Rajesh Kumar Sarangi
Mobile: +91-977******* Email: ******************@*****.***
Target Sector: POWER
Recognized for Productivity in Deadline-Dependent Environments
Profile Highlights
Operation, Power plant professional with a background that spans around
Commissioning & 6+ years in the Power industry with extensive Power plant
Erection of Coal experience emphasizing Power plant Operation,Commissioning &
based Thermal Erection.
power Plants. Exceptionally well-qualified Energy professional with
Control room sophisticated technical skills and a passion for resolving
operation of complex problems or challenges through innovation.
Boiler and Acknowledged for capacity to mediate conflict, build
Turbine. consensus despite differing agendas, and manage
Worked in DCS of multi-disciplined work teams efficiently.
Emerson Ovation, Characterized as a participative leader, trouble-shooter, and
MaxDNA, Allen persuasive communicator with a keen customer service focus,
Bradley, Micro and a genuine commitment to continuous improvement.
Verse & Siemens Energized by challenges, steep learning curves and
makes. high-pressure deadlines.
Implementing SAP Moved into positions of increased responsibility, eventually
MM module at end authoring and adapting to the latest innovations and
user level. technical advancements, and earning the position of Senior
Power Generation Engineer with an Independent Power Producer (IPP).
reports
Career Graph
> MONNET POWER COMPANY LIMITED, ANGUL,ORISSA
Credited with the best safety implementer award
> Boiler - 2 x1700 TPH PF boiler, single reheat, controlled circulation,
coal fired BHEL make, at 192.2 kg /Cm2 - Press. & Temp - 540 5C .
> Turbine - 2 x 525 MW multi cylinder, Extraction & condensing type-
BHEL make.
Senior Engineer (21'St Jan, 2011 till date)
. Erection of all the Supporting structure, pressure parts and rotary
parts, of 1 x 1700TPH, coal fired, single reheat controlled circulation
PF Boiler.
. Ensuring the Quality of erection along with safety in order to meet
monthly targets.
. Maintaining all IBR documentation required for verification.
. Planning and execution of material handling activities to facilitate
erection.
. Coordinate with manufacturing units for material dispatch.
. Conducting pre commissioning activities like Hydraulic Test in line with
IBR formalities.
. Pre construction activities like construction water supply & crane
assembly.
> WARTSILA INDIA LIMITED
Role - Engineer (Jan 2010 - Jan 2011)
Credited with the performance recognition award
Client: HINDUSTAN ZINC LIMITED
> Boiler - 2 x 320 TPH PF boiler, coal fired BHEL make, at 94 kg /Cm2
- Press. & Temp - 540 5C .
> Turbine - 2 x 80 MW single cylinder, Extraction & condensing type,
BHEL make, &
1 x 4.3 MW backpressure type, Triveni make.
. End to End vendor coordination in testing, commissioning, monitoring of
Boiler & its auxiliaries such as Alkali boil out, Steam blowing, Safety
valve floating & creating BOM.
. Detergent flushing of Critical pipelines.
. End to End vendor coordination in testing, commissioning, monitoring of
Turbine & its auxiliaries like lube oil flushing, steam dumping & rolling
of Turbine.
. Manage & monitor control room operation of Boiler and Turbine.
. Cold Start up, Hot Start up & Warm Start up of boiler and turbine.
. As Shift in-charge I was responsible to lead a team of 15 which includes
a team of control room engineers, field operators, chemists. My role
was:
. Manage the shift schedule.
. Assign work to each team member & monitor their
performance.
. Train the team members for their assigned responsibilities.
. Field inspection from operational point of view including all auxiliaries
of boiler, mill, turbine, Ash Handling Plant, Coal Handling Plant &
compressor.
. Daily & Weekly Management reporting of power generation & consumption.
. Vendor coordination in testing, commissioning of Coal Handling Plant &
its auxiliaries.
. Focusing on optimization and focus on improving efficiency of process
parameters, troubleshooting of operational faults and analyzing causes of
trip for reducing trips.
. Preparing of Standard Operating Procedures (SOP).
. Implementing SAP MM module at end user level.
> SHYAM DRI POWER lIMItEd
Engineer (Jun 2007 to Jan 2010)
> Boiler - 135 TPH AFBC, Veesons make, 54TPH AFBC, CVPL make, coal fired
& 2x38TPH WHRB, TSPL make at 67 kg /Cm2 - Press. & Temp - 490 5C .
> Turbine - 2 x 30 MW single cylinder, Double Extraction type, Hangzhou
make.
. Vendor coordination in testing, commissioning of Boiler & its auxiliaries
such as Alkali boil out, Steam blowing & Safety valve floating.
. Control room operation of Boiler and Turbine.
. Cold Start up, Hot Start up & Warm Start up of boiler and turbine.
. Field inspection from operational perspective which includes auxiliaries
of Boiler, Turbine, Ash Handling Plant, & Coal Handling Plant.
. Knowledge of water chemistry required for boilers, operation of DM & RO
plant.
. Maintenance during shutdown period.
Trainings
. Designing software : AutoCAD, CATIA
. Production software : Master CAM,CNC Part programming
. Attended Leadership Trainings.
Education
. MBA (Continuing) in Power Management from University of Petroleum &
Energy Studies.
. B.TECH in Mechanical Engineering in 2007 from Biju Patnaik University of
Technology.
. Intermediate from CHSE, Orissa in 2003.
. AISSE from CBSE in 2001.
Accolades
. Awarded in Gajajyoti-2005(All India Level Seminar) at JITM,
Paralakhemundi.
. Presented paper in Inova-2005 (All India Level Seminar) at U.C.E., Burla.
. Presented paper in Conaissance-2006 (All India Seminar) at J.N.T.U.,
Hyderabad.
Personal Particulars
Date of birth: 19th April 1986
[pic][pic][pic]