Post Job Free
Sign in

Manager Project

Location:
Ann Arbor, MI
Posted:
September 04, 2013

Contact this candidate

Resume:

CURRICULUM VITAE

Name : ANKUR R AMIN

Current Post - Asst. General Manager (Pyro & Hydro Production)

(B E METALLURGY)

Contact: +243-*********

+243-*********

E-mail: ***********@*****.**.**

OBJECTIVE

To attain a respectable position in Top Management by sharing knowledge and

experience and to learn more in field of metallurgy and management in

industries while working for achieving Goals of the organization.

STRENGTHS

Good leadership qualities like hard work, sincerity, reliability, honesty,

commitment and techno commercial skills to handle various departments. Am

an effective speaker, a good listener and achiever. I am a confident

manager for jobs like project management, production, shutdown coordination

as well as production planning and developments.

CORE SKILLS

. New assignment as production head for Hydro metallurgy Unit in addition

to Pyro Metallurgy Unit. Hydro unit involves production of Copper

cathode and cobalt hydroxide.

. Experience in Pyro metallurgy of copper with various furnaces like Flash

Furnace, Kaldo furnace, Electric furnace, P S Converter, Anode furnace

and Anode Casting.

. Exposure in operations of auxiliary units such as Pelletizing plant, Wet

scrubber, Gas Cleaning Plant with gypsum as byproduct, Ore crushing

plant, two stage scrubbing system (Lime and Caustic).

. Ambitious achievements in field of copper production, streamlining of

production, improvements / simplifications in processes, energy saving

ideas, development of subordinates, team building and training of

employees.

. Lead role in certification process of ISO 9001-2000, ISO 14001, ISO

18001, British 5 Star Safety Certificate, developing 5S culture on field

with positive attitude in employees. Knowledge of 5S, TPM, Six Sigma

skills.

. Project coordination especially Raw Material Handling Systems, Gas

handling systems, Smelter Units as well as erection and commissioning of

systems. Overall management of projects with timely implementation for

successful startup.

. IT skills in MS Word, MS Excel, Power-point, MS Project, ERP System

giving an extra edge as a Management professional.

CAREER HISTORY

6) SOMIKA SPRL - D R CONGO

(Asst. General Manager- Pyro & Hydro Production - till date)

Somika SPRL has a Hydro metallurgy unit for production of Copper and

Cobalt and a Pyro metallurgy unit for production of copper. Pyro

metallurgy Unit owns Electric arc furnaces for production of Black

copper ingots using Malachite as Raw material.

. Have been promoted to post of AGM in April 2013. Expands area of

responsibility to Hydrometallurgy Unit which produces copper cathode

sheets thru electrowinning and cobalt hydroxide by CCD process. Pyro

Unit involves Electric Arc furnaces to produce blister copper ingots.

Have completed following Projects:

a. Arc furnace III - Erection and Commissioning

b. Raw Material Handling System - Erection and Commissioning

c. Raw Material Shed - Civil construction & Shed erection.

. Tin Smelter Project -Heading a Tin Smelter Project (Includes Erection /

Commissioning of Smelter and Laboratory) that is under erection stage

within Somika SPRL premises. The Smelter is a joint venture of MMR

(Mining Mineral Resources-D R Congo) and MSC (Malaysian Smelting

Corporation- Malaysia). It includes two electric furnaces for producing

Tin and Hardhead. The project responsibility includes civil construction

of the smelter, laboratory construction with furniture, designs and

order of furniture, and mechanical erection of the Smelter equipment.

Have also provided valuable inputs to revise the metal pouring systems

and hardhead granulation systems with in-house engineering as well as

designing of a hood over the Tin smelting furnace. The project execution

also includes ordering of suitable equipment for operation; follow up of

activities, equipment order tracking to adhere to the project schedule.

Visited MSC - Malaysia in month of November'12 for having an overview of

the Tin smelting and Refining at the group company. The Smelter Project

is completed in March'13.

5) OMAN MINING COMPANY LLC-SULTANATE OF OMAN

(PLANT METALLURGIST June'08 - May'12)

Oman Mining Company LLC is a Copper Smelting unit with concentrate

treatment capacity of 80,000 TPA. LME Grade 'A' Cathodes are produced as

final product from Refinery.

. Planning monthly production and achieving the set targets Preparation of

production budget, material budget and capital budget. Also preparing

metal balance, environment reports, statistical reports and monthly

reports.

