Post Job Free
Sign in

Engineer Six Sigma

Location:
Waukesha, WI
Posted:
September 17, 2013

Contact this candidate

Resume:

PRAVEEN NARASIMHAN

N**W***** Saddlebrook Drive, #206

317-***-****

Pewaukee, Wisconsin 53072

praveennarasimhan@ya

hoo.com

CAREER PROFILE

Multi-faceted Lean Leader with a strong quality/operations background

spanning diverse processes, machinery, assembly methods and business

improvement initiatives. Delivers cost savings and productivity gains

using Value Stream Mapping, 5S, Visual Management, Standard Work,

Layout, FIFO, Kanban, SMED, Six Sigma DMAIC, Kaizen, SOP and

Data/Measurement tools. Strong auditing experience including customer

TS and AS 9100 compliance and using 8D, A3 and 5 Why problem solving

for corrective actions and continuous improvement. Successfully

promoted culture changes with Employee Involvement strategies and

frontline/managerial training.

PROFESSIONAL EXPERIENCE

2012 to 2013: MTE CORPORATION - Menomonee Falls, Wisconsin

International supplier of line/load reactors, passive harmonic filters,

Matrix Active Pure sine harmonic filters and Sine wave motor protection

filter products designed to improve the reliability of power electronic

systems.

Lean Champion

Develop and implement Lean Deployment strategy across the corporate

functions and manufacturing facility involving 100 employees. Duties

includes: Develop Standard Work Cells; business systems to support

company's strategies; manage manufacturing engineer and capital equipment

installation.

. Managed Implementation of $250K Foil winding machine by

coordinating activities with the various internal cross-functional

teams and international supplier.

. Developed Kaizen roadmap of the company to support the strategic

initiatives like expanding business into new markets, move

manufacturing close to customer locations and increase

productivity.

. Updated managerial standard work to integrate GEMBA plant floor

walks into their regular schedules for identifying waste and giving

attention to corrective action plans.

. Implemented SQDC boards across all the cells to track daily metrics

and cultivate a continuous Improvement Culture in the manufacturing

facility.

. Initiated Corporate Business system Kaizen's: Transfer products to

Offshore locations, update costing in MRP for various changes,

Visual management of Prototyping process and minimize Commercial

launch process time.

. Facilitated Kaizen events in the assembly area and created standard

work cells with POU and Line side materials to implement 1 piece

flow. The cell was created as model cell for the plant and improved

productivity by 48% and inventory turns by 5.

. Judged the kanban implementation of different candidates and

certified them as subject matter expert based on sustainment of

kaizen and achievement of the goals

. Created the plant layout and operations vision of the Menomonee

falls for the next 3 years based on product mix, marketing and

sales strategy

2010 to 2012: GKN SINTER METALS - Menomonee Falls, Wisconsin

$1B powder metal parts manufacturer supplying automotive, appliance,

power tool, lawn & garden and diverse OEM markets and part of a $7B

diversified global industrial conglomerate.

Lean Manager

Drove Lean initiatives across 3 facilities encompassing precision

machining, powder metal compaction and tool & die operations involving

125 employees. Duties featured: identifying and leading

productivity/savings projects; facilitating Kaizen and Six Sigma

events; customer quality problem solving; providing expertise/new

strategies to management; training programs; data collection and

reporting; frontline coaching; and daily reinforcement efforts.

. Exceeded cost savings and productivity targets of $400k+ in 2010

and 2011, with 2012 results running $17k above monthly goals.

. Facilitated multi-shift Kaizen at the powder metal facility

resulting in a new layout of the secondary process areas, which

yielded a 15% direct labor improvement due to a 45%, decrease in

part travel distance.

. Initiated Business Process Improvements including: reducing Sales

Office quoting lead time by 15 days; and improving Quality Audit

readiness by developing a dedicated problem solving system for

common customer concerns and promoting 30 day corrective action

turnaround.

. Increased uptime 30% by leading Six Sigma program in tool & die.

Mentored program candidates in identifying the root cause of EDM

machine issues producing excess process variation.

