Patrick Tong
Atlanta, GA 30350
Mobile: 678-***-****
e-mail: ********@*****.***
Status: US Greencard holder
Profile
Experienced in managing engineers, hiring & building a team in various countries. Able to adapt
to various working conditions & cultural differences in various countries globally
Have working experience as a Design & Release Engineer (DRE) from studio phase to the launch of the
product and have used various Ford systems such as WERS, AIMS, GPIRS
Experienced in Body-in-White design with strong emphasis on the Closures structural stability. Possess
knowledge in GD&T, Master Sections, DOE, DFMEA, DVP&R & Benchmarking competitive vehicles
Strong manufacturing experience in both stamping & assembly to enhance my Product Development back
ground with hands on experience working at Cosma International, a leading supplier in body stamping &
assembly
Have working experience in an Automotive Assembly & Stamping Plant and successfully launched
vehicles for Ford & Cosma
Work Experience
Cosma Structural Systems
Engineering Manager
San Luis Potosi, Mexico (03/2011-present)
Engineer manager responsible for (4) Program Managers and a total of (21) engineers as direct
subordinate. Launch of a Greenfield facility for Cosma International in Mexico with SOP in August 2012
Interact with the General Motors (GM) in Detroit, in particular the GM Product Engineering team to support in
the design of the new model GM (K2XX) Pick-up trucks for the Door Structures. Worked with GM engineering
& studio with the manufacturing feasibility, packaging & CAE analysis of the door structures.
Main plant customer launches includes the Nissan Sentra (L12F) launch in Aguas Calientes,MX, General
Motors in San Luis Potosi for the Global Gamma platform and Silao for the (K2XX) pick-up truck. Plant has
over $USD140million in booked customer business
Support in the quotation of new business, supporting in the quotation for new business with Mazda, VW and
GM including new Hot Stamping projects
Cosma Structural Systems
Operations Manager-Program Manager
Bangkok, Thailand (07/2008-03/2011)
Program manager for the Honda 2NX Bumper project, Ford Ranger T6 Bumper project and Ford
Focus (C346) Thailand project
For the Ford Ranger T6 bumper, responsibility includes product development of the roll forming bumper with
the lead design team from Ford in Australia. This includes meeting Ford engineering target for weight reduction
and crash performance
Our main customers includes Guangzhou Honda Automotive (China), Auto Alliance of Thailand & Ford of
Thailand
Hire new engineers and staff for the new plant
Create management team in the plant for day to day operations
Part of the new business team lead reporting to the Director of New Business, responsible for
quoting new business for the Thailand operations
Cosma Structural Systems
Engineering Manager
Shanghai, P.R China (04/2006-12/2006)
Short term assignment as Engineering Manager for the first Cosma facility in Shanghai. Upon completion of
assignment, I returned to Cosma in Mexico for the CD3XX program
Launched the Front Cradle & Twist Axle for the SGM980 platform. Cosma was full service supplier for those
commodities. Responsible for component level durability testing, CAD release into SGM system
Timely engineering sign off for product upon completion & passing of product testing
Interact with GM Product Development engineers in both Detroit and final sign off from SGM engineering
Established engineering department procedures such as change control, BOM & CAD management strategy
Hire team for engineering department & mentor new engineers in Product development
Cosma Structural Systems (Sonora Forming SA de CV)
Ford Fusion -CD338 Product Engineering
Hermosillo, Mexico (02/2003-07/2008)
Cosma was awarded with over 80% of the underbody and upper body content on the Ford Fusion platform.
Part of the Cosma engineering team with direct daily interaction with Ford Product Development in Dearborn
Product engineer working as a supplier to Ford in support of the product development of the 2006 Ford Fusion
vehicle.
Responsible for developing the design, stamping & assembly feasibility of the Body Structures
parts
Participated in the locator strategy for the CD338 Body Structures including developing net
surfaces, principle locating points (PLP) & GD&T with Ford Vehicle Operations
Assist in the transfer of a Mazda carry over platform to the CD338 platform such as
DC welding and Mazda MES specifications
Lead Product Engineer for the Heat Shields and Fuel Strap as a full service supplier to Ford.
