JOHN S. DUNCAN PRESENTATION OF
QUALIFICATIONS
W*70 N5465 Ridgewood Drive Menomonee Falls, WI 53051 Telephone
262-***-**** Cellular 262-***-**** E-Mail
ab7p6o@r.postjobfree.com
SUMMARY Thirty years experience in project management, estimating,
planning, scheduling, administration, real estate development,
design build, and marketing in the construction and development
field. The last twelve years focused in the healthcare industry,
with facilities located on hospital campuses.
Excellent analytical abilities.
Extensive experience in multi and distressed project management.
Unique ability to develop and manage a strong team work
atmosphere.
Software: Primavera, and Timberline Accounting, and Windows based
software.
PROFESSIONAL EXPERIENCE (Past Twenty-eight years)
February 2001 LANDMARK HEALTHCARE FACILITIES, Milwaukee, WI (Design
Build, Owner, & Property Management Co)
To Present Senior Vice President of Project Management and Construction
. Responsible for all construction teams and projects throughout
the United States (Average of five to fifteen design build
projects ranging from $10 to $75 million, and the final back
fill of tenants until 95 percent occupancy). Including startup
of the projects thorough project closeout and turnover to
property management.
. Managed and coordinated resources required form the site plan
approval process through issuing of the building permit.
Liaison between city municipalities, hospital, architect,
contractor, and developer.
. Developing a role as a resource to project teams and providing
assistance when required such as team building, quality
control, project schedule, cost management, and architectural
management.
. Interview and select architects and General Contractor for all
design, design/build, and construction projects.
. Oversee and approve the final negotiations of contracts and
change orders with the architect and contractors.
. Manage Architects and Engineers in the design of core and shell
building and coordinate Program, Design Development, and
Construction Documents for site layout, core and shell, and all
tenant suites.
. Negotiate construction costs with tenants offering suggestions
for value engineering to reduce amounts over tenant suite
square-foot allowances.
. Responsible for writing and updating all pre-construction and
construction procedures and processes.
. Bottom-line responsible for all construction profit margin,
overruns, and exposure control.
. Responsible for writing and updating all construction
specifications, architectural and construction contracts.
. Participate in marketing presentations for proposal request
representing the construction and design proportion of the
presentation.
. Coordinate and manage all construction budgets, buyouts, and
construction contracts.
. Responsible for coordination of project sustainability,
commissioning, and design for LEED projects.
February 1998 BOVIS LEND LEASE, Atlanta, GA
to February 2001 Senior Project Manager
. Employed to manage retail and mixed-use projects in Florida
for the BLL Atlanta office- based clients.
. Responsible for reviewing Retail, Entertainment, and
Education Owner Contracts and requirements with Corporate
Council to determine which items needed to be negotiated or
re-written.
. Prepared three claims against subcontractor bonding
companies (claims valued over $2.5 million each). At the end
of each settlement the project profit increased over the
project start-up profit projections.
. Grand Lakes Resort, Orlando, Florida
. Setup and managed project team for the pre-construction of
Ritz-Carlton Hotel, Marriott Hotel, and a Greg Norman Golf
Course. Including two Convention Centers and a Resort Spa.
. Selected and managed BLL project team averaging between
fifty and seventy employees. Including setting up teams to
analyze development drawings for preliminary pricing.
. Liaison with Owner Representative, Architect, and Engineers
for incorporating value engineering and practical design
into the construction documents.
. Team leader to review all preliminary budgets pricing with
the Owner Representative and Architect.
. Pentagon Row, Arlington, Virginia
. Mixed-use project Federal Realty for retail, entertainment,
office suites, and Post Property residential apartments and
two levels of underground parking.
. BLL was contracted to takeover after the previous
contractor failed to meet the scheduled commitments of the
contract. At the time of the project takeover, the
underground parking garages were 70% complete and only 10%
of the remaining sub-contracts were written.
. Responsible for taking control of the project team
including BLL staff, Subcontractors, Architect, and
Engineers; established a recover schedule and prepared a
plan to reduce construction cost.
JOHN S. DUNCAN
PRESENTATION OF QUALIFICATIONS
August 1992 EMJ CORPORATION, Chattanooga, Tennessee
to February 1998 Project Manager (Mall Division)
. Responsible for overall management and contract administration
of multiple retail projects,
valued from $5 million to over $56 million.
