Harry Miller
Margate, FL ***63
**********@***.***
To whom it may concern,
Since the first day I began in the construction industry, I have
consistently realized my objective of bringing every single project in on
time and under budget. However, I have never believed that meeting those
criteria alone was good enough. I currently have forty-five years of
experience which includes: overseeing field construction of high rise
condominiums, supervising the construction of schools, manufacturing
facilities for liquid, dry and/or paste plant for the pharmaceutical
industry, and negotiating and evaluating contracts to receive the most
value for the money. My most recent position was overseeing construction of
roads and drainage facilities for the City of Miami.
To help you learn more about my track record, I have enclosed my r sum and
project experience. While it illustrates my experience and training, what
it cannot communicate is my dedication to my craft. My professional creed
includes:
. Pride in the quality of my work, and a willingness to personally perform
even the most menial tasks to remove project obstacles and get the job
done.
. Ability to envision how specific parts of the project should look and
flow, and communicate those ideas to architects, designers, and upper
management, always with positive results.
. Expertise in blueprint assessment and collaborating with architects
throughout the course of a job to point out oversights that would
unnecessarily consume the client's time and money.
. Excellent skills in guiding, motivating, training and mentoring other
craftsmen.
Based on my experience and strong commitment to my craft, I know I will add
significant value to your team. I look forward to discussing my
capabilities in more detail, and am available for a personal interview at
your convenience. Thank you for your time and consideration.
Sincerely,
Harry Miller
Harry C. Miller
6116 NW 22nd Street
Margate, Florida 33063
**********@***.***
Home Phone 954-***-****
Cell 954-***-****
Goals
To build a lasting relationship with a company through hard work,
dedication and quality performance.
Employment History
January 2008 - October 2010 F.H. Paschen
Sr. Construction Superintendent
Supervise and coordinate all field construction. Ensure jobs were built in
coordination with plans and specifications. Jobs consisted of new drainage,
roadways, and heavy civil work. Work directly with client to ensure jobs
were completed with in budget. Estimated job cost range from two hundred
thousand to five million. Maintain FDOT standards and OSHA safety on all
projects.
June 2007 - December 2007 Moss Construction
Senior Superintendent
Went to work with company to build schools, was immediately put on a 27
story high-rise estimated job value was 127 million. Resigned after six
months.
February 2005 - June 2007 Pirtle
Construction
Senior Superintendent
First project Oakland Park Elementary, Oakland Park, Florida. This project
was a 24 pack (2 story) 34,000 sq. ft. building estimated value of 6.2
million. Completed job in 5 months. Second job was a project in Miramar,
Florida. This was also a 24 pack (2 story) 34,000 sq.ft. building
including an addition of an 18.000 sq. ft. Science Building, estimated job
value 11 million. Completed job in 9 months. Third project was Margate
Elementary a 24 pack (2 story) 34,000 sq. ft. building, completed job in 6
months. Estimated job value 6.5 million. Fourth job was Broward Library at
Broward Community College in Hollywood, Florida. Estimated job value was 40
million. After completing the Library I was sent to Miami to build a
Cultural Center for the City of Miami. Estimated job value was 62 million.
Left company in June of 2007
February 2002 - February 2005 Integrated Project
Services
Senior Superintendent
Took over Aspire Pharmaceutical Manufacturing Plant in Westin. Florida. It
was an 89,000 sq. ft. facility with a 43,000 sq. ft. equipment platform.
Completed job on time and on budget. Next project was Abrika
Pharmaceutical in Sunrise, Florida. It was an 18,000 sq. ft. test plant
for drugs to go to the FDA for approval. In November of 2004 moved to Renal
Liquid Plant to assist in the completion of facility due to sickness of
Superintendent. Left IPS in February2005 due to lack of work.
December 2001 - February 2002 Associated Builders and Contractors
HVAC Coordinator
Conducted Vocational teaching. Left for better position.
October 1999 - September 2001 Structure Tone
Construction Manager
In charge of all food service and laundry equipment on all sites. 10
million full coordination and installation . Superintendent for 826,000
sq. ft parking garage with 161,000 sq. ft. retail spaces. Handled all
structural and architectural trades as well as M.E.P. work on project.
Resigned from company in Sept 2001.
September 1982 - October 1999 Harry Miller Co./Cobra Equipment
Co.
Owner-Operator
In the early 1980's I got into Institutional Industry and was self employed
at this time. The company I built specialized in renovations and
miscellaneous metals. I performed work in low and mid-rise facilities as
well as arenas and stadiums. The various scopes of work I performed
included complete area design, renovation coordination of demolition and
reconstruction of walls, floors, electrical, plumbing, air conditioning and
ventilation systems. Also involved in all types of light and heavy
rigging.
