Post Job Free
Sign in

Project Engineer

Location:
Edmonton, 01, Canada
Posted:
April 22, 2013

Contact this candidate

Resume:

NAKIB AHMED, P. Eng.

****, ******* *****, ********, *******, AB-T6R3R6

Phone: Res: 780-***-**** Cell: 780-***-**** E-mail : *********@*****.***

PROFILE

A results-oriented Professional Engineer with proven analytical, structural and leadership abilities in the oil & gas industry

over ten years; determined to perform projects successfully with the applications of the most technologically advanced

engineering. Extensive experience in strategic planning, scheduling, budgeting, forecasting, procurement, construction,

project management, client / consultant interaction, report preparation & presentation. A supportive, team orientated

leader dedicated to safety with a strong focus on cost effectiveness, efficiency and highly detailed planning.

PROFESSIONAL EXPERIENCE

2007 – 2013

AECON INDUSTRIAL GROUP, Sherwood Park, Alberta,

Technical Specialist

Responsible for coordination of all technical problem solving, forecasting and cost impact between clients, consultants,

shop & field personnel.

Led & completed the stick-built pipe fabrication for “ConocoPhillips Surmont Phase 2 Project” on time within 14

months resulting in savings of over $500K. Completed 575K factored diameter inch in the fabrication shop throughout

the project.

Successfully completed 206 piperack, electrical and equipment modules for “Shell Scotford Upgrader Expansion 1

Project” within a specified time frame. Efficiently utilized manpower resulting in a 19% profit margin.

Developed a cost and budgeting system in database that allowed to accurately track the cost of a project. Actual cost

was significantly cut by application of this system.

All potential technical problems including processing communications, submittals, RFI’s, EWO’s, CWO’s, NCR’s were

submitted in an efficient manner.

Ensured all the project milestones and budget were reviewed with all concerned parties during project conceptual

stage (FEL 0 & FEL 1) to make the project viable and cost effective.

Reviewed and analyzed the project schedule and cost reports and suggested corrective actions to ensure the

anticipated cost was within the budgeted cost and eliminated excessive down time.

Analyzed Primavera P6 schedule and updated the schedule data throughout the project to identify all critical activities

to avoid project delay.

2004 – 2006

LEDCOR INDUSTRIAL LTD., Fort McMurray, Alberta,

Field Engineer – OPTI – Nexen Long Lake Project

Responsible for project planning, execution, reporting and resolved all field related technical issues .

Coordinated with clients, consultants and construction personnel regarding technical issues to resolve the problems

on a regular basis and prepared weekly progress reports for the Clients / Consultants.

Supported an employee workforce of over 400 within a fast-paced, high growth-construction environment.

Evaluated work assignments and developed a master schedule for multiple trades to facilitate proper usage of limited

labor resources. Man power was reduced by 25%.

Reviewed engineering drawings and erection procedures prior to module installation. Impleme nted QC systems,

decreased defective products 99% and saved cost of material and labor.

Coordinated with all concerned parties during Front End Engineering and Detailed Design (FEED) phase to ensure

engineering resources, materials deliverables, schedule and budgeted cost are lined up.

Reviewed engineering drawings and procedures from the pre-implementation phase of the project through

engineering construction and commissioning.

Reviewed and ensured installation work for equipment, for example: reactors, furnaces, heaters, vessels, heat

exchangers, compressors, steam turbines, pumps and coolers in compliance with approved engineer ing drawings and

specifications to avoid project delay.

Achieved an incentive bonus for 1 million accident free man-hr.

.

Nakib Ahmed Page 2

UMW VALVE, Edmonton, Alberta, 2004

Planning Coordinator

Responsible for the utilization of CNC machines and preparation of the process sheets and machining costs.

Prepared manufacturing process and fabrication methodologies.

Reduced internal defects by 30%: Created a system in order to detect internal scrap and remedy any defects with

corrective actions in manufacturing, quality and engineering.

Identified product flow patterns and machine utilization of the shop.

KEPPEL HITACHI ZOSEN, Singapore 1994 - 2002

Production Engineer

Responsible for scheduling, progress, monitoring and coordination with sub-contractors.

Conducted production and project progress meetings and analyzed different trade activities.

Enhanced productivity and profitability by 15% through initiation of a new Program Management Function across

multiple disciplines that required input and sign offs by all involved.

Procured materials and resolved construction problems with field personnel.

EDUCATION

B. Sc. (Mechanical Engineering), Bangladesh University of Engineering & Technology (BUET),Bangladesh

Post-graduate Diploma in Industrial Engineering, Asian Institute of Technology/ BUET, Thailand/Bangladesh.

Engineering Technologist Integration Program (Mechanical), NAIT -EMCN, Alberta, Canada, 2002 – 2004

TRAINING/COURSES

W elding Inspectors Level 1 (14999) Cost Control Management Course

Planning & Schedule Primavera P6.7 Project Risk Management with PertMaster Software

Construction Safety Training Systems (CSTS) First Aid, WHMIS Training Course

ABSA Pressure Piping & Quality Control Course Principles of Health & Safety Management

PROJECTS PERFORMED

Coordinated the Engineering and Project control activities for the following projects:

Suncor Fire bag 3 & 4, Suncor Hot Opti Nexon long lake upgrader AMEC South Pacific

Bitumen Project Enbridge Pump Station CNRL Pipe Rack modules

Suncor Plant 87, Suncor Snuffing Shell Scotford Upgrader phase 2 U of A Edmonton Clinic

Project, MNU replacement project. Coop CCRL Revamp Project ConocoPhillips Pipe rack,

Imperial Oil- Kearl lake project stick built & Equipment

BA Energy Modules.

Module- phase 2

Long Lake OPTI modules Laricina Gemain Modules

PROFESSIONAL AFFILIATIONS

Professional Engineer, The Association of Professional Engineers and Geoscientists of Alberta (APEGA), Canada

Fellow Member, Institute of Engineers, Bangladesh



Contact this candidate