Jeffery N. Briers
Oak Hill, WV 25901
Home #304-***-****
Cell #304-***-****
Construction Supervisor
Education:
High School Graduate
Vocational Auto Body Repair
Vocational Welding
Pipe Welding School (Daniel)
Summary Of Experience:
Twenty-eight years of new construction supervisory experience in various nuclear, coal
fired, hydroelectric power plants, prison, and fiber projects. Ten years of experience in
Coal Fired environmental addition projects including SCR’s, ESP & FGD’s. Additional
four years of experience at a machine shop, related to rebuilding and inspection of mining
equipment. I have had significant experience & training in welding, installations,
scheduling, quality control, estimating, and safety in industrial construction.
Employment History:
Fluor Power Services July 2009 to May 2012
Southern Company Plant Scherer Juliette, Ga.
Coordinator responsible for the execution of subcontracts. On two FGD units and four
SCR units. Overseeing subcontractors in the fabrication of two FRP absorber hoods
and recycle piping, insulation of equipment and piping, architectural siding,
scaffolding, touchup painting. Also oversaw many other small contracts that came
on and off the job site making sure the work was preformed safely and site rules
were adhered to.
Fluor Power Services July 2006 to June 2009
E-ON, E.W. Brown Plant, Harrodsburg, Ky.
Coordinator responsible for the execution of subcontracts. Provided inspections and
acceptance of subcontract work. 1 FGD unit, one absorber tower, warehouse, fire
water tank, fire protection system, all insulation, scaffolding and touchup painting.
Insuring all work was done per design and specifications in a safe and professional
matter.
Fluor Global Services Jan 2004 to July 2006
Progress Energy, NC Asheville Plant Unit 1 & 2
Coordinator responsible for the execution of subcontracts. Provided inspections and
acceptance of subcontract work. The Asheville project included 2 SCR’s, 2 FGD’s and a
new ESP. Coordinator responsible for a new 320’ Chimney with fiberglass duct; Two tile
chest absorber towers; Service tanks with flake glass liners; The new wetlands area; and
the insulation & scaffold of the project.
Fluor Global Services Jan 2003 to Dec 2003
LG&E, KY Ghent Plant Unit 3 & 4 & 1
Coordinator responsible for the execution of subcontracts. Provided inspections and
acceptance of insulation. Provided Q/C assistance with weld testing and inspections on
ductwork welding.
Fluor Global Services Jan 2002 to Dec 2002
CP&L Alliance Roxboro, NC Hyco Plant Unit 1 & Unit 3
Coordinator responsible for the execution of subcontracts. Provided inspections and
acceptance of insulation and scaffolding. Provided leadership over the laborers and fire
watch.
Fluor Global Services Nov. 2000 to June 2001
CP&L Alliance Roxboro, NC Hyco Plant
Boiler Maker Foreman responsible for the fabrication and assembly of SCR casing
panels, flues and ducts in excess of 1,120 tons on a 750-megawatt coal fired power plant.
Coordinate rigging and erection schemes with the superintendent. Provide leadership and
training roles related to flux core-welding techniques, in order to increase craft
productivity. Ensure a zero accident atmosphere is maintained.
Phillips Machine Service Feb. 1996 to Nov. 2000
Beckly, WV
Trouble shoot, repair, rebuild, inspect and test used mining equipment. Work included
welding, hydraulics, piping, gears, bearings and alignments. Performed service calls to
mines in emergency situations to repair non-functional equipment required for
production.
A.S. Johnson Mechanical 1994 to 1996
Beckley Federal Prison
Installed HVAC ducts and equipment and insulation of duct work.
Fluor Daniel 1992 to1994
E.I.Dupont Kinston, NC
Craft Superintendent
Grass roots Dacron expansion facility in excess of 200mm. Responsible for the sheet
metal craft. Major scope included Quench Air systems, air handling units, stacks, fans
and ducts. Worked in home office performing constructability prior to field mobilization.
Wrote work scopes for fabricators, reviewed specifications, developed on site delivery
schedules, performed shop inspections for fabrication and welding quality. Ensured field
installations met specifications and were erected in a timely manner. Responsible for
determining manpower, tool and construction equipment requirements. Maintained
accurate status and forecast of materials, schedule, and man-hours.
Fluor Daniel 1990 to 1991
Union Camp Phase II Eastover, SC
General Foreman
Managed four foremen in the Power and Recovery Boiler areas installing flues, breech,
and building ventilation systems. Liaison with engineering for interference’s and conflicts
in drawings.
Fluor Daniel 1987 to 1989
Comanche Peak Glenn Rose, TX
General Foreman
Retrofit work related to “as installed mechanical systems”. Scope of work included initial
inspections; determine extent of rework, and coordinating with engineering firms to
prepare construction work packages to bring components in compliance with nuclear
specifications. Supervised 3 crews in the reactor building.
Daniel Construction
Shearon Harris Nuclear Power Plant, New Hill, NC 1985 to 1987
Sheet Metal Craft Journeyman
Installed safety and non-safety related HVAC ducts and related equipment. Worked in
testing and turn over crew prior to commercial operation.
Daniel Construction 1981 to1985
Wolf Creek Nuclear Plant, New Strawn, KS
Structural Welder
Welded HVAC ducts and supports and was certified on stainless and carbon. Worked in
the startup crew doing leak testing and air balancing on the HVAC systems and
equipment.
Daniel Construction 1979 to 1980
Bath County Pump Storage Dam Warm Springs, Va.
Structural Welder
Welded in the fabrication shop repairing steel forms for concrete pours and making things
for field support. Helped set the bolts in the powerhouse for the turbines to set on.