Gerald T. Carrell
North Las Vegas, NV. 89084
Home: 702-***-**** Cellular: 702-***-****
*********@*****.***
PROFESSIONAL OBJECTIVE
PROJECT SUPERINTENDENT
PROFESSIONAL SUMMARY
With a genuine passion for construction, I am a highly motivated, result
driven professional, blending education and 25+ years of hands-on
experience. I have worked on projects ranging from multi-million dollar
heavy road construction, to multi-million dollar civic, hospitality,
industrial, and tenant improvements.
.Ability to read and analyze blueprints .Great problem solving
skills
.Keen eye for detail .Strong oral and written
skills
.Deadline and safety oriented .Computer and
AutoCAD skills
.Willing to travel as necessary
.Ability to work alone or as a team
.Willingness to work any hours (days, nights, or weekends) to meet
deadlines
.Reputation for unsurpassed loyalty, dedication, professional ethics, and
integrity
.OSHA 30 Certificate
PROFESSIONAL EXPERIENCE
?Yack Construction, Inc. N. Las Vegas, NV.
2007 to 2011
Project Superintendent
Working for a family owned General Contractor as superintendent running
projects up to one million dollars, consisting of commercial expansions,
new construction, tenant improvements and home improvements.
.Comprised schedules to allow clients the ability to remain open
without disruption during
renovations or expansions (if applicable).
.Ensuring projects stay on schedule and budget by coordinating and
scheduling sub-
contractors and suppliers.
.Meet with, and stay in contact with, clients to keep them informed
of progress and make sure
their expectations are met and exceeded.
.Conduct weekly meetings addressing job safety, cleanliness, and
security.
.Ensuring building codes are complied with and scheduling of
inspections with proper
agencies (city or county).
.Submitting RFI's and change orders to PM as needed.
.Prepared daily progress reports.
.Prepared punch lists and ensured completion.
.Submitted paperwork to proper agencies for Certificates of
Occupancy.
Gerald T. Carrell
page 2
?D & G Drafting N. Las Vegas, NV.
2000 to 2007
Computer Aided Drafter - Owner/Operator
As an independent contractor working with local concrete companies, I
prepared fabrication drawings of Tilt-up panels working from architectural
drawings.
.Drew entire footprint of project locating all panels.
.Calculated dimensions for each panel including any openings,
ledgers, or connectors.
.Submitted RFI's when dimensions or connections did not match.
.Isolated each panel onto a single page to include all information
for fabrication team.
Equipment used: AutoCAD Rel. 2000
?Garfield Steel & Machine, Inc. Rifle, CO.
1998 to 2000
Structural Steel Detailer
Working from architectural blueprints, I prepared shop fabrication drawings
of steel columns, beams, and connectors.
.Submitted estimates for man hours needed to complete drawings to
Estimator or PM.
.Drew entire footprint of project locating all columns and beams.
.Calculated dimensions to ensure all columns and beams fit together
properly.
.Submitted RFI's to architect or structural engineer when blueprints
were inaccurate or in
question.
. Isolated each column or beam onto a separate page to include all
information for the
fabrication team.
Equipment used: AutoCAD Rel. 2000 with Beamer support program.
?Kiewit Western Co. Glenwood Springs, CO. 1992
to1998
Survey Party Chief
Worked on completion of final 16 miles of Interstate 70 through Glenwood
Canyon, from Gypsum to Glenwood Springs, CO. Work was consistent with state
D.O.T. standards.
.Preformed Traverse and Bench Loops to set control points.
.Topographical surveys were conducted in preparation for excavation
of roads and rest areas.
.Construction layout of roads were done to include location of
retaining walls and drainage
areas.
.Calculated cuts and fills for roadways and drainage areas and set
blue tops for final grade.
.Rest areas were laid out for construction to include buildings,
sidewalks, parking lots, and
bike paths.
.As-built surveys were preformed as construction was completed.
.Prepared and maintained detailed field notes and drawings.
.Set up a schedule to for checking and calibrating survey instruments
to ensure continual
accuracy.
Equipment used: Topcon total stations with data collectors and Topcon
levels.
Gerald T. Carrell
page3
RELATED EXPERIENCE
?Metric Engineering, Inc. West Palm Beach, FL.
Survey Instrument Person
3 yrs.
?Ken Tator & Associates Athens, AL.
Nuclear Coating Inspector
1 yr.
?Universal Construction Co. Decatur, AL.
Survey Party Chief
5 yrs.
EDUCATION
OSHA 30 Training Certificate Las Vegas, NV. Certificate
of Completion
Colorado Mountain College Glenwood Springs, CO. Computer
Aided Drafting
Certificate
of Completion
Northeast Alabama Police Academy Jacksonville, AL. Alabama
Police Officer
Training
Commission
Florence State University Florence, AL.
Business Administration