Resume:

Will Hao Email: *******@****.**

Mobile: +86-158-****-****

> NEBOSH IGC, PRC Registered Safety Engineer. Trainer of lifting and

Scaffold Qualification,

> Total 17years HES management experience and petrol refinery process HSE

management, and 9years in large lifting/rigging and equipment

installation and transportation field, 5S management.

> Have a good experience of develop HES procedure and plan, attend

environment audits. Such as CNOOC, CNPC, BASF HES audit and Chevron

environment audit.

> Familiar with OSHA standards, SY/T standards PRC Law and some API

standard.

> Familiar with hydrogen sulphide gas well safety regulation and site

monitoring and preventing for operator management.

> Good team player and management ability. Judgment and event handling

ability. Have a strong leadership and coordination ability.

> Obtain outstanding contribution awards of HQCEC, CNPC.

> Passed BASF EHS audit and obtain Top one of Asia pacific

.

Personal Particulars

Gender : Male

Age : 43

Place of Birth : Taiyuan Shanxi China

Education : Shanxi finance and economic College

Training:

NEBOSH

CNPC CNOOC: HSE MS, Lifting/Rig training, safety operation of

offshore

ConocoPhillips: Lifting/Rig, Scaffolding, Safety management,

Emergency.

Chevron: ESHIA, Well Pad safety management, Emergency

response, H2S Safety, IIF.

Crosby: Lifting training, pulley and shackle safety

use.

AST Lifting and scaffolding train

Lafarge SAR (search and rescue)

Professional Experience:

Dec.2012-July.2013 BASF BEACH+BIP project Shanghai Of Worleyparsons

Position: HES Manager.

Passed BASF EHS audit and obtain Top one of Asia pacific.

> Created new HSE management system and Environment protection plan, waste

treatment plan including waste gas and liquid discharge, especially

coordinate with production plant.

> Changed warehouse place and disposal area, curing floor and made

cofferdam to prevent 2nd pollution, insure spillage emergency measures

were working.

> Worked out phosgene ERP Plan and hold phosgene ERP drill and training

regularly for all people on site

> Provided the solution for sewage water of piling work, prepare

emergency ponds

> Executed 5S visual management, cleared all of area and made sure all of

HSE sign are working.

> HSE budget control, Interviewed the bidder both HSE document and

site,and attended clarification meeting of bidder.

> Led HSE team to find and solve HSE issues and provided proper advice to

project team. HSE issues tracking and worked out action list of site

issues.

> Used HSE tools to analyse and identify the potential hazards and hold

training for all persons on site.

> Developed security management system Vehicles management and vender

management, executed the safe guards procedure.

> Liaised with authority of SCIP and Fire Fighting bureau to solve some

issues.

April.2010- Nov.2012: CDB Gas Project of Chevron Of Worley parsons

Position: HES Representative

Had completed first project of QiLi ridge project and Well Pad F of ODP1

Chevron

Responsibilities:

> Developed relevant operation procedure items that need contractor to

follow it, according to Chevron's requirements and work scope of

contract and PRC laws.

> Attended Chevron ESHIA training audit, assisted environment audit team

to check on site. Coordinated with environment Supervision Company to

solve practical issues.

> Conduct risk assessment to identify critical tasks, Identify critical

activities and significant work steps

> Review explosion plan and Monitoring work activities, check prevention

measures was adopted and make sure the info notice and warning sign was

working.

> Inspection of Fire fighting equipment and route, Christmas tree

condition day to day.

> To kept a good communication with Chevron& contractor & Supervision

Company modifying or corrected HSE issues timely.

> Worked closely with contractor and subcontractor to teach and negotiate

with them, how to open their mind to accept the requirement of company

then can increase working confidence to achieve double win.

> MSDS management and warehouse management, monitored all of DG material

register and using status,

> As a site commander following emergency response system and to

communicate with contractor and local community, and provided guidance

on community health and environment issues, figured out measure to

reduce and eliminate hazards that impacts on local people.

> Well Pad layout and keep safe distance for fire fighting, check wind

cock and alarm in a good condition, environment protection management,

make sure all of drainage and waste treat pond is meet the standards.

> Hold H2S gas detector and mini escape training for all of workers.

> Achieved training Such as, ESHIA, BBS, PTW, JSA, WAH, OEI, F&G,

defensive driving, IIF (Incident and injury free) training, 5-why

investigation System, EIM (early injury management), ERP (emergency

response plan), MSDS, etc.

April. 2009-Mar.2010: LARFARGE Indonesia Aceh LHO Re-construction Project;

including operation plant.

Position: Lifting/Rigging Specialist

Achieved 5 million Safety man hours; Lead 10 AST (Australia Skill Training)

people.

