Commissioning, specializing in the oil and gas industry. Controlling and
developing safe working strategies for projects under my control. I
have controlled the management of various areas within projects including:
-
. Hook-up & Commissioning of Brownfield Onshore Installations
. Shutdown Co-ordination
. Construction
. Certification
. Remote Engineering Liaison and on-site design support
I pride myself on being a safe and efficient team player, and developing
solutions to difficult engineering problems. I comfortably communicate at
all organisational levels and I pride myself on having the drive and
enthusiasm to ensure my work scopes are completed in accordance with the
plan.
Key Achievements
. Time served qualified electrician.
. Experienced supervisor.
. Project experience within petrochemical and refining industries.
. Proficient in planning workloads and monitoring progress.
. Experienced in producing detailed commissioning method statements.
. Continual use of initiative and innovation to solve problems, clear
obstacles and identify opportunities.
. Excellent interpersonal, verbal and written communication skills.
Qualifications & Courses Completed
. Electrical Engineering HNC.
. Electrical Engineering ONC.
. Step 5 PLC Course, Step 7 PLC Course
. IEE Regulations 16th edition.
. Curent Compex Ex 01-04 Certificate.
. Modern Apprenticeship Engineering. (EITB)
. SJIB Registered.
. Safety Passport.
. Offshore Survival/MIST & Medical
Employment Details
Woodgroup E&I Commissioning Engineer June 11 - Present
Shell Mossmorran/Braefoot Bay
Responsible for the delivery of Minor plant modifications, and Plant
rejuvenation projects, which are of a larger scale, typically system wide
change-outs of major plant / equipment. Responsible for Pre
Commissioning and Commissioning of all electrical systems associated with
gas production, 415V switchboards and associated protection devices,
110VAC & 24VDC UPS and trip chargers. Fully conversant with all forms of
process engineering documentation, including block diagrams, PFD's, P&ID's,
Data Sheets and Cause & Effect charts. Pre-commissioning/commissioning of
new installed plant Honeywell C300 DCS and Safety Manager in conjunction
with the vendor. Commissioning of Valves, Pumps and instruments. Marine
Offloading Facility and LNG Jetty modifications and
commissioning.Preparation of commissioning dossiers and work packs
required for the tasks. Complete all commissioning documentation for the
close out of the project. Shell permit to work system, ISSOW. Participating
in HAZID/HAZOP reviews and attending FAT. Leading Multi discipline teams
through main plant shutdown to achieve Project handover to Asset and
subsequent introduction of Hydrocarbons.
PSN/Woodgroup E C&I Commissioning Engineer
Conoco Phillips Viking Bravo (offshore) March 2011
Compression Optimisation Project. Raise and efficient completion of
Permits and all supporting documentation to ensure safe commissioning
tasks. Commissioning of new installed instrumentation from field to
Honeywell Dcs and Scada applications. Test all software changes which were
implemented to the Triconex safety systems. Commissioning of various
control valves within the scope of work. Complete all commissioning
documentation for the close out of the project.
Field System Design E&I Commissioning Engineer
New Build Waste to Energy Incinerator Plant April 2011-May 2011
Commissioning and Loop Testing of all on site instrumentation. Calibration
of pressure, temperature, flow and level instrumentation.
Babcock International Group Electrical Commissioning Engineer
Heysham Power Station. Aug 2010 to April 2011
Overseeing the installation of the E & I aspects of the Active Effluent
Treatment plant. Liasing with the mechanical and fabrication teams to
ensure a minimum of disruption and downtime. Testing and diagnosing faults
of various pneumatic and hydraulic systems and other instrumentation
systems. Inspection and commissioning of the completed system.
BAE Systems, Electrical Commissioning Engineer
June 2010 - Aug 2010
Type 45 Destroyers - HV and LV switchgear, commissioning
PMS, I/O loop testing, pumps, motors and VSD's Alstom (Alspa 3000),
GE Fanuc. Relay injection testing. Fire & Flood Systems, Diesel engine
commissioning.
