Post Job Free
Sign in

Manager Project

Location:
Charlotte, NC
Posted:
October 11, 2013

Contact this candidate

Resume:

Alfredo Archilla

**** ***** ****** ***. *********, NC 28216

704-***-****

Summary of Qualifications

Manufacturing Engineering and Quality Manager with over 25 years of

experience in the consumer electronics and medical device manufacturing

industries, skilled in the following disciplines: New Product and Process

Design & Development, Engineering Organization Training and Development,

Strategic Business Planning, Capital Appropriations, New Products

Introduction, Internal/External Root Cause Analysis and Corrective Action

on customer escapes/manufacturing errors, PFMEA Error Prevention, Factory

Productivity Improvement Projects, Lean Manufacturing, Kay Zen, 5S, VSM,

Standard Work, Process Certification Programs (6 Sigma), ISO-9000, 9001,

9002, TS16949, Design Control Validation Specialist. Microsoft Windows,

Explorer, Outlook, Lotus Notes, Excel, Power Point, Word, Access,

IntelliCad, Microsoft Project, Mini-Tab, Visio. Fully bilingual in English

and Spanish.

Professional Experience

Industry Consultant

1/10- Present

. Served as manufacturing and business consultant for several small

entrepreneur companies in Puerto Rico.

Boston Scientific, Miami, Florida

6/08- 10/09

Engineering Manager

. Staffed the engineering organization with five new Manufacturing

Engineering resources.

. Implemented Scrap Reduction Program (YIM) to reduce Scrap costs by

1.5M on 2009.

. Developed/Implemented Material Reduction Program to reduce material

costs by $1.2M on 2009.

. Developed/Implemented a Capital Appropriation Plan to invest $1M on

new equipment.

. Implemented all 2ndary ATMVs validation plan for attribute

inspections.

. Redesigned and build two new Super Stiff Pull testers,

Primer/Ethane Dippers, and Spark Testers.

. Implemented the Legacy Software Remediation Plan for old/obsolete

equipment.

Hamilton Sundstrand, Santa Isabel, Puerto Rico

10/05-5/07

Engineering Manager

. Introduced 588 new PWA product assemblies during 2006.

. Planned, prepared and executed $1.7M of capital equipment

appropriations to balance factory capacity with required demand.

. Invested $70K in the training and development of the Engineering

Department technical resources.

. Implemented factory productivity improvement projects to reduce

operational costs by $300K.

. Reduced product variance by $140K, from 60% to 20% of Earned Hours.

. Drove internal/external customer's defects/escapes by 50% through

the use of RCCA error prevention tools in the manufacturing and

test processes.

. Reduced Non Conforming Material (MRB) Bone pile by 30% driving

manufacturing errors CAPA.

. Implemented Six Sigma Process Certification program for the PWA

Automatic Coating process with 4.98 Cpk.

. Reduced the Out of Production Spare Parts customer quotes

delinquency by 50%.

OSRAM Sylvania, Gurabo, Puerto Rico

9/03-10/05

Engineering/ Quality Manager

. Implemented/Certified the Gurabo manufacturing facility on ISO/TS

16949:2002 Quality System.

. Re-certified the manufacturing facility on the ISO14000

environmental standard.

. Transferred and validated the new SIBOS automated manufacturing

line for the XM antenna cable products. ($750K). Replaced

traditional tape wrapping method for insert assemblies.

. Reduced the Quality Department overhead by 20%.

. Improved the cables manufacturing yield from 85% to 99% through the

use of PFMEA, and DOE preventive error proofing tools.

. Managed all new product introductions and engineering changes in

compliance with the Automotive Industry customer's requirements.

(PPAPS).

Ocular Sciences, Juana D az, Puerto Rico

2/02-8/03

Process Development Manager

. Created the OSIPR Process Development Department ($360K/year budget),

to carry out the process technology capital transfer plan ($4.7M), to

meet 2002 business objectives.

. Managed the design control and validation activities for all Capital

Equipment transferred (PFMEA, IQ, OQ, CIOQ, & PQ).

. Introduced three high volume Regal Sealers to seal contact lenses on

single blister packs. Designed and implemented empty pockets, and

double foils functionalities to meet new customer's requirements.

Performed DOE analysis to set up Key Input Variables optimal

parameters.

. Introduced two high volume CAM Machines to pack single blister packs

on 3 and 6 boxes containers.

. Introduced the Full OSCA Dry Line SCADA manufacturing technology to

produce a cost-effective dry contact lens (less than $.07). Trained

all production operators on system GUI functionality, and all

technical resources on maintenance and repair.

. Introduced an Automatic Inspection System for dry contact lens, to

reduce human error due to fatigue, and reduce cost of quality.

Biometrics Imagineering, Hato Rey, Puerto Rico

2/01-2/02

Manufacturing & Quality VP

. Created and implemented the company's Core Technology, and Products

Technology Strategic Development Roadmaps.

. Redesigned two main core products (ITM & Cyclops) as per new

customer's requirements.

. Established sub-contracted manufacturing capabilities in PR, and Zuhai

China.

. Implemented BOM, MCOP, and ECO systems for the development Laboratory.

PR Housing Development Department, Hato Rey, Puerto Rico

1/01-2/01

Project Manager

. Created the New Secure Home Program Office in the Housing Development

Department to manage a $207M FEMA Grant.

Economic Development Commerce Department, Hato Rey, Puerto Rico

6/97-12/00

Deputy Secretary

. Developed the Strategic Plan for the implementation of the PR Public

Policy on Science and Technology. (ADL Consultants, Boston)

. Created the PR. Government EDCD Science and Technology Office.

. Granted aprox. $6M in seed funds to emerging companies and/or

technologies.

. Supported the Government of Puerto Rico in other interagency, mission

critical initiatives.

Motorola Electr nica de Puerto Rico, Vega Baja, Puerto Rico

6/92-6/97

Engineering Director

. Directed all capital plan expansion projects required to increase the

beepers manufacturing capacity from approx. 250K units per month, to

1M beepers per month.

. Created the Internal Research and Development Center (11,000 sqft

building) for the Research, Development and Commercialization of

manufacturing process technologies.

. Implemented the Motorola SPC program in all critical manufacturing

processes.

. Directed the manufacturing engineering Six Sigma Program to reduce

process variability on all critical processes to 1.5 Cpk level. Used

PFMEA, DOE, Fish Bone, and Paretto analysis to drive error prevention.

. Appointed as an industry member of the Governor's science and

technology advisory council.

. Worked on the development of the Puerto Rico Public Policy on Science

and Technology, signed by the Governor of Puerto Rico, in

October/1996.

Education

University of Puerto Rico, RUM

BSEE - Electrical Engineer

License Number: 8635 CIAAPR

Professional Development / Trainings

. Motorola Optimization Program, 6 Sigma

. Statistical Process Controls

. DOE & Robust Tolerance Analysis

. Lean Manufacturing Training

. Theory of Constraints

. ISO/TS 16949:2002 Lead Auditor Course

. Design Control / Validation Professional

. Managing Technology and Innovation, The Wharton School

. Strategic Leadership Training for State Executives



Contact this candidate