to work usage
on .Ensuring the correct permit and or isolating certificates are
used.Ensuring the correct signs, tags and locks are used.Act as
a focal point for all matters relating to permits issue and
control.Ensures area permit co-ordination plans are in place
and observed.Maintains a permit register of all permit issued
and returned.Checks permit expiry dates and control all
re-validations .Ensure all necessary documents to support the
permit are attached complete with the relevant cross
referencing ( E.g Isolating certificates,vessel entry permits,
etc).Monitoring all permits on a regular basis,by ensuring
regular inspections of the permits logged in the permit office
and in the field.Ensures that re-issue and re-validation are
completed at required times during the duration of the
permit(s).
4 Period April 2007 up to October 2008
Company PT. Mcdermott Indonesia
Position : Mechanical Completion for Electrical and Instrument
Project : CPP Su Tu Vang Project Client by Cuu Long Joint Operating
Descripti Company
on
Job Interpretation, Review and Check Specifications, Procedures,
Descripti Code, and ITP (Inspection & Test Plan) for Modification
on Prepared, Check actual and Executions Plant is a Process that
has been developed as a result of Engineering Technical
Integrity into the design, drawings, planning, certification,
construction, commissioning, maintenance and operational
activities of a facility
Joint Inspection with the Client for checking, verification and
testing of fabrication, construction and installation work
performed by the respective contractors & sub-contractors in
order to confirm that the applicable Rules, Regulations, Codes
& Standards are being met and that the Project requirements as
shown on the design drawings and outlined in the specifications
are fulfilled
To ensure Human Safety Environment Regulations applied in every
steps of the E & I works
Coordinate with Safety Officer in practicing safety regulations
and safety programs
5 Period Feb 2007 up to July 2007
Company PT. Mcdermott Indonesia
Position : Mechanical Completion for Electrical and Instrument
Project : Kerisi MSF Project, Client by Conoco Phillips
Descripti
on
Job Interpretation, Review and Check Specifications, Procedures,
Descripti Code, and ITP (Inspection & Test Plan) for Modification
on Prepared, Check actual and Executions Plant is a Process that
has been developed as a result of Engineering Technical
Integrity into the design, drawings, planning, certification,
construction, commissioning, maintenance and operational
activities of a facility
Joint Inspection with the Client for checking, verification and
testing of fabrication, construction and installation work
performed by the respective contractors & sub-contractors in
order to confirm that the applicable Rules, Regulations, Codes
& Standards are being met and that the Project requirements as
shown on the design drawings and outlined in the specifications
are fulfilled
To ensure Human Safety Environment Regulations applied in every
steps of the E & I works
Coordinate with Safety Officer in practicing safety regulations
and safety programs
6 Period March 2006 up to Jan 2007
Company PT. Mcdermott Indonesia
Position : Mechanical Completion for Electrical and Instrument
Project : Woodside LNG Phase V Expansion Project, Client by Foster
Descripti Wheeler Energy.
on
Job Interpretation, Review and Check Specifications, Procedures,
Descripti Code, and ITP (Inspection & Test Plan) for Modification
on Prepared, Check actual and Executions Plant is a Process that
has been developed as a result of Engineering Technical
Integrity into the design, drawings, planning, certification,
construction, commissioning, maintenance and operational
activities of a facility
Joint Inspection with the Client for checking, verification and
testing of fabrication, construction and installation work
performed by the respective contractors & sub-contractors in
order to confirm that the applicable Rules, Regulations, Codes
& Standards are being met and that the Project requirements as
shown on the design drawings and outlined in the specifications
are fulfilled
To ensure Human Safety Environment Regulations applied in every
steps of the E & I works
Coordinate with Safety Officer in practicing safety regulations
and safety programs
7 Period Feb 2006 up to March 2006
Company PT. Mcdermott Indonesia
Position : As Commissioning E&I Technician
Project : Keppel Fells Mobile Drilling Units Project, Client by
Descripti Keppels Fels
on
Job Pre-commissioning of all Electrical Motors, by checking,
Descripti verification and unload testing
on
8 Period October 18th,2002 up to October 6th,2004
Company PT. Mcdermott Indonesia
Position : As Electrical Technician
Project :
Descripti
on
Job Routine maintenance for Company s Electrical
Descripti Equipment.Repairing and trouble shooting, testing and
on calibration of electrical and instrument equipment.
Responsible for any " call out" during plant emergency trouble
and perform other duties as may assigned.
9 Period July 26th, 2000 up to October 5th, 2000
Company PT.Kwarta Daya Dirganusa
Position : As Electrical Technician
Project : Central Gathering Station Are 10 - Caltex Facific Indonesia
Descripti Project
on
Job Was worked in construction to fabricate support,cable tray of
Descripti electrical and instrument and install them as per location
on drawing.Pulling cables from control room to junction box and to
equipment/Field instrument device.Glanding cables and
terminated wires as per electrical and instrument
interconnection drawing,continuity check and meggering cables.
G. REFERENCES
Mr.Pablo Varona
Hook-up & Commissioning Manager
Email address : *******@*********.***
Mr. Elmer Luna Mustard
Lead Production Engineer ( E & I )
Email address : *********@*********.***
Mr.Abdul Rozaq Albaqi.
Production Engineer ( Instrument )
Email address : ********@*********.***
All information is true as best my knowledge, for your attention and
consideration thanks you.
Best Regards.
( Jonson L. Simanjuntak )