Post Job Free
Sign in

Engineer Project

Location:
Boca Raton, FL
Posted:
August 31, 2013

Contact this candidate

Resume:

JAMES CEDRIC CUELLAR

***Antoinette Lane Apt G Cell:

623-***-****

South San Francisco, CA 94080

*******.*****@*****.***

SUMMARY

Design for Six Sigma Green Belt Certified Systems Engineer with experience

in meeting FAA standards and DO 178B requirements by designing, and

conducting software validation and verification testing. Effective

communicator skilled at writing detailed software requirements in response

to stringent customer needs. U.S. citizen, actively pursuing pilot's

license, with a strong interest in contributing ability to problem solve to

meet customer deliverables, business goals and management objectives.

KEY QUALIFICATIONS

Operating Systems: MSDOS, Windows XP, OS X

Software Languages: Visual Basic, C

Testing Methodologies: Black/White Box, DO 178B, Root Cause Analysis, Lean

Process

Systems Tool: Dimension, Telelogic DOORS, Windchill Collaborative

Environment, Adobe Acrobat, Microsoft Office, AIM

products (FdXplorer, 615A EasyLoader), GEL scripts,

Synergy CM, SCADE, and LDRA.

PROFESSIONAL EXPERIENCE

Aero Engine Control, Indianapolis, Indiana January

2011 - March 2013

Software Verification Engineer

. Responsible for the planning, coordination and execution of requirement

base tests of the small gas turbine FADEC program (DO-178B Level A) for

the Bell helicopter.

. Developed and reviewed requirements based scripts and system requirements

using DO-178B MCDC.

. Assisted in development and reviewed software design requirements

documents to ensure correctness and completeness.

. Generate test scripts using SCADE (Model-based development tool) to

verify DO-178B system requirements.

. Generated/maintained test cases and scripts to conform to the corporate

standards for DO-178B Level A certification. (DOORS, MKS )

. Continually communicated and addressed, issues found during the

testing with the development team and provided suggestions to possibly

correct the potential deficiency based on the requirements assessment.

Problem reports were generated in the change control tool (MKS) to track

issues that were discovered.

Crane Aerospace, Burbank, California September 2007 -

September 2010

Software Engineer

. Responsible for the planning, coordination and execution of requirement

base tests of the Boeing 787 Dreamliner Braking System.

. Developed and reviewed requirements based tests/scripts and system

requirements using DO-178B MCDC.

. Wrote test procedure to verify DO-178B system requirements

specifications.

. Assisted in development and reviewed software design requirements

documents to ensure correctness and completeness.

. Facilitated training for new hires and technical staff on the operation

of systems testing platforms.

. Consistently met diverse project goals by freely sharing design and study

information, maintaining open communications within a small group and

managing scheduling/tracking activities.

GE Aviation, Grand Rapids, Michigan April 2007 -

August 2007

Test Engineer

. Responsible for the planning, coordination and execution of systems

integration testing of the Boeing 787 Dreamliner Common Core System (CCS),

its hardware components and software infrastructure. Additional duties

included capturing detailed information on the test environment and

procedures, to enable others to accurate reproduce problems at remote

development centers and providing off-site support for customers at

aircraft integration laboratories.

. Facilitated training for new hires and technical staff on the operation

of systems testing platforms.

. Improved the test procedure process for the B787 verification effort by

eliminating steps and streamlining the process.

. Wrote test procedure to verify DO-178B system requirements

specifications.

Honeywell International, Glendale, Arizona February

2006 - April 2007

Display Test Engineer

. Test focal that met all deliverables by effectively managing Hawker

Horizon and Control Display System Retrofit projects.

. Responsible for ensuring requirements based testing done overseas uses DO-

178B standards when developing requirement base tests.

. Maintained complex spreadsheets to report status and to meet milestones.

. Maintained earned value spreadsheet to track and report testing status to

management.

. Consistently met diverse project goals by freely sharing design and study

information, maintaining open communications within a small group and

managing scheduling/tracking activities.

. Wrote test procedure to verify DO-178B system requirements

specifications.

Smith's Aerospace, Grand Rapids, Michigan May 2005 -

February 2006

Systems Engineer

. Assisted in development and reviewed requirements to develop a test

platform for external customers.

. Developed detail simulated model of varies systems for external

customers.

. Consistently met diverse project goals by freely sharing design and study

information, maintaining open communications within a small group and

managing scheduling/tracking activities.

. Maintained communication with customers to update them with latest

release of software and hardware changes as information became available.

. Updated user manual for the Common Core System designed for the Boeing

787 program.

Honeywell International, Glendale, Arizona June

2001 - May 2005

Systems and Test Engineer

Earned promotion to full time employee status by developing hardware and

software requirements for automated testing platforms and routinely

collaborating with internal/external customers.

. Met Sino Swearingen SJ30-2 project deliverables and achieved software and

requirements improvements by developing TCAS verification and validation

tests.

. Achieved on-time deliverables of Bombardier Global Express project by

developing detailed system requirements.

. Met Cessna Citation XLS program goals by developing and reviewing TATS

systems verification and validation tests.

. Achieved Gulfstream 550 project timelines by reviewing system

requirements for HUD VGS.

. Met Control Display System Retrofit objectives by developing and

reviewing systems verification and validation tests.

. Achieved HUD VGS certification by developing TATS systems verification

and validation tests.

. Test Lead that met all deliverables by effectively managing Gulfstream IV

and V HUD EVS projects.

. Improved test reliability and efficiency by utilizing lean process

methodologies to review test procedures and verify engineering

requirements.

. Met configuration management requirements by managing test platform

hardware and software databases.

. Improved operating integrity of software programs by utilizing new

testing methodology using internal test platforms.

. Achieved 20% decrease in electronic review time using Six Sigma tools to

design lean software requirements and testing process.

. Increased intern and technical staffs' proficiency with operating

aircraft simulators by delivering comprehensive on the job training

program.

. Consistently met diverse project goals by freely sharing design and study

information, maintaining open communications within a small group and

managing scheduling/tracking activities.

. Developed and reviewed requirements based tests/scripts and system

requirements using DO-178B MCDC.

. Wrote test procedure to verify DO-178B system requirements

specifications.

EDUCATION

DeVry University, Phoenix, Arizona

Bachelor of Science in Electronic Engineering of Technology - June 2001

PROFESSIONAL DEVELOPMENT

. Design for Six Sigma Trained/Certified

. Pilot Training (15+ hour of flight school)

. Visual Basic

. Ground School

. Instrument Training



Contact this candidate