Responsible for designing & managing the Heat Shields and Fuel Straps CAD data & releasing the data to Ford Team
Center
Ford Motor Company
Lincoln LS Plant Vehicle Team Engineer
Wixom Assembly Plant, MI (04/1999-06/2001)
Product engineering with main responsibility for the closures systems for the Lincoln Town Car, LS and
Continental at Wixom Assembly Plant
Participated in change control, plant variation reduction team & ensuring that all engineering changes to the
closure systems does not impact the product performance from crash, structural integrity such as closing
efforts, wind noise to NVH, Squeak & Rattle and Corrosion
Responsible for meeting part of Body Sheet- metal cost reduction targets as part of the MCR team
Responsible for selecting proto-type steel, coordinate special build vehicle & writing
engineering changes to build proto-type vehicles for testing
Responsible for awareness of FMVSS, European safety standards and Ford’s Corporate objective
& maintaining vehicle safety requirements while implementing cost reduction solutions
Ford Motor Company
Lincoln Aviator Product Engineering
Saint Louis Assembly Plant, MO (06/2001-02/2003)
Responsible for product development of the Lincoln Aviator Lift gate system including lift gate
sheet metal, dynamic sealing and glass assembly
Responsible from the studio phase (clay) to creating master sections, CAE analysis to determine the rigidity of
the lift gate structure & packaging studies to ensure best practice proper clearances is maintain
Create the DFMEA for the Lift gate system
Product engineer responsible for product sign off at every build event, ensuring that the proto-type vehicles are
build to the correct engineering level & contains the correct late engineering changes. Responsible to sign off
the vehicle prior to corrosion, durability & other vehicle level testing
Ensure that the product design & vehicle passes Engineering Sign Off (ESO) milestone on time by achieving
crash test (FMVSS) approval, no functional failure in durability and corrosion performance
Part of the GD&T team to formulate a locator strategy with suppliers that will meet Ford
standard and deliver a product that can be assembled to meet Ford fit & finish standards
Work with the Ford CAD team to ensure that engineering changes are captured into the Ford
CAD system
Establish strong understanding of the assembly plant process and designing part under the
constraint of assembly processes and ergonomics
Work with supplier to deliver a quality finish product & understand impact of late engineering
changes on program timing and supplier timing. Make visits to supplier plants to understand
various processes
Part of the launch team to launch the vehicle from TT phase to SOP in St. Louis Assembly Plant. Identify build
problems including quality issues. Working well in a launch team environment with Program Team (PMT), PVT
and Plant Body Shop
Work with Global Craftsmanship to ensure overall vehicle is up to Ford's Premier Automotive
Standards
MSX International (contract at Daimler Chrysler Corp)
Dodge Ram Closures Product Engineer
Detroit, MI (01/1998-04/1999)
Part of the 2002 Dodge Ram Body-in-White design team. Worked on the removal of door
reinforcements, laser welded blanks & overall door design to ensure structural stability of the
door & on cost saving engineering solutions
Introduced Laser Welded Hemming technology with the Manufacturing Engineering group to
Daimler Chrysler as a replacement for conventional door hemming process as a cost savings
opportunity. Responsible for setting up testing matrix to evaluate the doors
Coordinated tests for the door and hood on the current production Dodge Ram & competitive
vehicles. Utilized data to setup the new truck structural objectives. Correlated the test with
Finite Element Analysis
Evaluated score proposals from suppliers to check on the feasibility of the new parts.
Investigated supplier’s process capability. Check for part compliance with Federal Motor
Vehicle Safety Standards (FMVSS) & Corporate Standards
Established Design Verification Plan & Report for the closures team for the 2002 Dodge Ram
utilizing Reliability & Confidence concepts for test samples. Part of the DFMEA team for the
closures group
Education
Wichita State University, US-Kansas-Wichita
Bachelors of Science in Aerospace Engineering, December 1997
Computer Skills
EDS VisView, MS Office, SDRC Ideas, Unigraphics, CATIA V5, AutoCAD
Languages
English, Spanish (intermediate verbal), Mandarin (basic verbal), Malay Language