Resume:

CURRICULUM VITAE

RICHARD BRAMWELL

** ******* ****

STEVENSTON

AYRSHIRE

KA20 4DA

012**-******

079********

Personal Details E-mail: ab7fiv@r.postjobfree.com Date of Birth: 14/09/70

Availability 1 week notice

Professional Profile;

Commissioning, specializing in the oil and gas industry. Controlling and

developing safe working strategies for projects under my control. I

have controlled the management of various areas within projects including:

-

. Hook-up & Commissioning of Brownfield Onshore Installations

. Shutdown Co-ordination

. Construction

. Certification

. Remote Engineering Liaison and on-site design support

I pride myself on being a safe and efficient team player, and developing

solutions to difficult engineering problems. I comfortably communicate at

all organisational levels and I pride myself on having the drive and

enthusiasm to ensure my work scopes are completed in accordance with the

plan.

Key Achievements

. Time served qualified electrician.

. Experienced supervisor.

. Project experience within petrochemical and refining industries.

. Proficient in planning workloads and monitoring progress.

. Experienced in producing detailed commissioning method statements.

. Continual use of initiative and innovation to solve problems, clear

obstacles and identify opportunities.

. Excellent interpersonal, verbal and written communication skills.

Qualifications & Courses Completed

. Electrical Engineering HNC.

. Electrical Engineering ONC.

. Step 5 PLC Course, Step 7 PLC Course

. IEE Regulations 16th edition.

. Curent Compex Ex 01-04 Certificate.

. Modern Apprenticeship Engineering. (EITB)

. SJIB Registered.

. Safety Passport.

. Offshore Survival/MIST & Medical

Employment Details

Woodgroup E&I Commissioning Engineer June 11 - Present

Shell Mossmorran/Braefoot Bay

Responsible for the delivery of Minor plant modifications, and Plant

rejuvenation projects, which are of a larger scale, typically system wide

change-outs of major plant / equipment. Responsible for Pre

Commissioning and Commissioning of all electrical systems associated with

gas production, 415V switchboards and associated protection devices,

110VAC & 24VDC UPS and trip chargers. Fully conversant with all forms of

process engineering documentation, including block diagrams, PFD's, P&ID's,

Data Sheets and Cause & Effect charts. Pre-commissioning/commissioning of

new installed plant Honeywell C300 DCS and Safety Manager in conjunction

with the vendor. Commissioning of Valves, Pumps and instruments. Marine

Offloading Facility and LNG Jetty modifications and

commissioning.Preparation of commissioning dossiers and work packs

required for the tasks. Complete all commissioning documentation for the

close out of the project. Shell permit to work system, ISSOW. Participating

in HAZID/HAZOP reviews and attending FAT. Leading Multi discipline teams

through main plant shutdown to achieve Project handover to Asset and

subsequent introduction of Hydrocarbons.

PSN/Woodgroup E C&I Commissioning Engineer

Conoco Phillips Viking Bravo (offshore) March 2011

Compression Optimisation Project. Raise and efficient completion of

Permits and all supporting documentation to ensure safe commissioning

tasks. Commissioning of new installed instrumentation from field to

Honeywell Dcs and Scada applications. Test all software changes which were

implemented to the Triconex safety systems. Commissioning of various

control valves within the scope of work. Complete all commissioning

documentation for the close out of the project.

Field System Design E&I Commissioning Engineer

New Build Waste to Energy Incinerator Plant April 2011-May 2011

Commissioning and Loop Testing of all on site instrumentation. Calibration

of pressure, temperature, flow and level instrumentation.

Babcock International Group Electrical Commissioning Engineer

Heysham Power Station. Aug 2010 to April 2011

Overseeing the installation of the E & I aspects of the Active Effluent

Treatment plant. Liasing with the mechanical and fabrication teams to

ensure a minimum of disruption and downtime. Testing and diagnosing faults

of various pneumatic and hydraulic systems and other instrumentation

systems. Inspection and commissioning of the completed system.

BAE Systems, Electrical Commissioning Engineer

June 2010 - Aug 2010

Type 45 Destroyers - HV and LV switchgear, commissioning

PMS, I/O loop testing, pumps, motors and VSD's Alstom (Alspa 3000),

GE Fanuc. Relay injection testing. Fire & Flood Systems, Diesel engine

commissioning.

