STEPHEN LATIF
*** ******* ****** ? Fountain Inn, SC 29644 ? Home 864-***-**** ? Cell 864-
SENIOR OPERATIONS MANAGER
Broad corporate organizational leadership track record of productivity
gains and cost reductions
PROFESSIONAL SUMMARY
Motivated MBA-level achiever with strong leadership and presentation
skills and 25+ years of
comprehensive experience directing operations through strategic planning
and effective management
of staff and budgets. Expertise in new business development combined with
effectiveness in high
profile operational roles, making high-stake decisions and overcoming
complex challenges.
A results-driven, analytical thinker committed to continuous improvement
who is a team builder,
capable of implementing best practices and motivating staff to peak
performance. Solid business &
leadership skills that are well suited to a variety of industries.
CORE COMPETENCIES
Strategic Business Planning & Leadership ? Team Development & Motivation
? Project Management
Financial Management ? BPS (TPS) Lean Manufacturing Initiatives ?
Productivity Improvements
Cost Reductions ? Plant Operations Management ? Performance Metrics
? Capacity Planning
New Product Launch ? Tool & Fixture Design ? Design Reviews ?
CNC Programming
PROFESSIONAL EXPEREINCE
James H Cross Company Erie, PA Tooling Supplier/MRO Integrated
Contacts 2008 - 2010
Site Manager ? Managed a 3-year MRO contract at a customer site in
Spartanburg, SC involving the
management of the tool room personnel as well as the procurement of over
14,000 tooling line items.
My daily evaluation of optimal reorder points based upon usage reduced
the clients annual spend on
tooling from $4 million to $2.5 million. Reduced tool crib labor by 50%.
Bosch/Rexroth Fountain Inn, SC Manufacturer of hydraulic pumps
& motors 1991-2008
Director of Operations
?Responsible for the following departments: Manufacturing (Machining,
Assembly & Test), Quality, Product Engineering, Manufacturing
Engineering, Maintenance, Tool Room, Heat Treat, Logistics, Buildings
& Grounds, OSHA/Hazardous Waste Management, Paint Facility
?Increased units shipped from 300/month to 15,000/month
?Monitored & directed the daily flow of production in a facility with
$200 million Annual Turnover
?Responsible for the implementation of new product lines for Major OEM
Accounts that dramatically
increased production levels. Customers include Caterpillar, John
Deere, Case-New Holland, Volvo
?Implemented the installation of various CNC Machining Cells, which
included Gildemeister Turning
Centers, Deckel Horizontal Machining Centers, Leibherr Hobber &
Lorenz Gear Shaper
?Monitored & Improved P&L, Production Efficiency, Daily Production
Levels, Past-Due Levels,
Quality Standards, Safety Standards, Capacity Constraints &
Eliminated Bottlenecks
?Championed the implementation of ISO 9001/14001 & TS 16949 Quality
Systems
?Managed 2 major expansions that increased the facility from 40,000 sq.
ft. to 130,000 sq. ft.
STEPHEN LATIF Page 2 0f 2 Home
864-***-**** ab6myd@r.postjobfree.com
Manufacturing Manager
?General Responsibilities included the management of the Machining,
Manufacturing Engineering,
Tooling and Maintenance Departments
?Ramp up production in a Start-up Facility, Recruit and Develop Team
Members at all levels
?Perform Payback Analysis/Justifications for Capital Equipment
Applications
?Monitor & Improve Quality and Productivity levels through weekly
meetings with Manufacturing Personnel
?Transfer/Replicate Machining Technology from parent plants in Germany
Bijur Lubricating Corporation Bennington, Vermont
1980-1991
Manufacturer of Lubricating Systems for OEMs such as Bridgeport, Brown &
Sharp, Davenport
Manufacturing Engineering Manager
?Determine Economic Order Quantities in order to balance inventory
carrying costs & setup costs
?Perform Manufacturing Design Reviews to determine Manufacturability &
Identify Cost
Reductions that will not impact the form, fit and function for both
new releases and existing products
?Recommend & implement Machining Methods that Reduce Cost, Increase
Throughput,
Improve Quality, minimize number of Clampings, eliminate Bottlenecks
& Capacity Constraints
?Recommend State of the Art Machining Technologies to maintain a
competitive advantage
Manufacturing Engineer
?Draft a complete Plant Layout for an 80,000 sq. ft. facility during a
site consolidation, positioning
the machinery in Cells to insure Maximum Flow of Manufactured Product
?Design detailed Work-Holding devices (fixtures) for Vertical Machining
Centers
?Verify fixture dimensional correlation to design on CMM to establish
exact machine work shifts
?Determine Part Routings according to established as well as newly
created Processes
?Write and optimize 500 CNC programs for a variety of Vertical Machining
Centers and 2-axis lathes
( Acroloc, Okuma, Okuma & Howa, Miyano with General Numeric, Okuma &
Fanuc controls)
?Consolidate multiple manual machining processes into 1 operation on CNC
machinery resulting in
40% to 60% cost savings per part with a dramatic improvement in
throughput & part quality
?Optimize new machining processes using the latest technology in Cutting
Tools & Carbide Inserts at optimal Cutting Speeds to increase
productivity and insure consistent part quality
Computer Skills
Utilized AS400 & SAP at Bosch/Rexroth and P21 & Cribmaster at James H
Cross
Proficient in Microsoft Word, Excel, Outlook & PowerPoint
Language Skills
Conversational in German with a good grasp of the Technical German
vocabulary
EDUCATION
M.B.A Rensselaer Polytechnic Institute Major in Management
Troy, NY 3.46 GPA
B.S. Keene State College Major in Industrial
Education Keene, NH 3.36 GPA