Felipe Cisneros
Portage, MI 49002
Phone: 269-***-****
Email: ab8v1x@r.postjobfree.com
Objective: To secure a permanent position as an operational leader in Lean Manufacturing
Highlights of Qualifications
EXPERTISE - Completed Toyota's two-year program at OMDD (Operations and Management
Development Division) learning and implementing Toyota Production System (TPS) in plant
continuous improvement activities, supplier support and development, and product
launches. Business management skill development included; project management, Hoshin planning,
succession planning, team development and cultural transformation. OMDD is Toyota's place to
train managers at the highest level under the mentorship of Toyota's TPS masters. This two-year
submersion into the TPS culture prepares its students to return to their group and "level up" the
thinking of those around them for the betterment of their company and product.
PROCESS DEVELOPMENT AND CONTINUOUS IMPROVEMENT - Identifies and
collects current measures identifying gaps in achieving targets, production lead time versus order
lead times, inventories, and supply chain performance; facilitates lean manufacturing studies,
discussions and training; coordinates and leads lean manufacturing process implementations
BILINGUAL - Fluent in both English and Spanish
COMMITMENT- Exhibits integrity and attention to detail in every facet of professionalism
SOFTWARE – Extensive familiarity with AS/400 and have also worked with SAP and Oracle
Professional History
February 2012 – Present Aleris International: Coldwater, MI – Lean Manager
Train coach & facilitate AOS “Lean concepts and principles” Such as: A3 thinking
Coach support process teams to collaborate on improvement
Work with department managers to effectively measure and document impact of process
improvements
Provide AOS training on AOS concepts and principles: Practical Problem Solving and visual
management
Actively identify barriers to AOS success and develop strategies to overcome and gain
alignment
Provide manufacturing strategy resulting in 1.7 furnace turns (2 is considered world class)
Lead Strategic Planning for calendar year 2012
Implementation of information center meetings on the production floor
Led through put project that resulted in 90k savings in March 2012
April 2011 – January 2012 MicroMachine Co.: Kalamazoo, MI – Internal Manufacturing
Consultant/ Lean Engineer
Identified manufacturing priorities through establishing safety, quality and productivity goals
Implemented four continuous production cells of CNC equipment
Felipe Cisneros
10205 South Westnedge Ave
Portage, MI 49002
Phone: 269-***-****
Email: ab8v1x@r.postjobfree.com
Developed capacity planning strategies for three production departments
Implemented visual scheduling and trained manufacturing leads
Utilized lean manufacturing expertise to capture current conditions and improved cost
quoting accuracy
Implemented process for tracking equipment effectiveness to drive improvement in
production
Set and measured 5s standards in all departments
Lead company-wide lean education from the production floor to upper management
June 2010- March 2011 Gestamp Mason: Mason, MI - Operational Manager - Responsible for:
• Directly leads six Manufacturing Supervisors, one Scheduler and one Continuous
Improvement Engineer
• Manages day-to-day production scheduling to meet customer demand
• Responsible for Operations policy deployment
• Sets head count calculation for assembly department
• Leads initiatives to reduce labor processes
• Successfully reduced die change time from 71 mins to 51 mins in Q1 2011
• Implemented 5’s in laser manufacturing area
• Aligned departmental resources to meet Operations needs thus reducing OT by 20%
January 2010 - June 2010 Gestamp Mason: Mason, MI - Continuous Improvement Engineer -
Responsible for:
• Lead Gestamp Production System implementation-plant wide
• Coordinate process reduction activities leading to 4 reductions-$28,000 per reduction
• Teach Lean principals to all current team members
• Time study dedicated equipment lines-CD3, RT, 353 bumper and pillar assembly
• Set up Standard work procedure for die change-provide training to new team members
reduction of die change time from 40-28 minutes
• Lead Single Minute Exchange of Die workshop-reduce die change time from 45-23 minutes
2008-January 2010 Summit Polymers: Portage, MI - Corporate SLMS Engineer - Responsible for:
• Establishing Corp SLMS (Summit Lean Manufacturing System) Policy