. Trained site teams and personnel on problem solving concepts

including 8D, A3 and 5 Why methods. Shrank inventory variation from

2.4% to 0.8% by using A3 concepts and tools.

. Devised 5-year plant strategy spanning continuous improvement,

manufacturing process capital requirements, sales, quality and

purchasing. Created and monitored the supporting annual plans and

performance.

. Eliminated bottlenecks between powder metal press and sintering

areas. Reduced WIP 20% by balancing and smoothing the flow by

creating FIFO lanes and limiting/correcting the number of product

staging carts.

. Advanced the Production Manager Continuous Improvement Training by

developing program materials and assisting candidates with case

study and storyboard preparation.

. Prepared key monthly reports, which were used in management

planning/issue identification, including KPI's, Overall Equipment

Effectiveness, Delivery Schedule Attainment, First Pass Quality,

People Productivity and Stock Turns. Facilitated Kaizen introducing

FIFO to increase powder metal stock storage by 5 turns

2006 to 2009: PRAXAIR SURFACE TECHNOLOGIES - Indianapolis, Indiana

Producer of high performance coatings and surface processes for aerospace

and industrial applications

Continuous Improvement Engineer

Duties emphasized implementing Praxair's Operational Excellence System

integrating Lean, supply chain, quality and operating best practices.

Pivotal role in conducting internal audits per AS 9100 and NADCAP

standards, as well as auditing the implementation of the OpX System at

other facilities.

. Introduced visual boards in streamlining the scheduling processes

to improve resource utilization. Increased utilization 20% by

calculating equipment capacity and initiating Managing for Daily

Improvement.

. Partnered with Cessna on a Supply Chain Extended Value Stream

Mapping Event. Results led to qualifying new local suppliers

shrinking travel related lead times by 2 weeks and a 50% reduction

in batch size

. Saved $60k annually by leading collaboration with Grainger in

implementing a Vendor Managed Inventory of production

consumables/supplies. This "first time" VMI program became a

corporate model.

. Performed DMAIC project using Minitab software to identify wear

cycles for rebuilding plasma-coating torches. Saved 850 labor hours

and $25k in supplies per year, while also improving the rebuild

processes.

2004 to 2006: HERAEUS ELECTRO-NITE COMPANY - Peru, Indiana

Leader in developing sensors, measurement and control devices for molten

metal processes

Manufacturing Engineer

Developed engineering solutions for 4 sensor production lines.

Priorities emphasized: integrating Demand Flow Technology into

production processes; creating standard job instructions; and

structuring the Engineering Change Request processes for new product

programs. Served as Substitute Supervisor for a team of 25 employees.

. Supported new product launches by utilizing Design of Experiment

methods to determine the correct pressure and temperature settings

per different materials. Established the proper composition of

powder mixtures when combined with petroleum-based mixers.

. Defined labor requirements using DFT concepts in calculating the

maximum capacity of molding machinery. Also, improved labor

utilization/flexibility by changing packaging methods to remove non-

value added tasks.

. Reduced powder inventories and improved cash flow $25k by creating

plant floor staging areas and visual tools providing the

availability of raw materials.

EDUCATION and PROFESSIONAL DEVELOPMENT

Master of Science, Engineering - 2004 - Kettering University f/k/a GMI -

Flint, Michigan

. Served as an Adjunct Lab Lecturer - Industrial Manufacturing

Department, providing classroom and lab instruction to 60 students in:

Machining; Metal Joining; Castings; and Plastic Injection Molding.

Bachelor of Production Engineering - 2001 - Bharathiar University -

Coimbatore, India

Six Sigma Green Belt - Praxair, 2006; Lean Practitioner - LVSI, 2008;

Continuous Improvement Leader - GKN, 2010; PFMEA, APQP & PPAP - AIAG, 2012;

TQM - Quality Training Institute; 2007; Demand Flow Technology - JCIT,

2005; Basic Powder Metallurgy - MPIF, 2010; GE's Supplier's Standard Work

Kaizen - Shingijutsu Consultants, 2009

AutoCAD v12/14; MS Project; Minitab 14; BAAN; ARENA; MS-Visio; MS Office

Suite; Lotus Notes



Contact this candidate