During this 20 year span in my career I completed a large amount of
interior and exterior home and small business improvements and renovations.
Projects:
1. Plantation General Hospital
2. Eastview Hospital
3. Woman's OFTX Hospital
4. Jessie Jones Rotary House
5. Middle Georgia Medium Security Prison
6. East Tennessee medium Security Prison
7. Middle Tennessee Maximum Security Prison
8. West Tennessee medium Security Prison
9. Sunrise Mountainview Hospital
10. Orman Community Hospital
11. Holiday Inn South
12. Centennial Medical Center
13. Trident Hospital
14. beach Community Hospital
15. West Paceis Ferrys
16. Nashville Arena
September 1978 - September 1982 Baring Industries
Field Coordinator
Installation of food service and commercial laundry equipment. Project
layout and light and heavy rigging. Overseas projects include: Jetta
International Airport - Saudia Arabia; Marriott Hotel - Cairo, Egypt; and
hotel construction in Puerto Rico, Virgin Islands, and Netherland.
January 1974-September 1978 Condor Stainless Steel Fabrication
Field Coordinator
Design, manufacturing and installation for food service equipment. Overseas
projects include: Rebuilding cruiseships for Carnivale, Norweigan
Carribean; and hotel construction in the Netherlands. Instillation of food
service equipment and refrigeration systems at Cocodrilos Sports Park in
Caracas, Venezuela.
September 1965 - January 1974 Sunrise Sheet
Metal
Installer
Fabrication, installation of air conditioning and metal fabrication
Education
1965 Jupiter High School
Technical Schools
1980
Washex Manufacture - Wichita Falls, TX
Training: Commercial Laundry Equipment
1980
Fulton Boiler School - Indiana
Training: High-Low Pressure Steam Vessels & Thermo Oil System
1980
Clever Brooks Boiler School - Kentucky
Training: High-Low Pressure Steam Vessels
1980
Wascomat Laundry Equipment School - Floral Park, N.J.
Training: Repair & Service Laundry Equipment
1980
Chicago Dryer Corporation - Chicago, IL
Training: Commercial Laundry Equipment
Licenses/Certifications
Type I, II Refrigeration certificate from Ferris State University,
Tennessee
10 hour OSHA Certified
30 hour OSHA Certified
Florida Storm Water Certification
First Aid/CPR Certification
Project Superintendent Experience
( City of Miami Miami, Florida
$5 million job order contract per year for 5 years including
renovation and repair of City facilities.
( School Board of Broward County Margate, Florida
$5.5 million, 34,000 sq. ft., two-story addition to Margate
Elementary School.
( School Board of Broward County Miramar, Florida
$9 million, 34,000 sq. ft. two story addition and science lab
building for Miramar High School.
( School Board of Broward County Oakland Park FL
$5.5 million two story addition to Oakland Park Elementary
School.
( Aspire Pharmaceutical Westin, Florida
$80 million, 90,000 sq. ft. manufacturing plant with 43,000 sq.
ft. equipment platform.
( Abricka Pharmaceutical Sunrise, Florida
$8 million, 18,000 sq. ft. new pharmaceutical research and
development facility.
( NABI Boca Raton, Florida
Renal liquid pharmaceutical plant.
( Diplomat Corporation Ft. Lauderdale,
Florida
$375 million new luxury hotel, country club, parking garage,
retail, and boat dock.
Harry Miller Company / Cobra Equipment Leasing, Inc. Quincy,
Florida
25 years as owner/operator specializing in renovation and miscellaneous
metals including building and installing stainless steel equipment (laundry
and food service).
INSTITUTIONAL PROJECTS
( Plantation General Hospital Plantation,
Florida
Kitchen and cafeteria renovation.
( Eastview Hospital Las Vegas, Nevada
Food service, laundry equipment and cart wash systems
completion installations, start-up and employee training.
( Women's OFTX Hospital Houston, Texas
Food Service, laundry equipment and cart washing systems
complete installations, start-up and employee training.
( Sunrise Mountainview Hospital Las Vegas, Nevada
Food Service, laundry equipment and cart washing systems
complete installations, start-up and employee training.
( Centennial Medical Center Nashville,
Tennessee
Food Service, laundry equipment and cart washing systems
complete installations, start-up and employee training plus
complete laboratory installation.
( Beach Community Hospital New Smyrna Beach,
Florida
Food Service, laundry equipment and cart washing systems
complete installations, start-up and employee training.
MILITARY PROJECTS
( U.S. Navy, Georgia
Commission of dining hall on a bond forfeiture of another
contractor at Kings Bay Naval Base.
( U.S. Army, Georgia
Dining hall refurbishing at Fort Benning Army Training Center.
( U.S. Marines, South Carolina
Food service replacement banquet