[pic] AMIT KALRA
997*******,991*******,936-***-****
***********@**********.***
************@*****.***
.
PROFESSIONAL QUALIFICATION
B.E. in electronics from Nagpur University
ME in electronics from Manav bharti university
ADDITIONAL QUALIFICATION :
Smart plant instrumentation software Intools version 7.0 service pack 2
Diploma course in Industrial sensors, Controllers & Recorders
Diploma in Export Management
M.C.P. (Microsoft Certified Professional)
Primavera Course Rev 6.0 of PMP Project management Professional
Auto-CAD-2002, Computer hardware troubleshooting
Diploma course in Yoga and meditation
CAREER SUMMARY and SKILLSET
. B.E. with experience in Instrumentation and Industrial Maintenance
and Engineering
. Long Site experience with different plants like Power plants of 1550
MW Capacity namely
. OBRA Thermal Power plant
. Site experience with various process plants like Power,Cement,Steel,LNG,
. Worked on various fields like plant maintenance,planning,commissioning
. Working knowledge of Intools version 7.0 service pack 2
. Experience in various make of DCS Distributed Control systems like
Yokogawa CS-3000 DCS,Centum-XL DCS, CentumCS DCS,MicroXL DCS
. Experience in Emerson- ovation DCS,MAX dna DCS
. Experience in HF Controls DCS
. Working knowledge of various type of Control valves / Diff. Pressure
Transmitters / Diff. Temp. Transmitters /Mag flow miters/Vortex
Flow Meters/PH Meters/Temp. Controllers / Programmable Loop
Controllers,Chart Recorders / Chart less Recorders
. Instrument cable schedule,Technical specification of field
instruments,sizing and selection
. Of control valves
. Preparation of Instrument I/O List.
. Field engineering include preparation of instrument plot plan, hook
up diagram, field termination diagram, cable list, estimation of
erection bill of material such cables, tubes etc
. Instrument procurement activities such as interaction with vendors,
technical evaluation of bids and preparation of purchase
recommendation and also shop floor inspection.
. Good knowledge of computer hardware and software,installing patches,service packs etc
. Involved in planning of projects like Power,petrochemical etc with
Primavera Rev 6.0
. Co-ordination work with consultants/Vendors,soldering of instruments
. FAT/SAT with customers,DCS/PLC engineering which includes system
Architechture drawing
. System diagram,I/O list,making logic diagrams,graphics etc
. Procurement of instruments,vendor selection,getting best price and
selecting best vendor in
. terms of reliability,cost effectiveness and quality,ensuring
delivery of material on site and payment to vendor
. Provided guidance to Project Engineer, Design and EPC Contractors
personnel on construction and commissioning related issues throughout
all phases of the project.
. Undertake installation and commissioning of pneumatic and electronic
instrumentation on field facilities- on time
. Promoting profitability and sales of the company by promoting AMC
orders,selling new products
. Direct and coordinate installation, maintenance, support,
documentation, and testing
. activities to ensure compliance with specifications, codes, and
customer requirements
. Independently handled several sites Supporting and traveling sites at
a very short notice
. and providing emergency support
. Independently handling response centre which is Implementation of
online data monitoring using web server
. Provide commissioning/execution support to customers for all field
instrumentation products & systems,Review of PID's,desiqn of
instrumentation and control systems
. Preparation of Bill of Material for Hardware & Software.
. Study problems reported, troubleshoot and provide with techno
commercially viable solutions
. Hands on Knowledge in Foundation Fieldbus Technology
TRAINING UNDERWENT
. Yokogawa,Bangalore- Two Months DCS (CS-3000) System Engineering &
Project
. Two Weeks PLC (ProSafe-RS) System Engineering & Project
Engineering Training at YIL, Bangalore
. Mercuri Goldmann Insitute,Bangalore - Training about how to handle
customers, time management, leadership skills
. Mobilink Ltd, New Delhi-: Learnt about the basic paging system,
Study and comparison of existing protocol with new ones. Made a
project entitled 'Emergence of Flex as a high speed Protocol.'
. Advanced Training institute, Hyderabad- Learnt about Industrial
sensors, controllers & recorders used in big plants
Engineering institution membership
Member of ISA group, (Instrument society of America )
Lifetime member of institute of engineers, Kolkata
Lifetime member of Institution of Electronics and telecommunication
Date of Birth : 06/10/1973
Language Known : Hindi, English, Punjabi
Passport Valid passport no J0479084 issued from New Delhi till 2020
Work Experience
Company name -Smart Brains-It is a Institute of Engineering Design &
Research
Duration : August 2011 till date
Also completed my Mtech degree (electronics ) during this period
Job Profile : Learning and training on various EPC concepts like
training on
Intools version 7.0, service pack 2.0,Hook up drawings,logic drawings,
MTO for cable gland,plug,air manifold.
COMPANY NAME : DOOSAN HF CONTROLS CORPORATION LTD
Duration : March 2011
to July 2011
Job Profile : Worked on various aspects of instrumentation and
DCS
Project involved : NTPC Sipat : Being posted at NTPC Sipat site India s
first supercritical 660 MW superthermal power plant Worked on
engineering maintenance,troubleshooting and desiqning of DCS named HF
controls DCS and field related instrument problems Involved in training
to doosan and NTPC people .
