Kola Olaniyi MSc. BSc.
**** ********* ***** ******* ** 23435, Virginia, USA.
Cell: +1-757-***-**** Home Num: +1-757-***-****
Email:****.********@*****.***
http://uk.linkedin.com/in/kolaolaniyi
An Experienced Project Scheduler's profile
A seasoned project controls specialist with over 8 years international
experience with a proven track record of successes working on mega EPC &
Capital engineering projects covering -: construction, utilities (power
transmission & distribution, water & gas) & highways/civil engineering
projects. An enthusiastic individual with advanced experience in project
management, change and risk management, continuous improvement initiatives,
managing system schematics, scheduling and planning workloads, including
training & managing other planners, managing plans and projects from
inception phase to completion phase and delivering projects to required
specifications/standards, focusing on time, costs, health and safety,
reliability, quality and sustainability; a good team player with strong
organizational and problem solving skills, confident and able to
communicate effectively with work colleagues at all levels; recently just
relocated to the United States and currently looking to develop my career
further with an organization that offers sustainable career progression,
learning and training opportunities.
Areas of Expertise
Sustainable Construction Facilities/Asset Project & Site
Methods Management Management
Health and Safety/Powerpoint Project Planning & Quality & Cost
Controls Control
Value Engineering SAP/ Claims Mgt/S-Curves Tender Planning
Highways/Civil Engineering Risk / Earned Value Mgt Primavera 6.2, 8.2
Design & Build; Framework Project MS Project/Office
Contract Appraisal/Evaluation Packages
Strong organization Power Distribution Performance Tracking
skills/Excel Construction of Gantt & Reporting (CPI &
Critical Path Analysis Charts & Time Phased SPI)
EPC Programmes & Lifecycle Diagrams Scheduling/PERT
Procurement/Resource Water & Gas Distribution Analysis
Planning projec Outage Planning
Academic qualifications & Awards
University of Lincoln Master of Science, Construction Project Dec 2009
Management
Obafemi Awolowo Bachelor of Science, Building Technology Nov 2006
University Nigeria
UKPN Olympic Delivery Team & Utility of the Year 2012 Award
Career History, Professional Experience And Significant Achievements
P6 Programme Planner (Capital Projects) June
2012- Aug 2013
UK Power Networks, Kent, UK (Portfolio Management of EPC Capital Projects
with a budget - $100M/year)
. Responsible for developing and maintaining a robust and stable baseline
using Primavera P6 & MS Project planning tool to enable detailed
planning, programme management and tracking progress using Earned Value
Analysis.
. Developed levels 1-4 schedules for program portfolios covering asset
retrofit, production and greenfield capital projects including substation
civil works, oil containment & flood protection, high voltage, Lv, EHv
transformer replacement, overhead lines, switchgear, circuit breakers,
substation telecommunication automation, HVAC, SCADA Control & Automation
schemes.
. Prepared Material Requisition (MR) schedule for purchasing Long Lead
Items.
. Responsible for creating, maintaining and updating project schedules in
accordance with project requirements and WBS/CBS/OBS coding structures.
. Prepared schedule, performance indicators & dashboard reports for senior
program managers, project managers & relevant stakeholders in accordance
with the project reporting calendar.
. Analyzed, evaluate and forecast current status against an established
baseline schedule using Earned Value Management Systems (EVMS).
. Ensured schedules incorporate appropriate milestones, deliverables and
activities aligned to the project scope, and that critical path(s) are
clearly identified.
. Ensured interfacing (internal/external) projects' relevant milestones and
activities are incorporated into the project schedule.
. Undertake schedule risk analyses, report outputs and make recommendations
to managers and directors.
. Support the UK Power Network's Zero Harm Policy for Health, Safety and
the Environment, by familiarizing myself with, and completing all work in
accordance with health, safety and environmental legislation, policies
and procedures.
. Support the organization in reducing the project's carbon footprint and
to achieve sustainability objectives.
. Validate construction methodologies, resource and cost loading, activity
durations, schedule logic, float allocation and critical path
identification within subcontractors' submissions in support of UK Power
Networks contract programme approval obligations.
. Provide accurate and timely Programme data to meet UK Power Networks
reporting requirements supporting Earned Value Management.
. Support project managers & quantity surveyors in the preparation of
Invitations to tender (ITT) packages in line with NEC contracts.
