Rajesh Kumar
[pic]
************@*****.***
Summary
Currently working as Project Engineer in transmission
department. I worked on 1G, 2G and continued with 3G technologies. I have
total 10 months of experience in Telecom technology. I have completed
worked on main parts of telecommunication. e.gNetworkSwitching technology,Transmission media,Wireless etc.
Professional Experience
7 months work experience as a Project Engineer with GRS Telecom Pvt. Ltd
from 4th Feb 2013 to till date.
> 45 days with B.S.NL an Academic Trainee in 7 July to 18 August 2011.
> 45 days with Neo Tech, Hisar an Academic Trainee in 10 July to 25 August
2012 .
Interests
GSM System:-Mobile station, Base station subsystem, Network subsystem
CDMA System:-Wireless code division multiple access
3G:-Frequency range,Frequency band& Bandwidth
WLL:- Antenna & Frequency range
SWITCHES:-Time & Space Switching.
Technical Competencies
Embedded System:-Embedded system is a special purpose system .It's
performs predefined tasks usually with very specific tasks engineers can
optimize reducing the size cost of the product.
Microprocessors:-Microprocessor is a general purpose CPU system. It's
the heart of computer.
Adaptable with Windows 7, Windows Vista, Windows XP
EDUCATIONAL QUALIFICATION :
Name Board / Year
Of University Institution of passing Percentage
Course
72%
B.TECH(ECE) KUK PPIMT College 2013
University Of Engg. &
Tech. Hissar
Diploma(ECE) H.S.B.T.E S.N.I.E.T 2010 70%
Panchkula Hissar
Haryana
A.S.D
XII Standard H.B.S.E Vidya 2007 62%
Bhiwani Mandir School
Narnaul
Project Undertaken
> In the Present I work in GRS TELECOM PVT.LTD from Lucknow. I have
worked the BTS installations in 1G and 2G system .This company is
the part of the Ereccison pvt. ltd.Its sharing the Nokia network.
I am presently working in BTS installation in 3G system.
> Speed Checker for Highway:-The speed checker will come handy for the
highway traffic police when the fast moving vehicle exceeds the speed
beyond the specified limit, an alarm is sounded and traffic control
unit will be informed about the vehicle.
Major tasks & Achievement:
1. Design the circuit diagram on PCB plates.
2. Implemented the components.
3. Testing the project & running.
> IR ATM System:-The IR ATM System are operated on the infrared wave
.This type devices open & closed with the help of IR strips card.
Major tasks & Achievement:
1. Design the circuit diagram on PCB plates.
2. Implemented the components.
3. Testing the project & running
> Clamp Switch:-This type of device is based on the microphone and
operated the device with help of clamping sound.
> Title: Visualization of Network Graph
Company: GRS Telecom Pvt. Ltd.
This project is basically designed for communication purpose; In this
project we are showing network graph or Link graph and Semantic Graph
between person, entity, locations etc. Basic aim is to track the
interconnection between different person, entities, how they are connected
to each other.. It supports 3rd party partner Server access through trusted
URL mechanism. Details of request and response messages to be exchanged
between user and Partner Server. User has accessed 3rd party server
directly and wants to subscribe / unsubscribe / manage account services
provided by 3rd party server. Server will authenticate user and allow him
to perform the desired operation.
Responsibilities:
* User requirement for transfer data.
* Participate in designing and coding of the module.
* Integration & testing of different APIs modules.
* Reviewing the code & update.
Hobbies
Working out at gym, playing cricket, surfing Internet, reading newspapers,
exploring new places and things.
Strength
Optimistic, Team player, Leadership Qualities, Good sense of Humor.
Personal Profile
DOB :
04th Aug. 1989
Sex :
Male
Father's Name : Naresh
Kumar
Languages known :
Hindi,English
Nationality :
Indian
DECLARATION :
I hereby declare that the above given information is true to my
knowledge and I bear the responsibility for the correction of the above
mentioned particulars.
PLACE
Signature
(Rajesh Kumar)