Post Job Free

Resume

Sign in

Engineer Construction

Location:
Istanbul, Turkey
Posted:
September 07, 2013

Contact this candidate

Resume:

M. ERDEM SAHIN [pic]

Address: Kucuk Camlica Mh. Bodrumi Cami Cd. Senocak

Sk. Keskiner Apt. No:4 Daire:4 PK.34696 Uskudar -

Istanbul / TURKEY

GSM-1: +90.533-***-**** GSM-2: +90.507-***-****

E-mail : ab6ylj@r.postjobfree.com

Note: Able to travel and immigrate to work or

project location wherever. There is no obstacle for

travelling.

CAREER TARGET

To be at suitable position according my experience in international

Energy - Oil / Gas based institutional company, management of staff

and different disciplines with my technical knowledge and experiences,

also to give confidence to the related administration or departments

and enhance my knowledge & experience.

PERSONAL INFORMATION

. Date of Birth/Place : 11.12.1978 / Istanbul - TURKEY

. Marital Status : Single

. Military Service : Completed (Second lieutenant / Land Forces

Logistic Command / 2003-2004)

. Nationality : T.R. (Republic of Turkey)

EDUCATION

. Kocaeli University / Mechanical Engineering [1996-2002]

LANGUAGES

. English : Level "C" (Advanced)

. Russian : Elementary

PROFESSIONAL WORK EXPERIENCE

Since 1997 up to now, my experiences related with petroleum refineries,

crude oil pipeline operations, industrial foundations, piping -

construction, installation, commissioning-start up and site coordination

are as follows.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- -

Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline / BOTAS International (BIL)

[November 2008 - Today]

Supervisor (Lead Engineer) - Turkey (Sivas, Ceyhan)

BTC (Baku-Tbilisi-Ceyhan) Crude Oil pipeline is the longest crude oil

pipeline in the world which installed by experiences of international

Oil/Gas companies (BP, SOCAR, Chevron, Statoil, TPAO, Eni/Agip,

Total, Itochu, Inpex, Conoco Phillips ve Hess Corporotion). Daily

capasity is over 1 million barrels (Overall capacity is 1,62 billion

barrels - January 2013) and total distance is 1.776 km. We operate and

do maintenance activities for 430 km of pipeline (PST-4 Pump station,

12 pieces BVS "Block Valve Station" and 42"-430 km of pipeline). My

primary responsibilities are as follows as Supervisor "Lead Engineer"

:

- In PST4 Pump Station on BTC Crude Oil Pipeline, preparing detailed

mechanical maintenance work schedule for Wartsila gas engine-pump

groups, Utility units and BVS (Block Valve Station); team and site

management; making coordination and organization between of mechanical

maintenance group and electrical maintenance group and field operation

group; providing all pipelines' integrity and taking measures to keep

it running so that they are working properly daily.

- Preparation of the reports of maintenance activities and keeping

records under Maximo system, claiming required materials for

purchasing.

- Determine the technical skill level of staff by using the CAMS

(Competence Assurance Management System), establish the required

educational activities to improve the level of personal competence and

keep records all documents under CAMS.

- Site coordination and management of contractors and subcontractors.

- All the work activities are proceeded and monitored according to the

HSE (Health-Safety-Environment) golden rules which are accepted by our

company and international petroleum sectors.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- -

EMITA Building CO. - (OMAN & KAZAKHSTAN)

[May 2007 - November 2008]

Mechanical Group Chief - Oman (Muscat), Site Chief - Kazakhstan (Almaty)

EMITA CO. to be active in the construction sector. I managed and

completed project as Mechanical Group Chief in Muscat city of

Sultanate of Oman. Construction of The New Terminal Building of Muscat

international airport project had 38 million USD budget and mechanical

works had 7 million USD budget. I managed and completed projects as

Site Chief in Almaty city of Kazakhstan. Mechanical works of Hotels

and industrial facilities projects's budgets was over 5,5 million USD.