. Simultaneously managed up to 8 projects, encompassed
preparation of all bid submittals, interpreted complex
specifications, negotiated with subcontractors, and total
contract enforcement and administration.
. Directed activities of all Project Management, Field
Supervisors, and over 30 subcontractors per Strip Centers and
Free Standing project. On Mall projects, managed up to six
Major Anchor tenants and up to 120 small shop tenant
contractors and their subcontractors.
. Liaison with Contractors, Architects, Owners, and Field
Personnel.
. Controlled details of all contract agreements, project status,
labor and material schedules to ensure compliance and to avoid
construction delays and cost overrides.
. Crisis Manager: Specialized in the take-over of distressed
projects. Primary goals were to analyze problems, determine
problem area and manner in which to maximize profits and
minimize losses.
. Authorized to negotiate all settlements.
April 1991 to GENERAL DYNAMICS SERVICE COMPANY, Cairo, Egypt
August 1992 Senior Project Planner/Estimating Engineer
M1A1 Tank Manufacturing Plant, U.S./Egyptian Government, $3.5
Billion project. Contracted
with the objective of developing actual estimation plans and
budgets to avoid loss of contract.
. Directly responsible for development of all support
documentation for $185 million contract encompassing
complete electrical, water, gas, and air systems of the
manufacturing facility.
. Completely designed, wrote, and implemented data base for
estimating software.
. Organized total facility plan; established effective systems to
determine specific needs and develop support
documentation in all contracted areas.
. Developed financial and administrative proposals in both U.S.
dollars and Egyptian pounds.
. Interfaced and negotiated with manpower and material
subcontractors to calculate total production time and
material, established accurate costs, schedules, and completion
dates, and reduce contract expenses.
. Handled complete estimation for installation of Ingersoles.
. Coordinated scheduling of production line equipment with
Primavera software. Extensive use of Excel,
Microsoft Word, Power Tools, AutoCAD, and other software.
. Successfully completed projected five-year estimating project
within 16 months.
January 1985 DIXIE CONSTRUCTION COMPANY for BEERS/HOLDER & RUSSELL,
Atlanta, Georgia
to April 1991 Senior Site/Structural Engineer
One Ninety One Peachtree Tower, 54-storey office building, and
One Peachtree Center, 81-storey office building. Directly
responsible the coordination of exterior stone, storefront, and
glazing
. Analyzed problems for structural concrete and steel for exterior
stone masons and iron workers to ensure optimum
production.
. Oversaw Quality Control Engineering Group; extensive problem
identification resolution.
. Supervised exterior layout; analyzed blueprints and implemented
adjustments to avoid construction delays.
EDUCATION TENNESSEE TECHNOLOGICAL UNIVERSITY, Cookeville,
Tennessee
Bachelor of Science, Building Science & Construction
Management
NASHVILLE STATE TECHNICAL INSTITUTE, Nashville, Tennessee
Associates Degree, Architectural Engineering
.
AWARDS Received Scenic Cities Beautiful Commission Award
ABC Certificate of Commendation for Excellence in
Construction Oak Hollow Mall
MEMBERSHIPS International Council of Shopping Centers (ICSC)
Construction Specification Institute (CSI)
Project Management Professional (PMP)
LICENSES General Contractor State of Florida
General Contractor State of Kentucky
General Contractor State of Tennessee
JOHN S. DUNCAN
PROJECT LIST
Hotel, Condominium, and Apartments
Grand Lakes Resort (Pre-construction) Orlando, FL
$ 325 Million
Music City Sheraton Nashville TN $
120 Million
Lyman Homes Marietta GA $ 1.3
Million
Fort Hills Homes Marietta GA $ 1.1
Million
Belleview Estates Nashville TN $
3.4 Million
Pentagon Row (Post Apartments) Arlington VA
$54.2 Million
Education
Palmetto High School Bradenton FL
$23.6 Million
Durant High School Tampa FL $29.4
Million
Industrial
M1A1 Tank Manufacturing Plant Cairo Egypt
$ 3.5 Billion
Commercial High Rise
191 Peachtree Center (54 story) Atlanta GA
$325 Million
One Peachtree Center (68 story) Atlanta GA
$480 Million
Parking Structures
Convention Center Parking Deck Nashville TN
$10.4 Million
Glendale Hospital Parking Structure Glendale, CA
$ 6.2 Million
Avenues Mall Parking Deck Jacksonville FL
$ 6.3 Million
Mississippi Baptist Parking Structure Jackson, MS
$10.8 Million
U of I MOB Parking Structure Indianapolis, IN
$11.3 Million
St. Vincent Parking Structure Erie, PA
$10.5 Million
Mt. Sinai Parking Structure South Beach, FL
$ 9.8 Million
Colombia Med. Ctr. Parking Structure Hudson, NY
$ 6.9 Million
Highline Parking Structure Burien, WA $
3.2 Million
Mixed Use
Pentagon Row (Project takeover) Arlington, VA
$151 Million
Health Care
Lake Mead Medical Office Building Las Vegas, NV
$15.7 Million Total Project
. Core & Shell 70,000 SF $ 8.4
Million
. Tenant Construction $ 7.3
Million
. Radiation Cancer Treatment
. (1) Linac Vault
. 54,000 Physician Offices
Chula Medical Plaza Chula Vista, CA $16.5
Million Total Project
. Core & Shell 80,000 SF $ 8.4
Million
. Tenant Construction $ 8.1
Million
. Sharp Out Patient Surgery
. Sharp Imaging Ctr.