. Work with Risk Managers and programme teams to identify and incorporate
risk mitigating actions into the planned work scope and to incorporate
appropriate time/cost contingency levels across the baseline schedules.
. Carry out rigid cost control, commercial management and strategic
sourcing practices that deliver 'value for money' under the Ofgem 'Unit
Costs Indicators (UCIs)'.
. Achieve compliance with UK Power Networks project delivery and
programme/programme governance procedures.
. Accurately identifying, controlling and forecasting the time scales and
resource requirements of projects to minimise the likelihood of time
overruns.
. Co-ordinate the smooth and efficient flow of information between all
parties
. Oversee the programmes, monitoring and reporting on project performance,
highlighting deviations, providing early warnings, identifying and
presenting project slippage recovery strategies.
. Develop and manage a database to capture and identify work rate norms and
trends, earned value and performance indicators.
. Proactively carry out several monthly reporting covering milestone data
reporting, dashboard reporting, Load Indices/Health indices etc, ensuring
that reports meet deadlines cutoff points.
. Work with, manage and provide support for colleagues and other members of
the portfolio management team.
. Coordinate and lead project progress review & updating meetings with
project managers and senior project managers.
Project planner Nov 2011 till
May 2012
Mears Group - UK, Social Housing Facilities & Asset Management Contract
(Budget -$20M/Yr)
. Prepare and develop Master Plans and Schedules for Cyclical Maintenance
and Repair Works, help develop and communicate maintenance strategies and
changes that effect business objectives.
. Provide advice on the schedule impact of proposed change and integrate
approved changes into baseline updates.
. Maintain an overview of the contract progress and financial cash flow
in accordance with the contract budget by tracking Cost & Schedule
Performance Indices (CPI & SPI) against baseline plans.
. Proficient use of MS Projects 2007 & P6 along with client's and
material databases to schedule and manage workloads for tradesmen,
subcontractors and 30 project teams across London, UK.
. Produce full project plans reflecting agreed work breakdown
structures, critical paths, resource loading, constraints, cost and
earned value analysis, and integration of subcontractors' sub-project
plans into over project plan.
. Liaise with customers (tenants), subcontractors, specialist teams
(gas, asbestos, pest control, drainage, roofers etc) site
supervisors, operations managers, police, client's project managers
and other relevant stakeholders; balancing planned ready work and
operational constraints.
. Carried our resource & material allocation, track Critical paths,
ensure resources are not overloaded, allocate project & resource
calendars, defined resource shift patterns allocate resource curves,
tracked and analyze budgets against baseline plans and assign Work
Products & Documents.
. Tracked project progress on various deliverables, milestones and
activities.
. Support ad-hoc initiatives at direction of senior management to
analyze data, generate reports and communications, ensuring that
projects are planned within allocated time and executed within the
agreed Key Performance Indices slots.
. Identified project risks and opportunities for each project.
Project Planner May
2011 - Oct 2011
Morrison Facilities Services - Facilities & Asset Management Contract
(budget - $30M / Yr), London, UK
. Developed construction schedules based on construction team plans,
resource load schedules, analyze float paths, carried out cost and
earned value analysis and assess schedule status
. Created, maintained Project Schedules with over 2200 activity line
items reflecting Work Breakdown Structures (WBS) with costs and
resources effectively loaded.
. Effectively managed infrastructure projects of various sizes with good
understanding of earned value management.
. Lead in the development and maintenance of Periodic (daily, weekly,
monthly) status reports to keep management, client and other relevant
on project progress. Reports includes: labor productivity, schedule
performance indices (SPI), financial analysis, Costs Performance
Reports and earned value analysis.
. Carried out Progress Monitoring, Concept Study Programs, Pre-Feasibility
and Feasibility Level Programs.
. Integrate subcontractors/suppliers mini plans into the overall project
plan.
. Ensure that all statutory and industry health and safety policies,
regulations and procedures are complied with; contributing to the
development of safe working methods and safer environment to work in for
all operatives.
. Plan works in accordance with any Risk Assessments, Method Statement, and
other regulations.
. Ensure that relevant task specific risk assessments are made available
for tasks such as Working at Height, Electrical, Gas, Asbestos, scaffolds
and Manual Handling.
. Organise weekly meetings with teams (site managers, surveyors & resident
liaison officers) highlighting KPIs (Start & completion dates of works,
variations on site, delays).
. Organise and manage project handover/site inspections with Client Project
Managers.
. Assessing impacts by using project plans to review claims for Time
Extension & additional cost for variations.