My primary responsibilities are as follows:

- Supervision of shop drawings, as well as production installation

activities of both infrastructure upper structure works.

- Selection and procurement of materials and equipments.

- Selection of subcontractors as per the requirement of site

necessities, constructing the site team and responsibilities of

signing terms of conditions (contracts).

- Coordination of the staff and teams, management and execution of the

works and activities as per the specifications and technical/design

drawings.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- -

CENK Industrial Facility Building CO. - (TURKEY)

[November 2005 - May 2007]

Site Chief - Turkey (Kirsehir, Iskenderun, Adana, Mersin)

CENK CO. to be active in the industrial facility building sector. I

managed and completed projects as Site Chief. The completed projects

are, in iron-steel factories located in Iskenderun (ISDEM?R, Yazici

iron-steel, Ekinciler iron-steel, Nursan iron-steel, Tosyal? iron-

steel), building of pump station with 4 million USD budget,

construction of water cooling towers and pipe works with 8,5 million

USD budget, in starch factory located in Adana (Tat starch, Aminium

starch), construction of water cooling towers and pipe works with 1,5

million USD budget, in glassworks factory located in Mersin,

renovation of water cooling towers and pipe works with 1 million USD

budget and sugar factory located in Kirsehir construction of water

cooling towers and pipe works with 1,5 million USD budget. . My main

responsibilities are as follows as Site Chief at industrial facilities

construction and piping inclusive projects:

- Execution of the site mobilization.

- Technical, administrative and financial management of construction

sites under the scope of company.

- Purchasing of materials and equipments.

- Selection of subcontractors as per the requirement of site

necessities, constructing the site team and responsibilities of

signing terms of conditions (contracts).

- Coordination of the staff and teams, management and execution of the

works and activities in line with the specifications and

technical/design drawings.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

-

ZAMBAK Architectural Engineering Building CO. - (TURKEY)

[July 2004 - November 2005]

Mechanical Group Chief - Turkey (Istanbul)

ZAMBAK CO. to be active in the building sector. I managed and

completed projects as Mechanical Group Chief. The completed projects

are, construction of The Media Centre Building project had 19 million

USD budget and mechanical works had 4,5 million USD budget, building

of schools and villas mechanical works with over 3 million USD budget.

My main responsibilities are as follows

- Executing the pre-requirements and designs of HVAC and mechanical

installation, managing tender / invitation for bids and controlling

the live site construction activities.

- Selection and procurement of materials and equipments.

- Executing managing tender / invitation for bids related with

application projects, decision of the sub contractor and making of the

agreement / terms of conditions.

- Planning detail schedule for work flow chart, controlling and

management of the site construction activities.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

-

UNKA Building Construction CO. - (TURKEY)

[Jun 1997 - July 2003]

Production and Site Chief - Turkey (Kocaeli, Izmir, Kirikkale, Rize)

I have worked at UNKA Building Construction Limited, functioning in

industrial construction, as a Production and Site Chief to execute the

petroleum rafineries (TUPRAS) and other industrial projects located in

Izmit, Kirikkale, Batman and Izmir and to execute piping-construction-

installation works at storage tank construction projects located in

Izmit, Izmir and Rize. My main responsibilities are as follows:

- Execution of steel-construction related installation and assembly,

technical investigation of piping and metal fillings and preparation

of the offers.

- Provision of necessary materials and equipments for production and

installation works.

- Execution of the site mobilization.

- Technical, administrative and financial management of store tanks,

farm tanks and piping-construction works and controlling of

installation band of assembly.

- Assuring that the activities are executed according to the petroleum

sector standards.

Production and Site Engineer - Turkey (Kocaeli, Kirikkale) _ "University

Student in Engineering - Full time working"

I have worked at UNKA Building Construction Limited, as a Production

and Site Engineer. My main responsibilities are as follows:

- Execution of steel-construction related installation and assembly,

technical investigation of piping and metal fillings and preparation

of preliminary work.