COMPANY NAME: INDO GERMAN PETROCHEMICAL LTD
Duration :June 2010 till Feb 2011
Job Profile : It was a petrochemical plant which complete
maintenance,planning,procurement
Site supervision,commissioning,maintenance of Yokogawa CS-3000 and
Centum CS system,
Maintenance and repair of different instruments like control valves,
recorders,controllers,
Transmitters,Cordination work with consultants /vendors
COMPANY NAME : EMERSON PROCESS MANAGEMENT Power and Water solutions
Duration : November 2008 till May 2010
Job Profile : Involved in different aspects of projects of Emerson
like procurement,engineering,
vendor development,cost control,working on Ovation DCS, site support
Projects involved
NTPC Simhadri- Preparation cost estimation of bought out items,involved
in complete procurement activities of a project are involved,comparison
of technical specifications and prices and finalizing the material,preparation of technical specification for bought out items,responding
to all technical querries,
IOCL Panipat Addressing all technical queries new vendors,cost
estimation of all bought out item and finalizing the material
LANCO- Approval of drawings from client/consultant,detail desiqn and
engineering,arranging quotations from various vendors and finalizing the
material
ACC Ltd -Arranging of cables from various vendors,comparison of quotes
And procuring the material .
Vanda Ispat Ltd- Carrying out pre bid engineering,cost estimation of all
Bought out items
Worley Parsons ltd-It was a power plant which involved logic applicaions.
VESTAS Wind Energy ltd- It was a wind energy plant which had making
control sheets
COMPANY NAME: YOKOGAWA INDIA LTD
Duration: From April 2005 till October 2008
Key responsibilities
SHELL India Ltd - It was a LNG ( Liquified naural Gas ) which involved
CS-3000 and Prosafe PLC and did engineering changes checking from Field
to JB up to marshalling cabinet.
ACC Chaibasa - It was a cement plant where I did Founadation Field bus
commissiong
Erection commissioning of field Instruments as well as DCS panels and
commissioning of Yokogawa CS 3000 system, Yokogawa instruments,
TATA Steel ltd - It was a steel plant which had a captive power plant,involved in commissioning of CS 3000 sytem procuring material arranging
material,Trouble shooting field problems
Vijayawada Thermal Power Station - It was a thermal power plant where it
was a shutdown maintenance job overhauling and maintenance of instruments
and promoting sales of different products
Reliance Industries Ltd- It was a petrochemical plant where engineering
changes were done
IOCL- It was a oil and refinery plant which had nest loading review of
PID's
ONGC- Attending meeting with consultants & customers for pre -bid
engineering and techno-commercial discussion
Tata chemicals - It was a chemical plant which had installation of Micro-
XL
Gujarat Guardian - It was a glass plant which had installation of micro
XL and making engineering changes,trouble shooting problems coming in
Micro xl DCS
CFCL- It was a chemical and fertilizer plant which had installation of
Microxl System and engineering changes were done,preparation of bill of
material was done
Godavari sugars ltd -It was a sugar plant which had Yokogawa CS 3000
installed where it had periodic maintenance
Bhorukha gases ltd - It was a Gas plant for which certain sales support
was given
RCF -It was a chemical and fertiliser plant for which project planning
was done
IFFCO - It was a fertilizer plant for which commissioning support was
given
COMPANY NAME :INSTRUMENTATION LTD,Kota
Duration: From August 2001 till March 2005
Erection & Commissioning, Installation & Mounting,,complete EPC works of
200 MW,100MW,50 MW units of power plant configuring loops,, loop
checking, making graphics,making control drawings, of various range of
process control & Instrumentation systems such as MAX -1000 PLC'S of
Toshiba make AC Drives of Dynaspeed make
Testing, calibration, maintenance & repairing of various Instrumentation
equipments like temperature, pressure, level & flow transmitters of
different make such as Fuji,Rosemount
Different type of indicators and recorders such as of George Kent (UK),
Fuji(Japan),Chino (Japan)
Different type of control valves like Globe, Butterfly, Non return, stop
valve of IL Palakkad make.
Different type of electric actuator, pneumatic actuators of IL Palakkad
make
Projects involved
Panki Thermal Power station -It was a power plant 110 MW units (4 no's)
there was renovation and modernization of power plants .erection,
commissioning, maintenance of power plants and working on MAX 1000
DCS,reading of PID Technical Evaluation and Procurement of field
instruments (Orifice Plates, Transmitters, Gauges, switches, I/P &
control valves).
OBRA Thermal Power Plant- It was a Power plant 200 MW units ( 2
no's ) 100 MW ( 3 no's ) 50 MW ( 2 no ) It was a complete
erection, commissiong,maintainance,designing and configuring of
control loops, working on MAX1000 DCS, ax DCS, Toshiba PLC'S,Transmitters of Fuji make, Recorders of Chino and yokogawa
make controllers of Fuji make
Paricha Thermal Power Plant - It was a thermal power plant 110MW (2
no's )which had commissiong of Yokogawa DCS and MAX DCS,cable laying,control room layout Review of P&Ids, Technical specifications (Logic,
Loop Schematic DCS/PLC interface.,
Tanda Thermal Power Plant- It was a thermal power plant of 2*110 MW
capacity which had some preparation of bill of material
COMPANY NAME: INSTRUMENT ERECTORS
To look after maintenance, repair, calibration and testing of various
instruments involved in OBRA Thermal Power Plant from Jan. 2000 to July
2001. The instruments were Transmitters like pressure, flow, level
transmitters, Control valves, Thermocouple and RTD's,Indiators &
Recorders Bringing annual maintenance contract for the company.
COMPANY NAME: ESCO AUDIO VISUAL (I) PVT.LTD
Rendering technical service and promoting sales from Aug. 98 till Dec. 99
for advanced audio visual products like overhead projectors, slide
projectors, multieffect video walls of world class manufacturers like
Ask, Seleco, Vega, Epson, AVIO, and NVIEW. Administrating Windows NT,
LAN & providing Technical support to PC's .Providing system
administration & communication support
AMIT KALRA