Post Job Free
Sign in

Pipeline Engineer/Project Manager/Project Engineer

Location:
Karachi, Sindh, Pakistan
Posted:
September 17, 2013

Contact this candidate

Resume:

IMRAN KHAN, PMP

House No. **, Street *, Sector C, Near Noor Masjid,

Akhtar Colony, Karachi

+923**-*******, +923*********

********@*****.***

OBJECTIVE

By the utilization of available resources, acquired skills, proper planning and hard work achieve the goal within

desired time frame with maximum possible accuracy. By continuous improvement in the system prove myself

one of the best Pipeline Engineer of an organization.

CAPABILITY STATEMENT

Sufficient experience in Pipeline maintenance, integrity checks like intelligent & cleaning pigging activities,

hydrostatic testing of Pipeline, Preparation of Tender Documents, Hot Tapping & Stopple Plugging activities,

sleeve welding activities, planning of projects using MS project.

SKILLS & ABILITIES

MS PROJECT CREATE AND MANAGE PROJECTS

SAP, ORACLE ANALYTICAL & LOGICAL THINKING

MS OFFICE LONG TERM RESULT ORIENTED PLANNING

CREDENTIALS AND CERTIFICATIONS

YEAR INSTITUTE DEGREE PROGRAM PERCENTAGE/

GRADE

April 2013 Project Management PMP Project Management

Institute (PMI)

April 2013 - Institute of Business MBA MBA 3.8 GPA

Ongoing Administration Karachi,

IBA

Sep 2012- Pakistan Institute of Diploma Project Management Completed (First

January 2013 Management (PIM) Position / 84%)

2004-2008 NEDUET BE Petroleum 82.34% / A+

Engineering

2002-2004 D.J.Sindh Govt. Science HSC Certificate Pre-Engineering 81.73% / A+

College

2000-2002 F.G.Public School Karachi SSC Certificate Matric Science 83.76% / A+

Cantt.

WORK EXPERIENCE

PAK-ARAB REFINERY LIMITED (PARCO)

July 2009 – Present

Pak Arab Refinery Ltd (PARCO) is a Joint Venture between Government of Pakistan and the Emirate of Abu

Dhabi through International Petroleum Investment Company (IPIC), incorporated as a public limited company

in 1974.

PARCO is an integrated energy company, and is a key player in the country’s strategic oil supply and logistics.

PARCO's major business activities are:

Refining

Product transportation through multiple pipelines approx. 2000 km

Storage of various products

Marketing

The organization encompasses Pakistan’s largest refinery and 2000 Kms of cross country pipeline network,

including 8 pumping stations and 25 block valve stations.

The company obtained three simultaneous international certifications: ISO 9001:2008 (Quality Management

System), ISO 14001:2004 (Environmental Management System) and OHSAS 18001:2007 (Occupational Health

and Safety Management System).

ASSIGNMENTS CARRIED OUT WITH PARCO

Since joining PARCO in 2009, I have been assigned in Pipeline operation and maintenance section. During this

time, I have the opportunity to take part in all maintenance activities, Risk Analysis and pipeline projects.

Job Title: Pipeline Engineer (E-III)

Job Responsibilities:

Preparation of Tender Documents (Technical & Commercial), Technical evaluation of bids, presentation

note for IEC’s approval, monthly activity report, Bill of quantities for materials to be indented (Pipeline

Spares and Materials).

Row grading, stringing, Cold bending, Welding, N.D.T, application of heat shrink sleeves (co ating) tie-

in’s, holiday inspection, lowering in, back filling, thrust bore cased/uncased canals, roads and railway

crossings, hydrostatic test and commissioning.

Carryout scheduled survey of pipeline to check the extent of external corrosion of Pipeline.

Loading, launching, retrieving and tracking of cleaning, geometrical and intelligent pigs for diameter

26” white oil pipelines, 16” diameter KMK Pipeline, 20” diameter Transfer Line and 26” diameter KPLP

Line.

Assist in pigging contractor to carryout Intelligent Pigging campaign in the region.

Involved in procedure qualification test and welder qualification test was conducted as per WPS

supplied by the owner.

To plan execution schedule, to coordinate with contractor for the achievement of scheduled milesto nes,

verification of daily, weekly and monthly progress reports.

To conduct weekly meetings with contractor and monthly management progress review meeting at

site/ head office.

Attending real time emergencies to maintain the integrity of PARCO Pipeline n etwork in the designated

region.

Receive requisition for repair, maintenance from immediate supervisor, arranges to obtain related

material and deploy team to carry out necessary repair and maintenance work on site by keeping in

view of all safety requirements.

Receive schedule of Pipeline replacement due to internal corrosion in the assigned region and prioritize

the repair maintenance work.

Plan for periodic assessment of designated Pipeline region maintenance work by carrying out required

surveys of Pipeline. Obtain approval from superior and arrange to perform required surveys

accordingly.

Monitor graphs of surveys, interpret and arrange for other survey till final identification of deteriorated

part of the line, and prepare estimates for excavation cost, pipeline, material, time etc. Prepare survey

report, recommend desired action and forward to superior for approval.

Coordinate with the Stations & Terminals before carrying out repair and maintenance of Pipeline to

stop pumping or decrease flow rate for Sleeve welding over Pilferage, metal loss and dent points.

