Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
Iran
Posted:
September 16, 2013

Contact this candidate

Resume:

More than thirteen years experience in oil/gas/petrochemical, power generation plants and industrial projects in basic endorsement, Feed design, detail design, pre commissioning and construction including ten years in oil, gas and petrochemical both onshore and offshore plants and three years in overhead transmission lines, high voltage substations and hydro power generation plants. Oil plants include desalting plants, petrochemical plants include high density poly ethylene plant (HDPE) and high impact polystyrene plant (HIPS) and gas plants include two natural gas liquid plants (NGL) and one increasing pressure gas station plant on pipe line. All of these are onshore prjects. Many offshore projects consist of process platform, living quarter platform and wellhead platform. Three years experience in designing of overhead transmission line both mechanical and electrical in various voltage levels from 20kV to 230kV. One year in designing hydro power generation plant and one year in designing control & protection high voltage substations.

Having effective experience in 6.6kV, 4.16 kV, 13.8kV and low voltage switchgears/MCC’s with both American and European standards, Arc resistance MV switchgear/MCC, power plant up to 40MW and over head transmission line up to 400kV, control and protection of high voltage substations.

Major equipment and system which I have worked on are diesel generator, gas turbine generator, Micro turbine generator, MV&LV switchgear, MCC, UPS, LV and MV motor, navigational aids, Ex equipment, earthing system, solar system, lighting system and cabling system.

Having experience in preparation if BID document including wellhead platforms, FPSO and LNG.

EXPERIENCE

Dec 2010-

Present

Lead Electrical Engineer – NISCONI (NIPPON STEEL CONSTRUCTION INDONESIA), Jakarta, Indonesia

Su Tu Nau Field Development FEED Project, Leading electrical team (over than 7000 man-hour) for preparation project’s deliverables, coordinate with client and project manager, Input to MDR and attend meetings with the client. This project was FEED design of two wellhead platform in offshore Vietnam owned by Cuulong Oil Company. Main power generation designed with Micro turbine (2x200kW) and all ANSI/NEC standards have been followed. The project execution was fast track basis and RFQ/PO for long lead items including Micro Turbine, Diesel Generator, Switchgear/MCC, UPS and E-house have been issued in the procurement stage.

Lead Electrical Engineer – NISCONI (NIPPON STEEL CONSTRUCTION INDONESIA), Jakarta, Indonesia

South Mahakam Field Development EPC Project, Leading electrical team for preparation project’s documents including engineering, procurement, construction and pre commissioning documents. Involved in during pre commissioning and construction and APAVE audit, time to time staying at construction site and retrofit their issues, This project was EPC of three well head platforms belong to TOTAL. The electric power generation was three 4kW close circuit vapor turbine which convert to 24DC voltage and distribute. There was a big solar system on the platforms as a backup supply for 1200Ah nav-aids systems.

Jan 2008-

Dec 2010

Senior Electrical Engineer –WorleyParsons, kuala lumpur, Malaysia

ONGC B193 process platform Project, This project was a CPP and living quarter offshore platform. Power generation system was three 11kV gas turbines each 11MW. Generated power distributed to the platforms via 6kV and 0.4kV voltages downstream system. In this project I prepared all studies including DG sizing, GTG sizing and manual motor starting. Besides I prepared specification for PMS, electrical installation and submarine cable. I supervised graduate engineers for preparing cable sizing and lighting calculation and cable schedule. I supervised designers for preparing substation panel arrangement, Lots of mechanical packages specifications, data sheets and requisition were reviewed and commented by me.

Senior Electrical Engineer / Active Lead–WorleyParsons, kuala lumpur, Malaysia

Petronas Carigali Sabah Oil Gas Terminal (SGOT)project FEED verification, This onshore plant had 4 turbo generators 11kV, 11 MW which supplied power to 6.6kV switchgear via two 11/6.6kV transformers and six 11/0.420 kV transformers. I verified whole FEED package including specifications, data sheets, single line diagrams, NERs and layouts.

Senior Electrical Engineer –WorleyParsons, kuala lumpur, Malaysia

BP phase III LanDo development project FEED and Detail design, prepared document deliverable and project time schedule, prepared AC UPS sizing and related single line diagrams, interdisciplinary coordination.

