Post Job Free

Resume

Sign in

Engineer Engineering

Location:
Winder, GA
Posted:
September 14, 2013

Contact this candidate

Resume:

STEVE HARRISON, P.E.

NATIONALITY – USA

P.O. Box 50 Hobart, OK 73651 405-***-**** ab7mtu@r.postjobfree.com

PET. ENGINEER – DRILLING / COMPLETIONS / RESERVOIR / WORK-OVER

On Time, Within Budget Delivery Optimized Profitability

Dynamic, highly experienced leader with broad, in-depth history of increasing organizational profitability

by overseeing all aspects of complex, multi-million dollar projects / operations and producing highest

quality deliverables on time and within budget. Hands-on, proactive leader with expertise at driving

dedicated focused teams to consistently meet all project milestones. Honest, straightforward professional

with strong communication, interpersonal, and negotiation skills; proven ability to develop solid

relationships with customers, vendors, and regulatory agencies. Experience includes both domestic and

international multi-site supervision for drilling as well as mud engineering. Profit-focused strategist with big

picture focus; strong financial management talents include forecasting, economic analysis, budget

management and cost reduction.

Awards, Recognition & Registration

World Footage Drilling Record (Diamond Insert Bit) Hughes Christensen - 1999

Rig Footage Record for Company Rig Patterson Drilling - 2001

Professional Engineer Registration - State of Oklahoma - 1982

Membership Award U.S. Gas Standard Codes Board – 2002

Areas of Expertise

Drilling Engineering Mud Engineering Contract Negotiations AFEs DVD Curves & Forecasts

Budgets & Cost Planning Prognosis Composition, Review, and Implementation Project / Well

Planning Natural Gas Compression Reservoir Analysis Casing Design Drilling / Completions

Hole Cleaning Team Supervision Work-Overs - Vertical, Directional, Horizontal Under-balanced

& MCD Drilling Well Site Supervision Miscible Floods (Water, Nitrogen, CO ) Geo-Steering

2

Extended Reach Design Rotary Steering Log (Mud, Electric) Analysis Salt Water & Toxic Waste

Disposal HSE Heavy Oil Production H S Safety Training Hydraulic Fracturing Regulatory

2

Compliance Cementing Hydraulic Fracturing Horizontal Completions Offshore Drilling Rig

Construction/System Commissioning

Technical Proficiencies

Well monitoring software for real-time monitoring of drilling operations: DrillPro – 30, MD Totco Rig

Monitor, Pason Rig Monitor, Epoch Rig Monitor, Peleton Well View, PERC, DIMS, Open Wells

Reservoir Engineering: Bengal, Landmark, PhD Win, Aries

Mud Engineering Software: Mud Mod – 2000, Landmark – NL Baroid – Baker Hughes, Inc.

General Software: MS Office Suite, Business Plan Pro, Quick Books, MS Dos, Lotus

PROFESSIONAL SYNOPSIS (Detailed Specs Available Upon Request)

HARRISON & SONS ENTERPRISES, LLC. Hobart, OK

Independent petroleum engineering consulting company

Consulting Petroleum Engineer 1982 to Present

Manage and complete broad range of petroleum engineering projects for customers spanning a range of

industries; consistently produce highest quality deliverables on time and within budget. Key projects /

clients include:

OCS Group – For Harrison & Sons Enterprises, LLC (2012 – Present)

Consulting Drilling/Mud Engineer - @ Shanghai Waigaoqiao Shipbuilding Co., LTD Yard -

in Shanghai, China.

Supervise daily design operations for new construction of Jack Up drilling rig. The primary

function of this job is supervision of designing/engineering of entire, on board drilling mud system

for new jack up rig w/75’ cantilever being built by Shanghai Waigaoqiao Shipbuilding Co., LTD for

Prospector Drilling Co. Daily responsibilities include review & critique of drawings & change

orders submitted by SWS shipbuilding engineers to ensure all parameters of owner’s construction

requirements & specifications are met. Rig is being built to meet all North Sea requirements &

standardizations.

Williams Companies - For Harrison & Sons Enterprises, LLC (2011 – 2012): Working as an On

Site Drilling Consultant/Engineer in North Dakota.

Wells here are drilled horizontally into the Bakken Shale with up to 10,000' laterals. Multi lateral

wells are sometimes drilled from the same location by skidding the rig up to 30'. Upper portions of

hole are drilled with water based fluids while curves and laterals are sometimes drilled with loose

emulsion oil mud. Second laterals are only drilled if sufficient lease hold acreage is available. I

supervised daily drilling operations as well as daily mud engineering operations.

