Post Job Free
Sign in

Construction Supervisor

Location:
ft worth texas, TX, 76009
Posted:
May 02, 2013

Contact this candidate

Resume:

R esume

Gary Gause

*** *. ********* **.

Fort Worth, Texas 76107

817-***-****

Education

Alvin Community College Associate Of Ar ts General Studies 1985

University of Houston-Clear Lake Bachelor of Science Behavioral Science 1986

University of Houston-Clear lake Master of Ar ts Humanities 1992

University of Charleston 26 Hours MBA 2010

Employment H istory

Axcel Manufacturing

2403 Ludelle St.

Fort Worth, Texas 76103

March 2008 – April 2011

Machinist

A machinist within a small machine shop specializing in the manufacture of aircraft

components for defense contractors. The shop contained twelve Acme-Gridley screw

machines of various sizes and capacities. Performed the set-up and operation of said

machines. Machined raw stock into finished components of close tolerances according to

contractor’s blueprints and specifications. Did purchasing, cost estimation, and preparation

of bids. Supervised four machinists in all phases of operation.

The State of Texas - SROM

1300 Fm 655

Rosharon, Texas 77583

August 1992 – October 2007

Inventory Control Supervisor/Data Coordinator

Performed duties as an inventory control supervisor within a $12.5 million dollar

warehouse facility. Duties were inventory, Liaise with other departments and senior

department staff to highlight errors and implement improvements, perform regular audits,

analyze excess inventory and make recommendations for reducing excess, did ordering,

p urchasing, and prepared material costs for construction projects. Developed software for

i nventory control based on the FIFO system using CICS and Microsoft systems. Developed

a cross-check system for inventory control that was adapted by all State agencies. Ensured

daily operations within the department.

T he State of Texas – SROM

1300 Fm 655

Rosharon, Texas 77583

Admin Assistant to Dir. Of Construction

August 1982 – August 1992

In this capacity I prepared reports on material costs, construction time-tables, and

completion reports. Assisted in the preparation of material requirements for new

construction, arranged for shipment of material from regional warehouses to construction

sites per construction t ime-tables.

United States Navy

San Diego Naval Station

San Diego, Calif.

January 1978 – April 1982

Enlisted storekeeper in the Naval Warehouse facility @NSSD. Stocked warehouse,

p ulled material by requisitions, shipped and received material.

Shell Oil Company

3333 Hwy 6 South

Houston Texas 77072

Engineering Services Technician

Sept. 1976 – April 1979

Worked within a Central Utili ties Plant and a 2.3 MGD Wastewater Plant. Support

of boilers, chillers, process towers, and HVAC systems. Did chemical tests for feed water

systems and day to day operation of said equipment.

Certifications

FEMA Hazardous Material for Medical Personnel April 2004

FEMA Emergency Planning ` October 2004

FEMA Radiological Emergency Management October 2004

FEMA Role of Voluntary Agencies in Emergency. Mgmt. April 2004

FEMA Retrofit ting Flood Prone Structures February 2004

FEMA Developing & Managing Volunteers March 2004

FEMA Emergency Preparedness August 2003

FEMA Exercise Design August 2004



Contact this candidate