Senior Electrical Engineer –WorleyParsons, kuala lumpur, Malaysia

Exxon Mobile Tapis EOR and rejuvenation project, CPP platform FEED design, prepared 13.8kV and 4.16kV and Low voltage switchgears specification inline with Americans standards NEMA and ansi, prepared specification for load shedding system, prepared specification for electrical control and management system, prepared electrical protection philosophy for whole power system including 11.5MW generators, 3.75MW transformer, 3.75MW soft starter and motors, medium voltage submarine cables and high resistance grounding, prepared single line diagrams including 4.16kV soft starters for medium voltage and low voltage switchgears, reviewed mechanical/electrical packages, reviewed power system study. MV switchgear and MCC in this project were Arc resistant.

Exxon Mobile Tapis EOR and rejuvenation project, GAP analysis, prepared Gap report and MPDS (Malaysian Project Design System) for power system basis, AC UPS system, Essential service and instrumentation power supply, Heat tracing, Protection of electrical equipment in petrochemical environment,

Exxon Mobile Guntong E air utility upgrade project (AFS 019), leaded electrical team to preparing electrical scope of work, updating construction scope of work, preparing project deliverable and time schedule, preparing MTO, MR and TBE for electrical items.

Exxon Mobile Guntong D fuel gas superheater upgrade project, Leaded Electrical team to prepare project deliverable and time schedule, participated to pre FEED study, prepared power system study, established load study, prepared constructability study.

Exxon Mobile Jerneh helicopter refuelling system project (AFS003), Leaded Electrical team prepared project deliverable and time schedule, leaded electrical team to updating electrical drawings showing scope of work, preparing electrical scope of work, updating construction scope of work, preparing MTO, MR and TBE for electrical items.

Exxon Mobile Guntong E buttlist project (AFS017), leaded electrical team to preparing construction scope of work, input to MDR, document deliverable and time schedule.

Senior Electrical Engineer / Acting Lead – WorleyParsons, kuala lumpur, Malaysia

Zakum water injection capacity upgrade ADMA/OPCO, verified and reviewed feed package including specifications, single line, calculation and prepared related reports.

Major equipments in this project were: 11 kV switchgears and MCC, 3.45kV switchgears and MCC, 415V MCC, 11/0.43kV transformers and 11/3.3kV transformers.

Senior Electrical Engineer / Lead Deputy – Ranhill WorleyParsons, kuala lumpur, Malaysia

South pars offshore projects phase 17&18 – being involved in Feed and detail design, prepared document list, prepared specifications and data sheets for electrical equipment (LV motors, UPS, diesel generator, power cable, package system, earthing, MCC and switchgear). Prepared logic diagram and schematic drawings. Prepared lighting calculation with Chalmit software. Prepared cable sizing calculation. Prepared inspection data sheet for DG, UPS, switchgear, battery and navigational aids. Established power system study with EDSA including short circuit, load flow and big motor starting study. Carried out relay coordination study with EDSA and prepare relay setting table. Prepared procurement documents for electrical system, investigation vendor proposal, vendor clarification. Carried out load study diesel generator sizing. Vendor clarification and data investigation for switchgear, diesel generator, UPS, navigational aids. Vendor data investigation for mechanical package include MEG, Air compressor, sanitary package, chemical package, methanol injection package, LDHI package and other mechanical package.

Senior Electrical Engineer – WorleyParsons, kuala lumpur, Malaysia

Kumang offshore project- participate to reviewed complete electrical FEED package such as single line, panel arrangement, cable calculation and roots, navigational aids, earthing and lighting layout, schematics and control diagrams, generator sizing, specifications and data sheets.

2007 - 2008

Lead Electrical Engineer – PIRE Co, Tehran, Iran

Reshadat offshore Project – This project located in the Persian Gulf comprise a satellite wellhead platform, a drilling platform renovation, a flare platform and a living quarter platform. Total power consumption 15MVA had been estimated for this project that supplied by four (three in service and one standby) 6.1MW, 6.6kV GTG and dispatched to medium voltage motors by MV switchgear via 6.6kV submarine cables and low voltage users via 6.6/0.4kV transformers and low voltage MCC/switchgear. I had been involved as a lead of 6 people team and as long as I had been there whole feed dossier had been endorsed and some documents such as load list, single line for MV and LV switchgears and UPS’s, DG sizing and some specifications and data sheets were issued. Also close cooperation with other disciplines for GTG sizing, Living Quarter layout were established.

Lead Electrical Engineer – PIRE Co, Tehran, Iran

HIPS Project, Tabriz petrochemical complex – Proceeded procurement of switchgears and well established close relation with construction team, carried out FAT for medium and low voltage switchgear, lighting fixtures and variable speed drives.

