Post Job Free

Resume

Sign in

Power Plant Construction

Location:
Oak Hill, WV, 25901
Posted:
August 09, 2012

Contact this candidate

Resume:

Jeffery N. Briers

*** ********** *****

Oak Hill, WV 25901

Home #304-***-****

Cell #304-***-****

Construction Supervisor

Education:

High School Graduate

Vocational Auto Body Repair

Vocational Welding

Pipe Welding School (Daniel)

Summary Of Experience:

Twenty-eight years of new construction supervisory experience in various nuclear, coal

fired, hydroelectric power plants, prison, and fiber projects. Ten years of experience in

Coal Fired environmental addition projects including SCR’s, ESP & FGD’s. Additional

four years of experience at a machine shop, related to rebuilding and inspection of mining

equipment. I have had significant experience & training in welding, installations,

scheduling, quality control, estimating, and safety in industrial construction.

Employment History:

Fluor Power Services July 2009 to May 2012

Southern Company Plant Scherer Juliette, Ga.

Coordinator responsible for the execution of subcontracts. On two FGD units and four

SCR units. Overseeing subcontractors in the fabrication of two FRP absorber hoods

and recycle piping, insulation of equipment and piping, architectural siding,

scaffolding, touchup painting. Also oversaw many other small contracts that came

on and off the job site making sure the work was preformed safely and site rules

were adhered to.

Fluor Power Services July 2006 to June 2009

E-ON, E.W. Brown Plant, Harrodsburg, Ky.

Coordinator responsible for the execution of subcontracts. Provided inspections and

acceptance of subcontract work. 1 FGD unit, one absorber tower, warehouse, fire

water tank, fire protection system, all insulation, scaffolding and touchup painting.

Insuring all work was done per design and specifications in a safe and professional

matter.

Fluor Global Services Jan 2004 to July 2006

Progress Energy, NC Asheville Plant Unit 1 & 2

Coordinator responsible for the execution of subcontracts. Provided inspections and

acceptance of subcontract work. The Asheville project included 2 SCR’s, 2 FGD’s and a

new ESP. Coordinator responsible for a new 320’ Chimney with fiberglass duct; Two tile

chest absorber towers; Service tanks with flake glass liners; The new wetlands area; and

the insulation & scaffold of the project.

Fluor Global Services Jan 2003 to Dec 2003

LG&E, KY Ghent Plant Unit 3 & 4 & 1

Coordinator responsible for the execution of subcontracts. Provided inspections and

acceptance of insulation. Provided Q/C assistance with weld testing and inspections on

ductwork welding.

Fluor Global Services Jan 2002 to Dec 2002

CP&L Alliance Roxboro, NC Hyco Plant Unit 1 & Unit 3

Coordinator responsible for the execution of subcontracts. Provided inspections and

acceptance of insulation and scaffolding. Provided leadership over the laborers and fire

watch.

Fluor Global Services Nov. 2000 to June 2001

CP&L Alliance Roxboro, NC Hyco Plant

Boiler Maker Foreman responsible for the fabrication and assembly of SCR casing

panels, flues and ducts in excess of 1,120 tons on a 750-megawatt coal fired power plant.

Coordinate rigging and erection schemes with the superintendent. Provide leadership and

training roles related to flux core-welding techniques, in order to increase craft

productivity. Ensure a zero accident atmosphere is maintained.

Phillips Machine Service Feb. 1996 to Nov. 2000

Beckly, WV

Trouble shoot, repair, rebuild, inspect and test used mining equipment. Work included

welding, hydraulics, piping, gears, bearings and alignments. Performed service calls to

mines in emergency situations to repair non-functional equipment required for

production.

A.S. Johnson Mechanical 1994 to 1996

Beckley Federal Prison

Installed HVAC ducts and equipment and insulation of duct work.

Fluor Daniel 1992 to1994

E.I.Dupont Kinston, NC

Craft Superintendent

Grass roots Dacron expansion facility in excess of 200mm. Responsible for the sheet

metal craft. Major scope included Quench Air systems, air handling units, stacks, fans

and ducts. Worked in home office performing constructability prior to field mobilization.

Wrote work scopes for fabricators, reviewed specifications, developed on site delivery

schedules, performed shop inspections for fabrication and welding quality. Ensured field

installations met specifications and were erected in a timely manner. Responsible for

determining manpower, tool and construction equipment requirements. Maintained

accurate status and forecast of materials, schedule, and man-hours.

Fluor Daniel 1990 to 1991

Union Camp Phase II Eastover, SC

General Foreman

Managed four foremen in the Power and Recovery Boiler areas installing flues, breech,

and building ventilation systems. Liaison with engineering for interference’s and conflicts

in drawings.

Fluor Daniel 1987 to 1989

Comanche Peak Glenn Rose, TX

General Foreman

Retrofit work related to “as installed mechanical systems”. Scope of work included initial

inspections; determine extent of rework, and coordinating with engineering firms to

prepare construction work packages to bring components in compliance with nuclear

specifications. Supervised 3 crews in the reactor building.

Daniel Construction

Shearon Harris Nuclear Power Plant, New Hill, NC 1985 to 1987

Sheet Metal Craft Journeyman

Installed safety and non-safety related HVAC ducts and related equipment. Worked in

testing and turn over crew prior to commercial operation.

Daniel Construction 1981 to1985

Wolf Creek Nuclear Plant, New Strawn, KS

Structural Welder

Welded HVAC ducts and supports and was certified on stainless and carbon. Worked in

the startup crew doing leak testing and air balancing on the HVAC systems and

equipment.

Daniel Construction 1979 to 1980

Bath County Pump Storage Dam Warm Springs, Va.

Structural Welder

Welded in the fabrication shop repairing steel forms for concrete pours and making things

for field support. Helped set the bolts in the powerhouse for the turbines to set on.



Contact this candidate