Atlas Energy, Inc. - For Consolidated Production, Inc. (2010 -2011): Work as on site Drilling

consultant in SW Pennsylvania.

Wells were drilled into Marcellus shale with up to 4,000 ft laterals. There were always 3-4 wells

drilled on each pad with continuous anti collision monitoring required with each subsequent well

drilled after completing initial well on each location. Upper portion of hole was drilled with air as

the transportation medium & changing to mineral oil formulated oil based drilling fluid for the

drilling of the curve & lateral of each well. I supervised daily drilling operations as well as mud

operations for the lower portion of the holes.

Exxon/Mobile, Mansfield, LA - For Elliston Consultants, Inc. (2009 to 2010): As completion

foreman, oversaw daily hydraulic fracturing operations for Haynesville Shale Horizontal wells

that produce ~$12M in product / year. Also preformed all aspects of well-readiness preparation

such as TCP perforations, as well as Halliburton Frac Plugs & Wildcat Wireline perforation guns.

Wildcat also performed bond logs before each frac.

Encana Oil & Gas (USA) Inc., South Texas - For T & S Petroleum Consultants, Inc. (2008 to

2009): As Senior Drilling / Completions / Reservoir Engineer for South Texas & SE New Mexico

properties, provided leadership to 32 personnel working drilling and completion operations on

300,000+ acres of leasehold interest that produce ~$4M in product / year. Duties included

prognosis assimilation for drilling procedures, casing design, drilling mud programs, electric

wireline operations, and field personnel supervision.

Plains Exploration & Production Company, Houston, TX - For EPI Consultants, Inc. (2005 to

2008):

As Senior Work-over / Reservoir Engineer for South Texas Acquisitions, led staff of 22 that

reworked over 350 wells after acquisition from outside operating company. Introduced CO floods 2

in 3 fields. Authored all work over prognosis for drilling, tubular requirements and mud

engineering. Increased total production to $10M / year.

Petrohawk Energy, Tulsa, OK - For Plaster & Wald Consulting - (2004 - 2005)

Worked in Petrohawk's Tulsa office as a drilling engineer, responsible for drilling prognosis

including rig selection, prognosis generation, including mud, mud logging, and casing &

cementing, wire line, engaged in drilling primarily Cotton Valley wells in the area directly NE of

Shreveport, LA, supervising 25-35 personnel. All wells were vertical and usually drilled in 9-13

days. I usually looked after 3 different drilling rigs in the same general area and supervised daily

drilling operations Drilling cost usually ran from $950.000.00 to $1.4M.

XTO Production - For EPI Consultants - For EPI Consulting, Inc. - (2002 - 2004)

Worked as a well site consultant drilling Atoka wells in SE Oklahoma, supervising from 7 to 20

personnel, daily drilling, casing running, cementing, and mud engineering. Surface holes were

drilled with air and production hole was mudded up as conditions, (primarily water flows) dictated.

Drilled 9 wells during this interval of time all in SE OK w/overall drilling & completions cost at over

$2.3M.

Conoco / Phillips, Powder River Basin of Wyoming & Pearsall Shale Section of South Texas)

- For EPI Consultants (2001 to 2002): Oversaw staff of 18; handled engineering and well-site

drilling supervision/engineering of several drilling rigs. Drilled total of 13 wells with per-well

drilling/completions cost at over $3M. Responsibilities included daily drilling operations, reporting,

supervision of casing, cementing and mud operations

Striker Petroleum, LLC, Dallas, TX - For Harrison & Sons Enterprises, LLC (1999 to 2001): As

VP of E&P and Senior Petroleum/Reservoir Enginee r in Sooner Trend, Texas Panhandle & SE

Alabama producing Mississippi, Oswego, Morrow Shale, Selma Caulk, and Hunton formations,

directed team of 21; oversaw daily operations including drilling, completions, hydraulic fracturing,

mud and work-over engineering of over 185,000 acres of leasehold interest for both pumping oil

wells and flowing gas reserves. Alabama production was enhanced with miscible CO flooding 2

procedures. Project valued at $165M.