2006-2007

Electrical Engineer – BIDEC, Tehran, Iran

KHARG NGL Project – Involved in basic endorsement, prepared earthing, lighting and cabling layout and single line diagrams.

Electrical Engineer – BIDEC, Tehran, Iran

BINAK desalting Project – Prepared documents related to medium and low voltage switchgears and motor control centre as single lines, data sheets, typical schematic diagrams, logic diagrams and requisition documents. Developed load list and established related calculation such as transformer sizing. Managed clarification and vendor meeting related to switchgears

Electrical Engineer – BIDEC, Tehran, Iran

Coordinated vendor meeting and clarification for some packages such as seal gas compressor, purge gas compressor, cooling tower, water treatment and briquette machine. Carried out system study by ETAP soft ware. Prepared single line diagram for power centre and motor control centre. Carried out clarification and managed vendor meeting related to switchgear in the following steel projects:

* Steel making plant, Hormozgan steel complex

* Direct reduction plant, Khorasan steel complex

* Roller plant, Charmahal steel complex

2004 – 2006

Electrical Engineer – EIED, Tehran, Iran

Siri Island gas recovery and NGL plant – This project located in the Siri Island in Persian Gulf. Power system comprised of 4x10MW, 6.6kV GTG and One 1.3MW, 6.6kV emergency diesel generator which fed medium voltage motors and low voltage consumers through 6.6/0.4kV transformers. I had involved as an engineer and did following activity: Prepared Load list and established related calculation such as transformer sizing, diesel generator sizing and gas turbine generator sizing. Prepared overall, medium and low voltage single line. Performed control and protection schematics diagram. Prepared UPS calculation, data sheet and single lines. Carried out power system studies with ETAP software. Managed clarification and technical meeting and established technical bid evaluation for switchgears, earthing materials and UPS.

Electrical Engineer – EIED, Tehran, Iran

HDPE project, Ilam petrochemical complex – Performed lighting calculations. Established Lighting layouts. Reviewed MV and LV vendor proposals and prepared technical bid evaluation.

2004 - 2005

Electrical Engineer – ARYA TAVAN, Tehran, Iran (Part time)

HAFTSHAHIDAN desalting plant – Prepared medium and low voltage single line diagram. Prepared earthing calculation and related layouts. Prepared datasheet and requisition documents for medium voltage switchgear.

2003 - 2004

Electrical Engineer – ADIB SANAT, Tehran, Iran (Part time)

IGAT 4 gas compressor station Project – Prepared medium and low voltage single line diagram. Prepared earthing and lighting calculation and related layouts. Prepared cable calculation and cable layout. Prepared data sheet for medium and low voltage switchgear.

2002 - 2003

Electrical Engineer – FARAB, Tehran, Iran (Part time)

KOOHRANG Project, Hydro power generation plant – Prepared medium and low voltage single line diagram. Performed load list and carried out related calculation such as transformer sizing- Prepared cable list.

Electrical Engineer – FARAB, Tehran, Iran (Part time)

KARUN III Project, Hydro power plant– Prepared cable connection diagram. Carried out FAT for low voltage and medium voltage switchgear. Modified and finalized schematics diagrams.

2003 - 2004

Electrical Engineer – FULMEN, Tehran, Iran

Prepared control, protection, SCADA and inter trip for following plants:

* 132/20Kv Pars special energy economic zone substation

* 400/230/132/63Kv GAYATI substation

* 63/20Kv HORMOZGAN substation

2000 - 2003

Electrical Engineer – MOSHANIR, Tehran, Iran

Prepared tender and contract documents for purchasing accessories and towers and insulator and full construction and also established mechanical and electrical calculation such as sag-tension schedule, wiring schedule, spotting layouts, leg schedule for the following projects:

* MINAB-BASHAGARD-JASK 230kV transmission Line

* GAVBANDI-LAMERD 132kV Transmission Line

* FARSAN-KOOHRANG 63kV Transmission Line

* BUIN-FREIDOONSHAHR 63kV Transmission Line

Education

BS, Electrical Engineering, Isfahan University of Technology at Isfahan, Iran, 1999

MS, Electrical Engineering, Mazandaran University at Babol, Iran, 2002

Specific Technical Expertise/Specialist Courses

Excellent working knowledge about EDSA, SKM(PTW32), ETAP, CYME, NEPLAN, CALCULUX and Chalmite

ISO 9001; BOSET-R training



Contact this candidate