Post Job Free
Sign in

Project Manager / Estimator

Location:
CT, 06482
Posted:
September 19, 2013

Contact this candidate

Resume:

Greg Canonico,

* ***** **** ****

Bethlehem, CT *6751

Phone: 914-***-****

Email: ***********@*****.***

Senior Electrical Estimator

PROJECT MANAGEMENT

OBJECTIVE

Offering twenty years' experience in the industry with a solid history of

providing growth

and commitment to my employer, my employees and myself.

CORE MANAGEMENT QUALIFICATIONS

12 Years of commercial estimating experience

Proven track record of setting corporate growth oriented goals and exceeding

the same, through both good and bad economic times.

Strong and proven estimating and project management, projects up to $21M.

Heavy background in commercial and industrial projects from pre-construction

through completion.

Ability to manage all major segments of projects.

Solid history of working for and with top companies, successfully.

Ability to identify strengths and build successful teams.

Excellent communicator with a knack to get others to participate.

Ability to establish good corporate reputation in the industry with solid

client relations.

Proven understanding of commitment and loyalty with the ability to gain this

from staff.

CAREER ACCOMPLISHMENTS

Documented year to year profit growth throughout my career.

Averaged an 15-18% award rate over the last 8 years (all profitable projects)

Taking the advancements in technology to the next level in the company's I've

worked for saving

Money and increasing productivity and moral.

Creating a good core team effort everywhere I've been employed

PROFESSIONAL EXPERIENCE

Interstate Electrical Services 9/4/12 - present

Bloomfield, CT

Project Estimator

Charged with tracking estimating and following up on projects from $5k to $20M.

Head estimator in CT branch

Helped establish a strong team ethic that was nonexistent when I arrived there

Brought into revitalize companies presence in the CT market

Projects types ranging from Hospitals, office fit outs, new buildings, High

rises, airport work, Schools, data centers, etc.

Corporate Electric Group 7/1/11 - 9/4/12

College Point, NY

Senior Estimator

Came in and completely revamped the estimating Dep't from personnel,

procedures, and equipment

Created a 22 million dollar back log

Estimated $190M in estimates personally 3 estimator team estimated 250M

collectively projects ranging from Hospitals, office fit outs, new buildings,

High rises, airport work, Schools, data centers, etc.

Belway Electrical Contracting Corp

12/31/07 - 6/31/11

Elmsford, NY

Estimator / Project Manager

Electrical estimating and change order pricing for large commercial and

industrial type projects, both public and private, ranging up to 25M in size

Project managed 10 million 4 month 250,000 Sq. Ft Office renovations in

Stamford CT - produced 2.5M in collected change orders.

Electrical estimating and change order pricing for large commercial and

industrial type projects,

Kennedy Electric 7/1/04 - 11/31/07

Torrington, CT

Estimator / Project Manager

Electrical estimating and change order pricing for large commercial and

industrial type projects, both public and private, ranging up to 8M in size

Project managed projects up to 250,000.00 in size.

Put in charge of developing and running 2 truck service department

Jusler Electric

11/1/2001 -6/31/2004

Long Island City, NY

Estimator / Project Manager

Electrical estimating and change order pricing for large commercial and

industrial type projects, both public and private, ranging up to 21M in size

Project managed projects up to 250,000.00 in size.

Various Electrical Contractors

11/1/1991 -10/31/2001

NY

Electrician

EDUCATION / TRAINING

Mamaroneck High School, Mamaroneck, NY 1988- 1991

Iona College, Associates 1991-1992

NECA Estimating I & II

NECA Project Management I

Microsoft Office

Microsoft Project

Accubid Pro

Accubid Live Count

Con Est Advanced Training

McCormick Advanced Training

Notable Projects

2012 Award LaGuardia Airport Terminal C Fire Alarm Upgrade

Base award amount of 1.9 million. Projects consisted of the installation of

new FA devices and replace old analog devices and wiring, and install a

complete new addressable fire alarm system to code and Demo and remove old

antiquated system when new system is on line. Estimated

2011 Award LaGuardia Airport Terminal C and D Connector Bridge

Base award amount of 1.0 million. Projects consisted of the installation of

new Switch gear, feeders, lighting, power, security, P.A. systems, to a new

construction 500'bridge connecting. Estimated

2011 Award Six projects at NYU Langone Med Center

Each project was less than $500,000.00. Projects consisted of Demolition

and renovation of Labs, Operating rooms, Emergency Rooms, Animal Imaging

labs, exam rooms, offices Etc, involving, lighting, Gear, fire alarm,

nurse call security ventilation, airlocks etc. Estimated

2011 Award SAC Capital Head quarters

Base award amount of 1.2 million. Project consists of Infrastructure of new

main headquarters in Manhattan NY, 8 floors of consisting 1 MDF and 6 IDFs.