. 54,000 Physician Offices
Health Care (Continued)
Glendale Medical Plaza Glendale, CA
$23.9 Million Total Project
. Core & Shell 82,000 SF $ 9.6
Million
. Tenant Construction $ 8.1
Million
. Cancer Radiation Ctr.
. Imaging Ctr.
. 48,000 Physician Offices
. 445 Stall Parking Structure $
6.2 Million
St. James Physicians Office Building Olympia Fields, IL
$19.8 Million Total Project
. Core & Shell 80,000 SF $11.4
Million
. Tenant Construction $ 8.1
Million
. 48,000 Physician Offices
. (1) Ground Connector $280
Thousand
St. James Heart & Vascular Institute Olympia Fields, IL
$13.4 Million Total Project
. Core & Shell 65,000 SF $ 8
Million
. Tenant Construction $
5.4Million
. Cath Lab
. Rehabilitation Ctr.
. 44,000 Physician Offices
. (1) Ground Connector & (1) Connector Bridge
$960 Thousand
.
St. James Cancer Institute Olympia Fields, IL
$11.3 Million Total Project
. Core & Shell 43,000 SF $ 5.2
Million
. Tenant Construction $ 6.1
Million
. Cancer Radiation Ctr.
. 2 Linac Vaults
. 15,000 SF Cancer Infusion
. (1) Ground Connector $310
Thousand
Summa Centers of Excellence Akron, OH
$37.3 Million Total Project
. Core & Shell 163,000 SF
$20.4 Million
. Tenant Construction $14.6
Million
. Cardiac Diagnostic Ctr.
. Cath Lab
. Imaging Ctr.
. Cardiac Rehabilitation Ctr.
. Ambulatory Surgery Ctr.
. In-Vitro Laboratory
. Women's Ctr.
. 68,000 Physician Services
. (1) Connector Bridge $2.3
Million
Yakima Memorial MOB Yakima, WI $9.4 Million
Total Project
. Core & Shell 45,000 SF $ 6
Million
. Tenant Construction $3.4
Million
. 45,000 Physician Services
. Cardiac Center
. Sleep Disorder Ctr.
Health Care (Continued)
Highline MOB Burien, WI $20.9
Million Total Project
. Core & Shell 72,900 SF $10.2
Million
. Tenant Construction $ 6.6
Million
. 32,500 Physician Services
. (1) Linac Vaults
. Cancer Infusion Ctr.
. Imaging Ctr.
. Sleep Disorder Ctr.
. Connector Bridge $490 Thousand
. 280 Stall Parking Structure $
3.7 Million
Rochester Health & Wellness Ctr. Rochester Hills, MI
$20.5 Million Total Project
. Core & Shell 102,200 SF $
12 Million
. Tenant Construction $ 8.5
Million
. Orthopedic & Spine Ctr.
. Pain Management Ctr.
. Rehabilitation Ctr.
. Imaging Ctr.
. Fitness Ctr.
. 15,000 SF Physician Services
Troy MOB Troy, MI $18.6 Million
Total Project
. Core & Shell 105,130 SF $
11 Million
. Tenant Construction $ 7.6
Million
. 56,830 Physician Services
. Cancer Infusion Ctr.