MagnoxSouth-Dungeness A Power Station, Electrical Project Engineer

May 2010 - June 2010

Electrical projects on De-commissioning of Power station

Electrical Overlay Project

BAE Systems, Electrical Commissioning Engineer

March 2010 - May 2010

Type 45 Destroyers - HV and LV switchgear, relay injection testing,

commissioning

PMS, I/O loop testing, pumps, motors and VSD's Alstom (Alspa 3000),

GE Fanuc. Relay injection testing

Westinghouse Nuclear, C, E & I Commissioning Team Leader

Ringhals Power Station Sweden. Aug 2009 - Jan 2010

Commissioning of reactor 2 Outage involving Sat 1 tests on Emerson

Ovation/Westinghouse PLC & DCS systems. Hot and cold Control Loop checking

and testing on all instruments. Calibration of various Process Control

Instruments, Control Valves & Switchgear. Commissioning of a new main

control room. Control Room Turbine and Electrical Test Engineer for Sat 2

tests for start up of reactor and turbine plants. Control of Permits and

supervision of other workers within the team.

Babcock Nuclear Services. Electrical Commissioning Engineer.

Heysham Power Station. June 2009 to Aug 2009.

Overseeing the installation of the E & I aspects of a Ponds Water

Recirculating System. Liasing with the mechanical and fabrication teams to

ensure a minimum of disruption and downtime. Testing and diagnosing faults

of various pneumatic and hydraulic systems and other instrumentation

systems. Inspection and commissioning of the completed system.

Alstec Ltd / Babcock Nuclear Services. Electrical Commissioning Engineer.

Chapelcross Power Station. June 2006 to June 2009.

Inspection, testing and commissioning on the Fuel Route Transition Project.

The project involves a major upgrade of all equipment prior to the de-

fuelling of four Magnox reactors. Setting to work of remote, semi-automated

electrical and hydraulic PLC controlled equipment.

Validation of Plant Item Operating Instructions, and training of plant

operators. Amending of commissioning

Documentation (Site Acceptance Tests and Plant Commissioning

Documents), writing supplementary test documents and producing as

-built drawings. Assisting Design with plant modifications.

British Energy Electrical Engineer (Commissioning)

Dungeness B Nuclear Power Station May 2003 - March 2006

Electrical Engineer (Commissioning) Works Management Project, Electrical

Installation Inspection on turbine and reactor plants. Extracting technical

info from manuals, drawings, populate bills of material, equipment & safety

management fields. Generate risk & coshh assessments and produce reports as

required. Working on turbine shutdown calibrating instruments and

electrical modifications to turbine equipment.

Booth Welsh Automation Electrical Commissioning Technician

July 2002- May 2003 Electrical installations, maintenance and

commissioning on a variety of industrial sites, panel building and the

supervision of other workers. Installing Automation and Control

systems on various sites such as GSK, Roche from switchrooms to field

devices. Inspection, testing and commissioning of electrical and

Instrument plant and systems. These include 24v, 110v, 240v and 415v

systems, small power, lighting, motors, motor starters and control

logic circuits and instrument loops.

Blackburn Controls

Mar 2002- Apr 2002 Electrical Technician

Control Systems (Commissioning). Installations on Industrial Facilities for

control systems ie PLC's busbar systems. Tray Work, Cabling and

supervision of other workers.

Lawson Mardon Superior Packaging

Jan 2000-Mar 2002 Electrical Technician

Plant Maintenance, Installations, Trouble Shooting. Designing Control

Panels for

Various prototype printing machines. Working on control systems using PLCs,

Seimens Step 5 Step 7,

Pneumatics (Control Systems), AC and DC Motor Drives Conveyor Systems.

Fullarton Computer Industries

June 1986-Dec 1999 Electrical Technician

Electrical Maintenance, Installations Three Phase Systems, Control Panels

(Build) Tray Work, Trunking,

3 Phase Single Phase Motors, PLCs (Siemens) and 50 Hz and 60 Hz Generator

maintenance

References Fuel Route Engineer Site

Lead Engineer

Chris Little Jim Mcgeehin

C/o Chapelcross Power Station 14 Rossefield

Annan Barrow-in-Furness

Dumfriesshire Cumbria

Tel: 01461 208

Mob.078********

Mob. 078********

.



Contact this candidate