Estimated

2011 Award College of Staten Island North & South Dorms,

Base Award of 5.9 Million. Project consists of 2 new 5 story dorms with 250

suites. Project consisted of New 15 KV service, to both buildings as well

as distribution riser throughout the dorms. Tele Data, Security, CCTV,

CATV, Fire Alarm services. Estimated

2011 Award Heineken White Plains NY:

Base award amount of 860,000.00. Project consisted of renovation to 11th

and 12th floors of the building, consisting of Demolition, Temporary light

& power, new power devices, electrified furniture power, new lighting,

fire alarm, security, tele data, Estimated

2010 award: Elizabeth Seton Children's Hospital:

Base Award amount of 8 million. Project consisted of new building out of

the ground, new service, site lighting, interior lighting, power

distribution, back up UPS and diesel generator system, HVAC power wiring,

tele data, fire alarm security, and nurse call systems, temporary service,

lighting an power. Estimated

2010 Award Morgan Stanley Purchase NY:

Base award amount of 485,000.00. Project consisted of renovation to the

executive and CEO area of the building, consisting of Demolition, Temporary

light & power, new power devices, electrified furniture power, new

lighting, fire alarm, security, tele data, Estimated

2010 Award Chase Hangar at Westchester County Airport NY:

Base award amount of 3.6 Million Project consisted of renovation to the

existing hangar, doing demolition, temporary light & power, new 2000A

service, new power devices, electrified furniture power, new lighting,,

fire alarm, security, tele data, Site lighting, DC power system, Heat trace

wiring for hangar door tracks. Estimated

2009 Award Blythdale Children's Hospital Valhalla NY:

Base Award amount of 3 million. Project consisted of new addition out of

the ground, upgrade to existing service, renovation to site lighting, new

interior lighting, addition to power distribution, HVAC power wiring, tele

data, fire alarm, security, and nurse call systems. Estimated

2009 General Reinsurance Stamford CT:

Base Award amount of 2.8 Million. Project consisted of renovation of

200,000 Sq Ft of office space for demolition, temporary light & power, back

up UPS and diesel generator system new power devices, electrified furniture

power, new lighting, fire alarm, security, tele data. Estimated

2008 GE Energy Stamford CT:

Base Award amount of 10,000,000.00 Project consisted of renovation of

250,000 Sq Ft of office space four floors in a fast paced 4 month project

for of Demolition, Temporary light & power, back up UPS and diesel

generator system new power devices, electrified furniture power, new

lighting, security, audio/video, sound masking, fire alarm, tele data, (I

was also brought on site to handle all change orders and assist in the

project management, I generate another 2.5 million in approved and paid

change orders.Estimated & Project Managed

2007 Target Torrington CT:

Base Award amount of 2,000,000.00 Project consisted of new building out of

the ground, new service, site lighting, and interior lighting, power

distribution, back up UPS and diesel generator system, HVAC power wiring,

fire alarm, security, temporary service, lighting and power. Estimated

2007 Enfield Ct High School athletic field sports lighting Enfield CT:

Base Award amount of 250,000.00 Project consisted of four new 80' pole

sports field lighting, grand stand snack bar and storage, facility power

and lighting, new site service. Estimated & Project Managed

2007 Travelers Insurance Hartford CT:

Base Award amount of 2,000,000.00 Project consisted of new building out of

the ground, new service, site lighting, interior lighting, power

distribution, back up UPS and diesel generator system, HVAC power wiring,

audio/video, fire alarm, security, temporary service, lighting and power

Estimated

2001 NY Presbyterian Hospital Harlem NY:

Base Award amount of 21 million. Project consisted of a new 13 story

medical research building with labs and a vivarium out of the ground, new

service, Core and shell, interior lighting, power distribution, back up UPS

and diesel generator system, HVAC power wiring, tele data, fire alarm,

security, and temporary service, lighting and power. In addition we did the

13 floor fit outs of the buildoong roughly amounting to 1.25 to 1.5 million

per floor for fit outs. Estimated

2001-2004 NY Presbyterian Hospital Harlem NY:

Awarded several floors of the new building listed above, for vivarium and

infectious disease labs. Animal behavior studies, and administrative

offices. interior lighting, power distribution, back up, HVAC power and

control wiring, air lock systems, tele data, fire alarm, security.

Estimated

2001-2004 Pfizer Brooklyn NY:

Awarded several projects at their facility for GMP processing, and

manufacturing, in their clean room facilities, involving all of the

following. New dual 4000A service from two new con ed underground vaults,

interior lighting, power distribution, back up, HVAC power and control

wiring, air lock systems, tele data, fire alarm, security. Estimated

2002 LIRR Maintenance facility in Jamaica Queens NY:

Awarded the renovation of their fire alarm system in the entire building.

Estimated

In addition to these larger projects I bid and have been awarded smaller

office fit outs and renovations, Retail food, clothing in malls and stand-

alone buildings.



Contact this candidate