. Condition monitoring - furnace health monitored by shell temperature

measurement and physical inspection of furnaces through inspection

windows during shutdowns,

. Furnace refractory management that includes Electric furnace, P S

Converter and Anode furnace. Modifications in brick designs in line with

brick supplier for improving refractory life. Shutdown planning,

coordination and execution, in depth analysis of furnace linings through

various monitoring methods.

. Improvements in areas of operation by suggestions and successful

implementation of modifications that has given proven results in

increased equipment availability as well as reduction in breakdowns. For

e g. i) Concentrate feed hopper stationary screen was sketch designed

and given to engineering for a vibrating screen. ii) Concentrate storage

bins were provided with cleaning manholes for easy approach and clearing

of any concentrate hang ups.

. Calibration of measuring equipment including weighing bridge through

Ministry of Commerce

and Industry, Environment monitoring around the Smelter Unit.

. The company has been awarded ISO 9001 QMS certification in year 2009 and

have successfully shouldered responsibility for the Smelter department.

Have faced internal and external ISO audits as an auditee.

. Coordination and discussions with engineering contractors for Electric

furnace major repairs, providing technical scope of work to the

contractors, including mechanical jobs.

. With all administrative and technical skills, have always been appointed

by management to fill up leave vacancy of Smelter Superintendent and

have successfully shouldered responsibilities of HOD.

. One of the valuable involvement was in shutdown of Electric furnace

after a campaign of 12 years and replacing 300 tons of refractories.

Responsibilities shouldered include preparing scope of work for

refractory demolition and rebuild, studying of furnace refractory

drawing, supervision of refractory demolition and installation and

engineering scope of work with improvements and modifications. Total

technical supervision and tracking of the shutdown.

4) RUBAMIN SPRL -- D R CONGO - AFRICA

(MANAGER - OPERATIONS April' 2007 -- May' 2008)

Rubamin SPRL (Congo) is a Unit of Rubamin Limited (INDIA) producing

Copper from Oxide Ore from Electric furnace.

. Worked for increase in Copper production that improved by ten percent

and streamlined operation of Electric furnace and Water-Jacketed

furnace.

. Reduced electric furnace downtime and implemented engineering

modifications to improvise production as well as create safer work

practices.

. Reduced electric furnace shutdown time for repair of Tapping blocks by

providing two tapping holes instead of one for alternate operation

during repair of any one of them. This increased plant availability by

avoiding stoppage of complete furnace for repair of one tapping block.

. Manually operated mould trolley was modified to motorized operation to

avoid dependability on manpower.

. Apart from production, engineering job work, material procurement and

contract finalization was carried out in coordination with commercial

department.

. A new Copper and Cobalt project was planned near the operating unit

wherein two electric furnace, one oxygen plant, power station and cobalt

extraction unit set up was in process. With continuing production at the

old unit, activities carried out on the new project included the

following - Erection and commissioning of; Material Handling system, Ore

crushing and screening plant, Slag granulation system, DM Water plant

and Electric furnace erection that included auxiliary facilities like

slag granulation, electrode devices and furnace lining.

. Coordinated purchase of fluxes from local market and government owned

units by personally approaching suppliers.

3) JHAGADIA COPPER LIMITED --GUJARAT - INDIA

(Formerly SWIL Limited)

(DEPUTY MANAGER - PROCESS -- June' 2005 -- April' 2007)

Jhagadia Copper is a Secondary Smelter with rated capacity of 50,000 TPA

copper cathodes using Copper bearing scrap, residues & reverts as raw

material for production of LME Grade A Copper Cathodes.

. Job responsibilities - Consistent operation of Kaldo furnace, P S

Converter, Anode furnace, Cast wheel, Slag Granulation plant and Gas

Cleaning plant.

. Production planning and achievement of the same, shutdown planning and

coordination of activities including mechanical and refractory repairs,

management of manpower and handling various contractors.

. Revival of Gas cleaning plant including scrubber with Lime feeding

system at the Lime plant and gypsum production as by product. The system

was out of operation previously for many years. Lime consumption was

reduced by effective process control as well as gypsum production

started through drum filters. Dust emissions from Kaldo furnace usually

choked the gas scrubbing systems at the collection tank, provision of

draining of the collection tank at regular intervals, improved

availability and effectiveness of the system.