Transion Oil & Gas, SA, Politest, Romania - For Harrison & Sons Enterprises, LLC (1997 to

1999): As Senior Petroleum / Reservoir Engineer / Operations Manager, directed local operations

for flowing gas wells, pumping wells, and heavy oil wells (8-10 gravity), some of which required

steam injection into reservoir. Gas wells were in Poptrain Sandstone which had up to 14 various

layers & required heavy attention to sand control measures. Overall project value: $22M

Cedar Hill Operating, Gadsden, AL / Syracuse, NY - For Harrison & Sons Enterprises, LLC

(1996 to 1997): As Senior Drilling / Completions Engineer provided leadership to 18-person team

in Selma Chalk areas as well as Heavy Oil Production in Southern AL; led production of heavy oil

with high asphalt-based consistency in the Selma Caulk formation, including drilling, completions,

CO miscible flooding, and daily production operations; also supervised work on natural flowing

2

gas wells that required directional geo-steering into specified seismic targets. New York

operations were initially in Trenton/Black River Formations. Overall project value: $52M

Cherokee Drilling/Operating, Inc., Charleston, WV - For Harrison & Sons Enterprises, LLC

(1994 to 1996): As Senior Drilling / Completions/Operations Engineer provided leadership to 18-

person team in Marcellus Shale areas as well as Trenton/Black River Formations; led production

of heavy oil with high asphalt-based consistency, including drilling, completions, and daily

production operations; also supervised work on natural flowing gas wells that required directional

geo-steering into pre-specified/selected seismic targets Overall project value: $52M

Harrison & Sons Water Well Service, Chickasha, OK - For Harrison & Sons Enterprises, LLC

(1992 to present): Oversee drilling and completion of commercial & domestic water wells in

Central Oklahoma; scope includes well drilling with my own water well drilling rig as well as pump

and water systems instillation. My involvement in this endeavor is suspended when I am involved

in any consulting activity for any oil & gas customer. There are personnel working for the

company that can operate the business in my absence.

Bonanza Oil Co., Inc. (1989 to 1993) served as SR Petroleum/Operations Engineer for Bonanza

Oil Co. in SW Oklahoma Granite Wash production and West Texas Bromides enhanced by CO 2

miscible flooding. Wells were low volume stripper wells and production was high gravity asphalt

based crude oil. Supervised 6 employees & 5-15 contract laborers for Bonanza Oil. Overall

project value: $250K to $2.5M annually.

International Well Fluids, Inc. - Bethany, OK (1981 to 1989) I was a 1/3 owner of this company

and served as President & Sr. Drilling Mud Engineer . Areas of operations were Anadarko Basin,

Arkoma Basin, TX & OK Panhandle, SW Colorado, & Williston Basin. The company specialized

in all types of drilling as well as completion fluids including oil based muds as well as water based

synthetic muds designed for deep hot holes. Also included in company services was drill pipe

corrosion service.

N.L. Baroid Petroleum Services - Canadian, TX (1976 to 1981) I worked as a Sales/Mud

Engineer in the TX & OK Panhandles, SW KS, & Western OK (Anadarko Basin). As a mud

engineer I ran all types of muds designed by Baroid including oil based muds, polymer muds, and

synthetic muds designed for deep, hot holes and severe lost circulation. Hole depths ranged up

to 25,000 ft. in the SW Anadarko basin of OK.

B.J. Hughes, Inc. - Perryton, TX (1973 - 1976) I worked as a field (Job) Supervisor on various

Cementing & Hydraulic Frac jobs performed by the company in TX & OK Panhandle and SW

Kansas.

Diamond Shamrock Corp. - Dumas & Perryton TX (1968 to 1973) I initially worked as an engine

record man recording daily natural gas compressor engineering reports as a monthly submission

to corporate offices. Later was transferred to the natural gas compressor overhaul crew as a 2nd

class mechanic and later was "bumped" per union rules to a "Switcher"/"Pumper" and transferred

to the field in Perryton, TX. There after 7 months, I was promoted to Production Foreman

responsible for 7 Switcher/Pumpers and all contract labor required for down-hole well

maintenance.

EDUCATION & PROFESSIONAL DEVELOPMENT

Drilling / Completion Fluids Engineering NL Baroid Petroleum Services - Houston, TX

Oil / Gas Well Cementing and Hydraulic Fracturing BJ Hughes, Inc. - Midland, TX

Horizontal Drilling Techniques School U.S. Department of Energy - Denver, CO

Cathodic Protection National Association of Corrosion Engineers - Denver, CO

AA – Agricultural Business Administration Cameron College - Lawton, OK

BS – Petroleum Engineering University of Oklahoma - Norman, OK

LICENSES & CERTIFICATIONS

BOP Certification Wild Well Control Engineering (Surface & Sub-Sea BOP Certification)

IWCF Drilling Supervisor/Work-over/Coil Tubing Certification (Wild Well Control Eng.)

Professional Engineer Registration State of Oklahoma

H S Certification Oiland, Inc. - Ponca City, OK

2

Water Well Driller License State of Oklahoma

IADC Membership Offshore Survival



Contact this candidate