James W. White Telephone: Home
*** ******** ******** **** ***-371-
3247
Royal Palm Beach, Fl. E-mail:
ab81ep@r.postjobfree.com
Objective: Construction Superintendent
Professional Experience:
SUPERINTENDENT- Mouw Associates, Inc., 409 NE 3rd St., Delray Beach, May
2011 to Nov. 2012
Bethesda West Hospital, Boynton Beach, new 257,000 sq/ft 5 story, 80 bed
full service Hospital
Supervised the 4th and 5th patient tower and dedicated 3rd floor Mechanical
room which included all mechanical systems for patient care, AHU's (7), hot
water heater, Ionized water, Med Air, Med Vacuum, IT Room, Pneumatic Tube
Pump.
GENERAL SUPERINTENDENT - ANF Group Inc. Cooper City, Aug. 1999 to Nov. 2010
Commercial Projects:
Crown Lift Trucks Distribution Warehouse and offices (Tilt Wall)
U. S. Postal Branch Office (Tilt Wall)
Spirit of America, 50,000 sf office renovation, Fast track 90 day
completion Flamingo Falls Shopping Center and Tenant Build
outs (Tilt Wall)
Healthcare Projects:
Memorial Hospital West
603 Medical Office Building, joint venture with Bovis Lend-Lease
Doctors offices build outs inside 603 M.O.B. (14 offices)
Phase A-Emergency Room Shell -2 1/2 story addition with roof top heli stop
Phase B-Emergency Room Build out 25,000 sf
Phase C-2nd Floor O. R. Patient Prep & Post area, 36 beds, 2 Cardio Cath
Lab procedure rooms
Phase D-6 new O. R.'s, Decontamination, Sterilization, and Central Sterile
Storage rooms
Phase E-Imaging Services, 4 X-Ray rooms, 2 CT Scan rooms, Ultra Sound
Suite,
2 Interventional Procedures Rooms, Patient Holding area, 3T
MRI Suite
Central Energy Plant Expansion
Cyber Knife addition to Cancer Institute
Memorial Hospital Miramar
3rd & 4th Floor Vertical Expansion 40 Bed addition and created a Neonatal
Intensive Care Unit with 6 Beds and Caesarian O. R. in the same time frame,
completed 1 month ahead of schedule Northwest Medical Center
2 Cardio Vascular Operating Rooms- remodel 2 existing OR's within a
functioning OR wing
Universities:
Nova Southeastern University-new Energy Plant providing power and chill
water for the University Lower School classrooms and auditorium buildings
under construction at the same time
SUPERINTENDENT - Itasca Construction Associates, Boca Raton, Jan. 1994 to
Aug. 1999 Miami Airport Center, Phase I consisted of new 15" water main
loop and sanitary systems with a Lift Station for the site, as well as
demolition of structures, and construction of a new facade for the
existing building utilizing Tilt-Wall construction technology, performing
the work in phases in order to keep tenants business operations functioning
with minimal interruptions. Phase II was the construction of two new Tilt-
Wall structures: Building D was a 65,000 sq. ft. single tenant warehouse
operations center. Building E was a 35,000 sq. ft. flex space
office/warehouse shell. Gridiron Club in Weston and constructed a 25,000
sq. ft. office and manufacturing plant for Logo of the America's in Weston
Park of Commerce. 200,000 sq. ft. of warehouse space at Blue Lagoon in
Miami.
SUPERINTENDENT - Consolidated Construction, Ft. Laud., June 1993- Jan.
1994
Shell construction on commercial and custom residential projects in Dade
and Broward Counties.
SUPERINTENDENT - Pro Built Const. Inc. West Palm Beach, Nov. 1989-June
1993
Shell contractor. Schools, gymnasiums, warehouses, utilities buildings, car
dealerships, and low rise structures.
SUPERINTENDENT - C. G. Chase Const. Inc. Miami, March 1989-Oct. 1989
Port of Miami-Terminal 8 & 9 Expansion.
I was part of a three superintendent team constructing the Park Place West
Apartment complex, consisting of two high-rise apartment buildings and a
parking garage.
Port of Miami addition to passenger cruise terminal 8 & 9 for Carnival
Cruise Lines.
SUPERINTENDENT - Consolidated Const. Services Inc. Orlando, Oct.1988-March
1989
I was asked to take over as superintendent, when my former employer, Vica
Corp., was relieved from the Bible Baptist Church project in Miami. I also
ran work on other churches in Ft. Pierce and Ft. Lauderdale.
SUPERINTENDENT - Vica Corp Miami, June 1988 to Oct. 1988
Shell contractor on the Bible Baptist Church project. Vica Corp. suffered
financial problems and was removed from the project.
SUPERINTENDENT - Bob Perry Construction, Miami Sept. 1987 to June 1988
Dock Masters office at Cocoplum Marina, Coral Gables. This particular
project involved strategic layout of friction piles to avoid interference
with tie rods and dead men anchorage for the existing seawall surrounding
the site on three sides. This also involved the logistics and coordination
to erect a 83' wide structure, four stories high, on a 100' wide strip of
land with limited access.
SUPERINTENDENT - Jenbar Const. Inc. Miami, June 1983 to Aug.1987
Turnkey general contractor, building warehouses and low rise office
buildings.
I have worked as a carpenter foreman, layout man, and carpenter, both rough
and finish, since 1971. Worked summers as a laborer after High School and
College.
Education:
South Florida Carpenters Union Apprenticeship program, graduated 1975.
Miami Dade Community College majoring in engineering and drafting with
night courses in construction and blue print reading.
Florida State General Contractors License. CGC 012332
I am familiar with Microsoft Project Scheduler, Viewpoint, and Expedition
programs.