. Other assignments handled - key role in implementing departmental

activities including documentation, record keeping, preparation of

Smelter manuals, work instructions, training of employees for

implementation and achievement of ISO 9001, 14001 and 18001. Also had a

single point responsibility for Smelter department in handling all the

activities related to British 5 STAR Safety Award from British Safety

Council and was successfully achieved by the company.

2) HINDALCO INDUSTRIES LIMITED -- GUJARAT - INDIA

UNIT: BIRLA COPPER

(DEPUTY MANAGER - PROCESS-- Jan' 1997 -- June' 2005)

Birla Copper - a Custom Smelter Unit with copper producing capacity

of 5,00,000 TPA. Cathodes from Refinery are further treated in CCR plant

producing Wire rods. The Sulphur dioxide as by product is treated to

Produce Sulphuric Acid which in turn is used for production of Di

Ammonium Phosphate in subsequent plant.

. Joined as Graduate Engineer Trainee in 1997. Successful achievements

during and after training. Contributed to high production with technical

and management skills. Reached position of Deputy Manager in year 2004

with an excellent performer rating and subsequent merit promotions.

. Efficient shift operation with minimum breakdowns, effective

implementation of on the job trainings like TPM, WCM, and Six Sigma.

. Appreciation by the Birla Copper Management by nominating me for "BEST

EMPLOYEE FOR CHAIRMAN'S AWARD" amongst all Aditya Birla group companies

for outstanding contribution to the company.

. Contributed in achieving production targets

. Always remained a LEADER in Production and coordination of Smelter

operations, through continuous improvements, training employees and team

building.

1) BHAGWATI FOUNDRIES LIMITED -- GUJARAT - INDIA

(MELTING OFFICER -- Aug' 1995 -- Jan' 1997)

Bhagwati Foundries Ltd, a subsidiary of Chicago Pneumatic was largely

into production of Spheroid Graphite Iron (SGI), Cast Iron (CI), Steel

and Stainless Steel castings.

. First company joined after graduation where training period (six months)

was successfully completed for learning various processes in all

departments and subsequently worked as Melting Officer in Melting and

Pouring Section.

. Initiated systematic operation cycles with sand mould casting sequences.

. Appointed as an ISO auditee for Melting section during certification

process.

ACADEMIC QUALIFICATION

B E METALLURGY passed out with distinction marks in August' 1995 from M S

UNIVERSITY (Maharaja Sayajirao University) - Faculty of Technology and

Engineering - Baroda - Gujarat -INDIA

.

TRAININGS / CONFERENCES ATTENDED

1) INDOGULF FERTILIZER & CHEMICALS LTD. Jagdishpur - INDIA

Feb'1997 (Duration - 4 weeks)

Mother company of Birla Copper, visited for Training of 5S and

TPM culture.

2) HINDUSTAN COPPER Khetri - Rajasthan - INDIA

May'1997 (Duration - 4 weeks)

Government owned Copper-producing Company in India. Training at Copper

Smelter

For P S Converter, Anode furnace and Casting operation.

3) PHILIPPINES ASSOCIATED SMELTING AND REFINING (PASAR) -PHILIPPINES

April' 1997 (Duration - 4 weeks)

Training for Flash Smelting process for copper production - P S

Converter, Anode Furnace, Casting Operation

4) MALAYSIAN SMELTING CORPORATION - MALAYSIA

A visit in November 2012 - MSC is the Investor company in African

Smelting Corporation- D R Congo

o 10th INTERNATIONAL FLASH SMELTING CONGRESS - at HELSINKI (FINLAND)

Conference by OUTOKUMPU - FINLAND (Duration - One week)

HOBBIES

. Outdoor Sports - Volley ball, Cricket, Badminton, Lawn Tennis

. Indoor Games - Carrom, Chess, Table Tennis

. Interested in Hindi music and singing Hindi songs.

PERSONAL INFORMATION

. Date of Birth: 09th May 1973

. Citizenship - INDIAN

. Religion Followed - HINDU

. Marital Status - Married - (Children - Two daughters)

. Languages Known: English (fluent), Gujarati, Hindi, Swahili, Arabic

(Basic)

. Computer Knowledge - MS Excel, MS Word, Power point, M S Project

. Passport No: F 7748880

ANKUR RAMCHANDRA AMIN



Contact this candidate