Anjani Goparaju
**** *, ******* ***, ******, IL, 61606
Cell: 571-***-****; Email: ab8vhg@r.postjobfree.com
http://www.linkedin.com/pub/anjani-goparaju/30/aa9/303
OBJECTIVE
Seeking an Industrial or Manufacturing Engineer position in the areas of Lean Manufacturing, Six
Sigma and Quality Control
EDUCATION
Master of Science in Manufacturing Engineering - December 2011; Overall GPA – 3.75/4.0
Bradley University, Peoria, IL
Bachelor of Engineering in Mechanical Engineering - May 2009; Overall GPA- 3.14/4.0
Andhra University, India
WORK EXPERIENCE
Manufacturing Engineer, Caterpillar, Peoria, IL (Through Geometric Americas) Feb 2012- Present
Value stream mapping
- Collect data required to create value stream maps such as cycle times, operation demands, OEE, inventory etc
- Create and update current state value stream maps to identify critical paths and bottlenecks in the process
- Drive cost reduction projects and strategic buffer capacity plans to address bottlenecks
- Create and update future state value stream map to support future capacity plans and an ideal state for pull replenishment
Participate in setup reduction projects
- Record base line setups and conduct time studies
- Identify external and internal elements in a setup. Use 5 why analysis to validate the necessity of the various elements
- Propose, implement and validate conversion of internal steps to external to reduce internal setup time using DMAIC principles
Develop Process documentation
- Develop Standard Work for operating and setting up machines to improve PQVC
- Conduct Safety FMEA inspections to identify high risk work elements
- Propose and implement solutions to mitigate identified risks and create Safe Job Procedures
- Develop Quality Control Plans, Spaghetti Charts and Flow Process Charts
- Optimize the sequence of operations and man machine ratios using Man Machine Charts
- Calculate and record Overall Equipment Effectiveness
Lead 5S activities and audit 5S performance
Identify, implement and track Root Cause Corrective Actions (RCCAs) to eliminate underlying causes of PQVC losses
Participate in various Continuous Improvement and Rapid Improvement Workshops to reduce CPS wastes
Engineering Intern, Matcor- Metal Fabrications, Peoria, IL Jan 2012- Feb 2012
Created and maintained Sheet Metal part drawings using Pro-Engineer
Geometric Tolerance and Dimensioning of different parts drawings
Prepared and maintained Bill of Materials and Routings of different parts
Conducted cost analysis and identified impact of tooling availability on part cost
Summer Intern, Cabot Microelectronics, Aurora, IL May 2011- Aug 2011
Initiated and completed a ‘Metrology Product Change Notification’ (PCN) package for customers’ management of change
requirements
- Conducted various Gauge Repeatability and Reproducibility (GR&R), correlation and parallel testing studies for existing and new
metrology.
- Collected and analyzed data using the statistical tools in Minitab
- Presented the PCN to the International Change Review Board and obtained approval
Designed and tested a mechanism which flattens product samples to eliminate variability, time and effort in measurement
Maintained the existing databases for the Quality Management Systems (QMS)
Anjani Goparaju
1718 W, Bradley Ave, Peoria, IL, 61606
Cell: 571-***-****; Email: ab8vhg@r.postjobfree.com
http://www.linkedin.com/pub/anjani-goparaju/30/aa9/303
Developed and documented quality related Temporary Operating Procedures (TOPs) and work instructions
Graduate Research Assistant, Bradley University, Peoria, IL Aug 2010 - May 2011
Provided Research support to Dr. Ye Li on C-Space based Tool Path Planning for 3-Axis Flat End Milling
PROJECTS AND INDUSTRIAL TRAINING
Advanced Technology Service, Peoria, I L,
Quickly integrated into a five man Engineering team for a lean project and accomplished a 3 day decrease in turnaround time at the
facility.
- Developed Spaghetti Charts, Process Charts and Current Value Stream Maps. Identified Mudas and Non Value Added steps
- Conducted Root Cause aAnalysis and 5 Whys and proposed Kaizen events to reduce Cycle Time of stations
- Implemented Kanban visual aid technique and Poke Yoke to improve processes by elimination of Non Value Added work
- Conducted cost justification analysis for implementation
Whiting Corporation, Monee, IL
Created an animation movie using Pro E demonstrating the working of an over head crane
RELEVANT COURSEWORK
Lean Manufacturing, Total Quality Systems, Production Planning, Engineering Statistical Analysis, Design of Experiment, Supply
Chain & Logistics, Computer Aided Machining, Activity Scheduling and Computer Aided Machining
TECHNICAL SKILLS
Pro-Engineer, AutoCAD, Evsm, VPPA, VPPM, CAPP+, Engineering Prints & BOM, POM-QM, Win-QSB, Lindo, Lingo, Minitab,
Statistical analysis using MS Excel, MS Office, MS PowerPoint, MS Access, C language