Post Job Free
Sign in

Project Manager Engineer

Location:
Horton, AL, 35980
Posted:
March 04, 2013

Contact this candidate

Resume:

Gary D. Pope

**** ****** ******* **

Horton, AL *5980

Phone: 256-***-****

Email: *********@*****.***

Experience

In total I have twenty-seven years of project management and supervision

experience. I am familiar with ISO 9000 Engineering Standards, USDA standards on

equipment safety, and OSHA standards on equipment design. My experience ranges from

in plant maintenance and supervision. Complete project management, design and

installation of new equipment and processes. Which include working CAD drawings,

organizing and supervision of support utilities upon installation, and operational training

for maintenance and production employees.

April 2012 Maintenance Mechanical Service. Boaz, AL

March 2013 Millwright, Equipment manufacturing, and Process Piping.

Project Manager: Controlled and managed all aspects of projects from the quoting process

through design, purchasing, and installation supervision.

August 2000 Equipment Installation Sales. Geraldine, AL

April 2012 Custom equipment design and manufacturing for Fast Food, Pork, Beef,

and

Poultry processing.

Sales Engineer and Project Manager: Started as a Draftsman and Design Engineer

producing shop drawings for custom equipment designs. Promoted to Sales Engineer where

I supported sales by working with plant engineers and creating site specific layouts for

equipment installation and managed electrical and plumbing sub-contractors as to meet

the customers start up deadlines. Then Promoted to Project Manager and directly

supervised Engineering, Purchasing, and Quality Control for all equipment manufactured.

July 1995 Stork Gamco. Gainesville, GA

August 2000 Poultry processing equipment manufacturer.

Service Representative and Pre-Installation Engineer: Started as a Service Representative

servicing poultry processing equipment and supervising the installation of equipment.

Promoted to Contract Manager over all of the service contracts where I conducted

maintenance and operational training on equipment. I assisted the Research and

development department in working out flaws in their Nu-tech high speed processing lines

to help get equipment more efficient. I was then promoted to Pre-Installation Engineer and

placed over their new MX high speed cut-up line. I headed up the research and

development on the line, bringing the efficiency up by Twenty Percent and also helped in

making the equipment more modular to shorten install time eliminating customer down

time. I worked very closely with site Project Managers producing working layouts for

equipment installation that were specific for their projects as well as managing the

plumbing and electrical sub-contractors. I also worked very closely with United States

Department of Agriculture (USDA) to address their concerns on equipment safety and

sanitation for these projects.

Education

High School: Geraldine High School. Graduated in 1980

Geraldine, AL

College: Snead State Community College. Graduated in 1995

Boaz, AL

Degree: Associates in applied Science Technology

Electronic Engineering Technology

Applied Engineering Design



Contact this candidate