. Retail Pharmacy
. Women's Specialty Ctr.
. Branch Bank
Mt. Sinai MOB South Beach, FL $38.5
Million Total Project
. Core & Shell 103,728 SF
$16.2 Million
. Tenant Construction $10.1
Million
. 103,000 Physician Services
. Coffee Shop
. Connector Bridge $ 2.4 Million
. 630 Stall Parking Structure $
9.8 Million
Raritan Bay Medial Ctr. Old Bridge, NJ
$27.4 Million Total Project
. Core & Shell 100,000 SF
$12.6 Million
. Tenant Construction $ 14
Million
. 40,000 Physician Services
. Ambulatory Surgery Ctr.
. Imaging Ctr.
. 16,000 Hospital Surgical Services.
. Endoscopy Ctr.
. Connector Bridge $840 Thousand
Health Care (Continued)
Riverside Medical Ctr. New Port News, VI
$23.6 Million Total Project
. Core & Shell 103,747 SF
$12.4 Million
. Tenant Construction $ 6.6
Million
. 65,000 Physician Services
. Pulmonary Rehabilitation Ctr.
St. Vincent MOB Erie, PA $30.7 Million
Total Project
. Core & Shell 92,182 SF $
11Million
. Tenant Construction $ 9.2
Million
. 48,800 Physician Services
. Cardiac Diagnostic Ctr.
. Physical Therapy Ctr.
. Fitness Ctr.
. Dentist Practice
. 840 Stall Parking Garage
$10.5 Million
Mercy MOB Portland, MA $15.6
Million Total Project
. Core & Shell 82,229 SF $ 9
Million
. Tenant Construction $ 6.6
Million
. 37,500 Physician Services
. Foot and Ankle Ctr.
. Oncology Ctr.
. Urology Ctr.
Oroville MOB Oroville, CA
$10.3Million Total Project
. Core & Shell 58,964 SF $5.6
Million
. Tenant Construction $4.7
Million
. 36,400 Physician Services
. Imaging Ctr.
. Cancer Infusion Ctr.
. Urgent Care Ctr.
Our Lady of Lourdes MOB Lafayette, LA
$22.6 Million Total Project
. Core & Shell 113,010 SF
$12.4 Million
. Tenant Construction $10.2
Million
. 56,400 Physician Services
. Cancer Radiation Ctr.
. (1) Linac Vaults
. Cancer Infusion Ctr.
. Imaging Ctr.
. Wound Care Ctr.
Jersey City MOB Jersey City, NJ
$19.2 Million Total Project
. Core & Shell 75,198 SF $ 12
Million
. Tenant Construction $ 7.2
Million
. 32,700 Physician Services
. Ambulatory Surgery Ctr.
. Dentist Practice
. Imaging Ctr.
. Senior Health Ctr.
Health Care (Continued)
Columbia MOB Hudson, NY $24.9
Million Total Project
. Core & Shell 71,201 SF $ 11
Million
. Tenant Construction $ 5.7
Million
. 32,700 Physician Services
. Imaging and Diagnostic Ctr.
. Imaging Ctr.
. Connector Bridge and Tunnel. $ 1.3
Million
. 420 Stall Parking Structure $
6.9 Million
Mississippi Baptist MOB Jackson, MS
$54.4 Million Total Project
. Core & Shell 177,071 SF
$29.4 Million
. Tenant Construction $14.2
Million
. 70,369 Physician Services
. Cardiac Ctr.
. Imaging Ctr.
. Urgent Care Ctr.
. Endoscopy Ctr.
. 760 Stall Parking Structure
$10.8 Million
. (2) Connector Bridges
. LEED Silver Project
U of L MOB Louisville, KY $39.3 Million
Total Project
. Core & Shell 189,085 SF
$20.7 Million
. Tenant Construction $17.9
Million
. 94,300 Physician Services
. U of L School of Dentistry
. Imaging Ctr.
. Urgent Care Ctr.
. Endoscopy Ctr.
. In-Vitro Laboratory
. Retail Pharmacy
. Women's Ctr.
. Calistoga Restaurant
. (1) Connector Bridges $740
Thousand
U of I Neuroscience Ctr. Indianapolis, In
$74.1 Million Total Project
. Core & Shell 268,302 SF
$34.1 Million
. Tenant Construction $26.8
Million
. 32,000 SF Neurosurgery Ctr.