MagnoxSouth-Dungeness A Power Station, Electrical Project Engineer
May 2010 - June 2010
Electrical projects on De-commissioning of Power station
Electrical Overlay Project
BAE Systems, Electrical Commissioning Engineer
March 2010 - May 2010
Type 45 Destroyers - HV and LV switchgear, relay injection testing,
commissioning
PMS, I/O loop testing, pumps, motors and VSD's Alstom (Alspa 3000),
GE Fanuc. Relay injection testing
Westinghouse Nuclear, C, E & I Commissioning Team Leader
Ringhals Power Station Sweden. Aug 2009 - Jan 2010
Commissioning of reactor 2 Outage involving Sat 1 tests on Emerson
Ovation/Westinghouse PLC & DCS systems. Hot and cold Control Loop checking
and testing on all instruments. Calibration of various Process Control
Instruments, Control Valves & Switchgear. Commissioning of a new main
control room. Control Room Turbine and Electrical Test Engineer for Sat 2
tests for start up of reactor and turbine plants. Control of Permits and
supervision of other workers within the team.
Babcock Nuclear Services. Electrical Commissioning Engineer.
Heysham Power Station. June 2009 to Aug 2009.
Overseeing the installation of the E & I aspects of a Ponds Water
Recirculating System. Liasing with the mechanical and fabrication teams to
ensure a minimum of disruption and downtime. Testing and diagnosing faults
of various pneumatic and hydraulic systems and other instrumentation
systems. Inspection and commissioning of the completed system.
Alstec Ltd / Babcock Nuclear Services. Electrical Commissioning Engineer.
Chapelcross Power Station. June 2006 to June 2009.
Inspection, testing and commissioning on the Fuel Route Transition Project.
The project involves a major upgrade of all equipment prior to the de-
fuelling of four Magnox reactors. Setting to work of remote, semi-automated
electrical and hydraulic PLC controlled equipment.
Validation of Plant Item Operating Instructions, and training of plant
operators. Amending of commissioning
Documentation (Site Acceptance Tests and Plant Commissioning
Documents), writing supplementary test documents and producing as
-built drawings. Assisting Design with plant modifications.
British Energy Electrical Engineer (Commissioning)
Dungeness B Nuclear Power Station May 2003 - March 2006
Electrical Engineer (Commissioning) Works Management Project, Electrical
Installation Inspection on turbine and reactor plants. Extracting technical
info from manuals, drawings, populate bills of material, equipment & safety
management fields. Generate risk & coshh assessments and produce reports as
required. Working on turbine shutdown calibrating instruments and
electrical modifications to turbine equipment.
Booth Welsh Automation Electrical Commissioning Technician
July 2002- May 2003 Electrical installations, maintenance and
commissioning on a variety of industrial sites, panel building and the
supervision of other workers. Installing Automation and Control
systems on various sites such as GSK, Roche from switchrooms to field
devices. Inspection, testing and commissioning of electrical and
Instrument plant and systems. These include 24v, 110v, 240v and 415v
systems, small power, lighting, motors, motor starters and control
logic circuits and instrument loops.
Blackburn Controls
Mar 2002- Apr 2002 Electrical Technician
Control Systems (Commissioning). Installations on Industrial Facilities for
control systems ie PLC's busbar systems. Tray Work, Cabling and
supervision of other workers.
Lawson Mardon Superior Packaging
Jan 2000-Mar 2002 Electrical Technician
Plant Maintenance, Installations, Trouble Shooting. Designing Control
Panels for
Various prototype printing machines. Working on control systems using PLCs,
Seimens Step 5 Step 7,
Pneumatics (Control Systems), AC and DC Motor Drives Conveyor Systems.
Fullarton Computer Industries
June 1986-Dec 1999 Electrical Technician
Electrical Maintenance, Installations Three Phase Systems, Control Panels
(Build) Tray Work, Trunking,
3 Phase Single Phase Motors, PLCs (Siemens) and 50 Hz and 60 Hz Generator
maintenance
References Fuel Route Engineer Site
Lead Engineer
Chris Little Jim Mcgeehin
C/o Chapelcross Power Station 14 Rossefield
Annan Barrow-in-Furness
Dumfriesshire Cumbria
Tel: 01461 208
Mob.078********
Mob. 078********
.