- Preparation of lists for necessary materials and equipments for

production and installation works.

- Assuring that the activities are executed according to the petroleum

sector standards.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

-

COMPUTER SKILLS

. Auto CAD, MS Windows & MS Office applications (Word, Excel, Power

Point etc.).

DRIVING LICENSE

. Class "B" / Active Driver

TALENTS

. Interact effectively with team work, Communication, Leadership,

Organizational and managerial skills / mental, Motivation, Analytical

mind, Result driven/oriented work, Flexibility and Adaptation,

Familiarity International codes & standards, Open view to developments

and innovations in technology.

INTERESTS

. Aquarium, Chess, Flowerpot plant, Cars.

REFERENCES

. Fazil SENEL

Republic of Turkey Energy Market Regulatory Authority (EMRA)

Member of Board

Tel-1: +90.312-***-**** / Tel-2: +90.312-***-**** E-mail:

ab6ylj@r.postjobfree.com

. Nazim KESER

CDS Datacenter & Design Services

Projects Manager

Tel: +90.532-***-**** E-mail: ab6ylj@r.postjobfree.com

. Selcuk SOYER

SONMEZ Engineering CO.

QA-QC Manager

Tel-1: +90.532-***-**** / Tel-2: +966.53.2586001 E-mail:

ab6ylj@r.postjobfree.com

. Husamettin COBAN

Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline - BOTAS International

Electrical Supervisor - Lead Engineer

Tel: +90.533-***-**** E-mail: ab6ylj@r.postjobfree.com

. Cesim YILMAZ

Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline - BOTAS International

Public Relation Regional Responsible

Tel: +90.533-***-**** E-mail: ab6ylj@r.postjobfree.com

. Ahmet Veysel CELIK

ERENCO Engineering CO.

QA-QC Manager

Tel: +90.530-***-**** E-mail: ab6ylj@r.postjobfree.com

QUALIFICATIONS / TRAININGS / SEMINARS

Various Training Courses and seminars I have attended during my

professional life:

. Health, Safety, Environment (HSE) basic induction

. BOTAS International (BIL) - British Petroleum (BP) "HSE Golden Rules"

. Safety Observation Conversation (SOC) for safety working

. BOSS / STOP Card

. Personal Protection Equipments (PPE) using

. Permit to Work (PTW) and Performing Authority (PA) procedure

. Basic electrical safety

. Energy Isolation - Process Isolation (EI-PI)

. Confined space entry - Breath apparatus using - Gas tester level 1

. Environmental awareness

. Rigging and slinging education

. Defensive driving and techniques

. Anti-Skid and winter driving

. Off road driving

. Road and vehicle safety

. Journey planning and management

. Ergonomics

. Manual handling / Body working techniques

. Living and working in harsh climates

. Survivor kit using - Avalanche awareness - Balance on snowbike -

Survive in winter conditions

. Global Position System (GPS)

. Incident investigation 1

. Incident investigation and root cause analysis

. Basic emergency response training for pump stations

. Fire fighting equipments using

. Explosive, burner and flammable materials

. P&ID Using

. Competence Assurance Management System (CAMS) assessor training

. CAT Emergency generator

. Air condition (HVAC) systems

. BALTUR Burners, Liquid/Gases burner education

. VIESSMANN Boilers, Liquid/Gases burner boiler

. ENTEK education, Hydraulic systems and circuits

. EAGLEBURGMAN Mechanical seals

. Drag Reducing Agent (DRA) system

. MAS Pumps, Pumps and pump systems

. DAF hydrophore, Hydrophores and hydrophore systems

. Sesinoks APV, Heat exchangers

. MOBIL, Industrial oils and bearing lubrication

. FAG, Bearings

. BOTAS, Industrial natural gas systems and processes

. CDC, Smart building systems, Upper automation systems

. Water cooling towers of construction and packet type



Contact this candidate