. 19,500 SF Neurology Imaging Ctr.
. 31,500 SF Research Imaging Ctr.
. 10,800 Physical Rehabilitation Ctr.
. 41,000 Clinical Neurology Ctr.
. 12,500 Human Performance Laboratory
. 906 Stall Parking Structure
$11.3 Million
. (1) Connector Bridge
. LEED Gold Project $ 1.9
Million
Health Care (Continued)
U of F MOB Jacksonville, FL $51.4 Million
. Core & Shell 180,000 SF
$25.2 Million
. 76 Acre Site Development $
6.5 Million
. Tenant Construction $19.7
Million
. 80,000 SF Physician Services
. 25,000 SF Outpatient Surgery Ctr.
. 25,000 SF Inpatient Surgery Platform
. 12,000 SF Urgent Care Ctr.
. 15,000 SF Diagnostic Ctr.
. 8,000 SF Emergency Department
Entertainment
Gwazi Roller Coaster Bush Gardens Tampa, FL $
5.4 Million
Muvico Theater Paradise 24 Ft. Lauderdale, FL
$17.5 Million
Muvico Theater Pompano 18 Pompano Beach, FL
$14.1 Million
Muvico Theaters at The Point Orlando, FL
$15.6 Million
Muvico Theaters Hialeah Hialeah, FL $
1.8 Million
Carmike Cinemas 20 Bradenton, FL
$11.2 Million
Regal Cinemas 14 Spartanburg, SC $ 4.6
Million
Retail
Arbor Place Mall Atlanta, GA $
56 Million
Bonita Lakes Mall Monroe, MS $ 29
Million
Brookdale Center Mall Minneapolis, MN $ 43
Million
Foothills Mall Maryville, TN $
2.2 Million
Miromar Factory Outlet Mall Ft. Myers, FL
$14.8 Million
Prime Factory Outlet Mall Williamsburg, VA $ 4.4
Million
Prime Factory Outlet Mall Kenosha, WI $
9.8 Million
Baptist Book Store Chattanooga, TN $ 1.1
Million
Lowes OKC, OK $ 5.6 Million
Lowes Jackson, TN $ 5.1
Million
Michael Knoxville, TN $ 1.1
Million
Suburban Plaza Knoxville, TN $
3.4 Million
Goodys Maryville, TN $ 1.3
Million
Home Place Knoxville, TN $ 3.3
Million
Baby Super Store Knoxville, TN $ 2.8
Million
Westgate Mall Spartanburg, SC $ 26
Million
Lowes Corinth, MS $ 6.6
Million
PetsMart Chattanooga, TN $ 1.5
Million
Just For Feet Chattanooga, TN $ 1.3
Million
Media Play (site work) Chattanooga, TN $ 1.1
Million
Oak Hollow Mall High Point, NC $ 29
Million
Super K-Mart Greensboro, NC $
6.2 Million
Goodys High Point, NC $ 4.5
Million
Belk-Beck High Point, NC $ 6.6
Million
JC Penney High Point, NC $ 7.1
Million
Hannaford Grocery High Point, NC $
430 Thousand
(site work)
Brake-O Atlanta, GA $ 850
Thousand
Omega Tire (Harding Place) Nashville, TN $
940 Thousand
Omega Tire (Rivergate) Nashville, TN $
980 Thousand
Retail (Continued
Riverdale Shopping Center Atlanta, GA $
6.7 Million
Lowes Benton Harbor, MI $
5.5 Million
Avenues Mall Parking Deck Jacksonville, FL $ 6.3
Million
Lowes Gainesville, GA $ 5.4
Million
Walmart (site work) Gainesville, GA $
1.2 Million
Lakeshore Crossing Gainesville, GA $
1.1 Million
Food Lion Fairfax, VA $ 6.6
Million
Food Lion Stevensville, MD $ 5.8
Million
Restaurants & Food Service
Calistoga Louisville, KY $ 1.8
Million
Miss Winters Nashville, TN $
1.6 Million
Keifer's Jackson, MS $ 1.5
Million
Einstein Brothers Bagels Indianapolis IN
$ 1.1 Million
Einstein Brothers Bagels Jackson, MS
$ 1.3 Million
Manship Jackson, MS $ 1.2
Million
Mille D's Yogurt Jackson, MS $ 462
Thousand