Coordinate with HSE representative of the designated area for obtaining required assistance during

execution of hot work at site.

Create/close maintenance request (Notification/Work order) on SAP and Oracle for Enterprise

Resource Control (ERP).

Direct subordinates or contractor to carry out approved repair and maintenance work, check report of

welding to ensure flawless welding and details of tests carried out with the result to ensure strength of

pipeline.

Visit the maintenance site, review pace and progress work against plans and ensure that maintenance is

taking place according to the schedule and prescribed procedures and policies.

Prepare periodic progress reports showing that status of work in progress in terms of percentage of

work completed and forward to superior.

Keep abreast of emerging new technologies in the field of pipeline maintenance e.g. diagnostic

techniques, coating and wrapping material, equipment/ machinery, and carry out analysis of relevant

factors likely to affect Pipeline maintenance.

Arrange schedule preventive maintenance of laid down pipeline, Block valve assemblies, Microwave

towers in the concerned region and ensure that manuals describing preventive maintenance

programmmes are followed.

Prepare Maintenance History Record of all Pipeline equipments based on Preventive and Corrective

Maintenance.

Fully familiar and conversant with Integrated Management System IMS/HSEQ.

PARCO is ISO (ISO 9001 “QMS”, 14001 “EMS” and OHS 18001) certified company and I am the member

of Integrated Management System Zonal Team.

To take part in quarterly HSE zonal team meetings.

To take part in preparing Investigation report to determine root/contributory causes of

accidents/injuries/near miss.

Perform any other work assigned by the immediate superior.

SPECIAL EXPERTISE

INTELLIGENT PIGGING & GYROSCOPIC SURVEY

Preparation of Contract documents & Technical Specifications for Intelligent pigging of 16 inch dia.

PARCO crude oil pipeline& 26 inch dia. White oil pipeline.

Carried out Pigging campaign as Field Coordinator at KMK pipeline from Karachi to Shikarpur in 2011

with M/s Weatherford & NGKS personnel’s from Russia.

Expert to interpret the ultrasonic, MFL and Combo (MFL/TFI) pig data of intelligent tool.

PROJECTS

For effective accomplishment of Integrated Management System (IMS) at PS-2, BUBAK, I was

involved in a project whose main objective is to implement SAP and MAXIMO/ORACLE in daily routine

Maintenance Activities. In doing so, I gave Practical Trainings and Presentations to Operation Staff at

PS-2, BUBAK.

Installation of 8” dia Non-Slam NRV at bypass of PARCO block valve assemblies BV-08 & BV-10.

Technical and Commercial Evaluation of bids and prepared presentation Note for IEC (Internal

Evaluation Committee) approval for supply of Carbon-Steel pipe of 16” Ø API 5LX-46 (44th Edition) wall

thickness 0.5”, 26” Ø API 5LX-70 (43rd Edition) wall thickness and 20" Ø API 5LX-42 (44th Edition) wall

thickness 0.281”.

Prepared Technical and Commercial evaluation of bids and prepared presentation Note for IEC

approval for Horizontal Directional Drilling (HDD) of PARCO overhead crossings (Unarwah, Shahi,

Begari and Patfeeder Canal).

Prepared Technical evaluation of bids for supply of 16” dia, Wall Thickness 0.5”, 90ᵒ & 45ᵒ 3D bends

conforming to ASTM A-234, WPHY-60 and ANSI B 16.9.

Prepared Technical evaluation of bids for supply of 18000 m, 16” dia, Wall Thickness 0.375”, API 5LX -

56 Factory 3LPE Coated pipe, longitudinal or helical seam submerged for Karachi by-pass project.

CURRENT/ONGOING PROJECTS

Horizontal Directional Drilling (HDD) at Begari, Shahi, Unarwah & Pat-feeder canals for 16” dia and 26”

dia Pipelines.

Intelligent Pigging of 26” diameter White Oil Pipeline (WOP) Port Qasim to Mahmood-Kot.

Re-routing of 16” diameter KMK Pipeline Section-1, Karachi by pass (phase-1)

Commercial Feasibility Study of KMK Pipeline Segment Re-routing in Section-IV (KM-087+000, Kot

Chutta to TS-2, Mahmood Kot).

SHORT COURSES/TRAININGS

Three days extensive training on KAIZEN-Tools for Continuous Improvement conducted by Pakistan

Institute of Management (PIM).

One week extensive Emergency Response Training at Mid-Country Refinery (PARCO).

One year Course on Petroleum property, Environment & Safety Management by Imran-Ullah Sharif at

NEDUET.

CO-CURRICULAR/HSE RELATED ACTIVITIES

Emergency Response Team (ERT) member at PARCO.

As a safety conscious individual, actively participate as Zonal Team Member.

Actively took part in quarterly HSE zonal team meetings.

Actively participate in Community or Public Services.

Playing Cricket, Football, using internet, watching T.V, Country side adventure trips.

ACHIEVEMENTS/AWARDS

Got PMP certification in first attempt.

Got second position in ERT course.

Achieved scholarships on academic basis due to outstanding performance.

Awarded a number of certificates in school due to brilliant academic performance.

REFERENCES

Abdul Karim Dero (Contact # +923*********)

Senior Engineer Pipeline (Group Head)

Pak-Arab Refinery Limited (PARCO)



Contact this candidate