• Corporate education at the ownership level, analyzing and standardizing the company's
Operational Availability (OA) measurable
• Coaching, teaching, and Implementing SLMS principals
• Leader in implementation of Minomi at all Summit manufacturing facilities
• Leader in organizing, facilitating, and set-up of transfer business
• Leading Corporate Kaizens in all Summit Locations including: Portage, Vicksburg, and
Sturgis, MI; Elizabethtown and Mt. Sterling, KY; Shelbyville, TN; Matamoros, Mexico
Felipe Cisneros
10205 South Westnedge Ave
Portage, MI 49002
Phone: 269-***-****
Email: ab8v1x@r.postjobfree.com
2006-2008 Toyota: Erlanger, KY –OMDD (Operations and Management Development Division)
Contractor basis through Summit Polymers - Responsible for:
• Learn "by doing" TPS (Toyota Production System)
• Led and participate in North American Paint Jishukens (CI activity) focusing on quality
improvement
• Supported Toyota Suppliers by participating in Continuous improvement activities,
Including A-type pull system implementation, general purpose equipment Operational
Availability improvement and assembly process reduction activities through Standardized
Work
• Participated and led Toyota paint shop quality investigations that resulted in best practice
implementation and standard process sharing throughout Toyota paint shops
• Traveled to Toyota Motor Manufacturing facilities in North America including United States
and Canada throughout the duration of the contract
Oct 2005 - Feb 2006 Summit Polymers: Sturgis, MI - Off Shift Superintendent - Responsible for:
• Coordinated all production, maintenance, quality activities during second and third shifts
• Authorized emergency purchase orders to support all plant activities
• Sustained lean practices and culture during second and third shift production
• Lead kaizen activity resulting in reduction of die change time (color change vs. tool change)
• Develop strategy for process reduction in molding (shared labor, multiple machines)
• Develop shared labor strategy in assembly (program grouping 21Z specific)
2004-2005 Summit Polymers: Sturgis, MI- Manufacturing Dept Molding Manager - Responsible
for:
• Operations of 15 molding machines ranging from 10-1,000 tons on 3 shifts
• Three direct report supervisors
• Coordinated and Achieved daily customer requirements-internal and external
• Measured, quantified and reduced or eliminated OA gaps
• Metrics included Operational Availability, die change time and preventative maintenance
completion
• Implemented lean procedures to increase operational time by reducing tool change over time
• Worked closely with Engineering to achieve cycle time reduction goals and process
reduction
• Partnered with Maintenance Dept. to set up achievable preventive maintenance schedules to
reduce cost
2003-2004 Summit Polymers: Sturgis, MI- Materials Manager- Responsible for:
• Overall purchasing, receiving, and shipping of raw material and finished goods
• Purchasing and Customer Service departments-seven direct reports
• Implemented Kanban re-ordering process for raw material
• Developed visual safety stock replenishment system.
• Reduced Inventory turns from 26 days to 16 days during D258/D219 (Ford Taurus
Freestyle) product launch
• Coordinated shipments for 23 customers
Felipe Cisneros
10205 South Westnedge Ave
Portage, MI 49002
Phone: 269-***-****
Email: ab8v1x@r.postjobfree.com
2000-2003-Summit Polymers: Kalamazoo, MI- Valley Plant- Kanban Supervisor- Responsible for:
• Purchasing and coordinating raw material deliveries to the plant
• Successfully eliminated use of two outside warehouses
• Partnered with union work force to achieve daily goals
• Three (up to seven) direct reports
• Implemented Kanban system of reordering raw material and production components.
• In 2002 absorbed shipping supervisory duties at plant in addition to Kanban responsibilities
Education and Specialized Training
1994-1996 Kalamazoo Valley Community College - Associates Degree in Accounting
2006-2008 Toyota OMDD (Operations and Management Development Division)- “Learn by
Doing" TPS (Toyota Production System): Two years intensive "hands on" specialized training
learning, implementing and leading Toyota Production System throughout North America
References
Scott Porter- Manager- TSSC - 859-***-****
Bobby Graves- Manager -Toyota Motor Manufacturing OMDD - 859-***-****
Brent Yager- Regional Director of Manufacturing - Summit Polymers - 517-***-****
Brad Glessner - Industrial Engineer - American Axel - 269-***-****