Responsibilities:

> Developed lifting plan with relevant mechanic engineer according to the

drawing/ weight /installation space and lifting high/angle of equipment

to decide crane type. The plan should comprise of using days and time to

control using budget.

> Reviewed lifting MS and procedure to make sure it complies with

company's rule.

> Led local lifting team and training them to check all of hoisting

equipments on site, such as winch. Gin pole, gantry type .sling

.shackle. Jacking lift systems and chain block keep liaison with local

testing authority to obtain relevant certificate.

> Provided professional solutions for difficult lifting operation, risk

analysis of high-lift operation; calculated relevant lifting capacity

and other problem concerning on site.

> Inspection of material thickness welding line of spread beams and

lifting lugs everyday .ensure lifting beam/lifting lug without crack

double skin interlayer and homemade gin pole.

> Created falling protection system, the anchor point inspection for life

line, check 65m High structure and equipment of pre-heater installation,

falling prevention system.

> Coordinate with operation plant team to solve work interface issues.

Guangxi Petro Refinery Co. /CNPC 2006- 2009

HSE manager

Obtain outstanding contribution award in 2008. Lead 3 supervisors

> Created working guidance plan and working plan.

> Attended CNPC HSE audit, checked all of units and activities do not

impact on land, river and air, and kept a good relation with local

people.

> Established and maintained HSE MS to compliance with company's

procedure.

> Perform environment prevention procedure and check sewage discharge and

rubbish disposal.

> Communicated with owner and subcontractor and Supervision Company, to

correct relevant HSE issues timely, provide professional advice to

management.

> Conduct kick-off risk management meeting and clearly defined

responsibilities for everyone. Hold the training, checked and monitored

the documents and certificate of unit and operator.

> Prepared HSE weekly/monthly audit and report. Monthly HSE Performance

Review and Scorecard emphasized next step safety work focus on.

> To work together with engineer to do SIL (safety integrity level). ESD

(emergence shutdown system) audit.

> Hold weekly meeting to resolve the issues and make out action list for

next week, learning and sharing HSE good or bad bulletin of last week.

> Led "ZERO incident" management team to Inspected environment protection

measure, fire fighting, emergency response, etc.

> Be in charge of huge crane entrance and large lifting & transportation.

Inspection of lifting lug of big tower equipment. Check lifting beam &

crane capability on the multiple crane lifting work.

> Inspection of emergency response plan and team arrangement, fire

fighting, spillage, incident.

June 1997- Jan 2006, offshore oil Tanggu of CNOOC

2005-2006, NB35-2 oil platform;

2003-2005, ConocoPhillips PL19-3 II phase Single Point Mooring System and

oil platform;

1997-2003,CACT HZ 21-1, QHD32-6 BZ25-1 oil platform project,

Nation "863" project dry type cabin underneath water,

HSE site manager and QHSE supervisor

Responsibilities:

Leaded 60 people team participating NB35-2 Project at LongKou Shandong

province.

> Participated environment prevention training, led team to make sure all

wastes disposal shall be followed HSE rules.

> Work out unqualified and unsafe item tracking list, make sure correction

is in time.

> Emergency response management including spillage/ fire fighting/

falling/ severe weather/ injury, etc. led drill of emergency response

regularly.

> Check working procedures on site, such as JHA and PTW, focus on special

working operation safety, such as: large scale lifting, outfitting, and

confined space painting, flammable/toxic/gas/oxygen monitor, etc.

> Conduct risk assessment to identify critical tasks, including onshore

and off shore working activities.

> Fire fighting equipment and prevention measures inspection, focus on the

rig floor, well area, flammable material storage areas, pump room, and

accommodation area.

> HSE equipment and instrument calibrate and using management.

> Offshore Installation and lifting. To check all of lifting equipment and

gear, hold toolbox meeting to clear lifting operation step and JHA

details.

> Heli deck safety management, Hold training for crew, such as: life

rafts, life vests, normal and emergency exits, cargo requirement,

alcohol and drug testing. Etc.

> Worked at jetty and hot work at jetty application and permission, focus

on working over water and prevented waste oil and sold material pollutes

the ocean. Hold weekly/monthly inspection and made tracking list and

monitoring correct condition.

> Crane operator safety management and check lifting gear and colour code

on the platform.

June1995-Apr1997, BoHai Sembawang shipyard

Operation leader

> Inspected all workshop operation and equipment installation.

> Drillship, Barge, Floating crane, FPSO maintenance and repair.

> Responsible for arrangement of manpower and cost control.

Aug1993-Mar.1995, North suburb association chemical plant of Taiyuan ShanXi

province.

Production Supervisor

> Be familiar with chemical reaction process, boiler operation,

refrigerating unit.etc.

> Be responsible for raw material quantities entry and pump; monitor the

reaction temperature, colour changing, time control and waste gas

discharge, etc

.



Contact this candidate