Earlier Career Summary
Project planner Aug 2010 - May 2011
Ringway Jacobs Limited, London -Highway &Civil Infrastructure Management
Contract- $20M
. Use P6 & MS Project 2007 to plan, schedule and allocate heavy civil and
highway construction projects covering road construction, asphalt &
bitumen patching works, footway construction works, lighting schemes,
pedestrian guard rails installation, drainage & tunnels construction and
repair works.
. Prepare project schedules highlighting the resource & roles allocation,
critical path(s), track actual plans against baseline plans and
milestone(s) associated with each project.
. Develop and maintain close working relationships with relevant
stakeholders such as Local Authorities(Boroughs), Transport for London
Buses and members of the client's operational staff such as street works
coordinators, inspectors etc.
. Convert Subcontractors' tender plans from MS Excel, MS Project 2007 into
P6 and vice versa.
. Ensure that all works are carried out legally and in accordance with
Traffic Management Acts (TMA, 2004), New Road and Street Works Acts and
TFL requirements for working within the public highway and footways,
thereby minimising hazards to the general public and fines in terms of
Section 74 overruns and Fix Penalty Notices.
. Liaise with operation managers, works supervisors, gangs, members of the
network control room and other external specialist sub-contractors e.g.
EDF energy, Morrison utilities etc. to ensure that resources are
coordinated and managed effectively to avoid or reduce impact on traffic.
. Provided technical support in terms of interpreting designs, coordinating
and supervision of maintenance and improvement schemes on London central
road networks.
Project Scheduler
March 2010 - Aug 2010
Balfour Beatty Utility Solutions, Lincoln, UK - (Water & Gas Assets
Management Contract - Budget $50M)
. Carried out Project Control & Planning duties including planning,
scheduling and monitoring workloads for 20 project teams across East
Anglia, UK.
. Develop and manage Asset Management Plans (AMP), using P6 and MS Projects
2007 including the scheduling of work within agreed priorities, resource
availability and targets.
. Prepare project plans and resolve complex model serviceability &
regulatory issues, ensuring that project plans are in compliance with
OFWAT's regulatory framework & business model.
. Identify and prioritize asset needs using advance asset planning
tools, including scenario planning, modeling and interpretation of
results versus specific output and serviceability performance targets.
. Ensure all risk and construction methodology assessments in line with
Health and Safety regulations are carried out prior to allocating jobs
to project teams.
. Carried out Resource Planning & Scheduling using P3, SAP, Oracle Auto and
Smart Scheduler.
Project Planner
June 2009 - Feb 2010
Manorcrest Homes Ltd, UK - Design & Build Residential & Commercial Projects
- Budget $30M
. Using Primavera 6.2 and MS Project, I was responsible for developing,
cost loaded and resource loaded schedules and plans on design and
build social and residential projects across Lincolnshire, UK.
. Reviewed projects preliminary plans and estimates; prepared and
maintained project master plan.
. Monitored planning performance against appropriate performance
indicators/baseline.
. Performed feasibility, planning conditions, project appraisal and
environmental impact assessment studies.
. Prepared technical reports including method statements, risk
assessments studies and Construction Phase plans for the design and
installation of ENSO sewerage treatment plant, rainwater harvesting
and greywater recycling systems on a multi-million pounds caravan site
at Woodhall spa, Lincolnshire
Project Planning Engineer
May 2004 - Aug 2008
Reyog Construction International Nigeria - Projects worked on (Net worth
over $50M
. Carried out Project Control & Planning duties including project managing
and supervisory roles on multi-complex & dynamic projects covering
Building, Civil, and Highways Construction, Utilities, Facilities and
Asset Management contracts net work over 100M.
. Carried out reinforced concrete design and structural calculations of
beams & columns stress analysis; foundation design, roof design.
. Set-up agreed work breakdown structure using MS Project 2003 & 2007, P3e
for complete project life cycle from project initiation stages to close-
out (commissioning) stages.
. Proactive visits to sites to objectively substantiate progress of works
ensuring that issues with schedules are resolved, all deviation or delays
from baseline plans are integrated into the overall project plans.
. Tracked Project performance (Cost & Schedule indices) by comparing actual
work carried out against planned works baseline.
Other Personal details
> Member - Project Management Institute (PMI) {PMP Certification -
Ongoing}
> US Social Security Number
> US Green Card (Permanent Residence Permit)
> Excellent References available on request