Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Balasore, OR, India
Posted:
August 31, 2013

Contact this candidate

Resume:

CURRICULUM VITAE

PRASANTA KUMAR NAYAK

E mail:ab6aas@r.postjobfree.com

ab6aas@r.postjobfree.com

Mobile No: 91-889*******

Looking for a challenging career in the field of CFBC Boiler Operation in THERMAL POWER

PLANT COMMISSIONING,OPERATION,MAINTENANCES & PROJECT

MANAGEMENT.Capacity of Boiler 155 TPH

Total Years of Experience: More than 8 years.

Total Years of Experience In Operation & Maintenance Of Thermal Power Plant : Above 5 years.(

Operation & maintenance of WHRB, AFBC BOILER and CFBC (155 TPH) boiler & auxiliary

and 40MW, 20MW & 50MW steam turbine unit.

Total years of Experience in Project &Commissioning Of Thermal Power Plant :3 Years,

(Commissioning of 2X155 TPH cold cyclone CFBC boiler & 2X50 MW steam turbine unit.)

Executive Summary

An expert professional with Diploma in Mechanical Engineering having around 8 years of

experience in Commissioning, Operation, Maintenance & Project of thermal power station.

Complete operation & maintenances of steam generator unit (WHRB, AFBC & CFBC) with

its auxiliary & steam turbine unit & its auxiliary as well as BOP of unit.

Fully comfortable with DCS OPERATING system.

Complete knowledge of pre commissioning activity and commissioning activity of complete

unit including steam generator unit (2X155tph CFBC) and turbo generator unit (2X50 MW) as

well as BOP of complete unit.

Understanding of all aspects governing operational activities and up to date knowledge of

latest technological advancements, regulations/ guidelines and statutory compliances in the

industry.

Sound knowledge hydraulic test, refractory dry out, alkali boil out, steam blowing,

safety valve floating, trial run of equipment and protection & interlock testing and in

turbo generator unit like oil flushing, vacuum pulling, over speed testing and

protection & interlock testing in different commissioning activity of steam generator

unit like etc.

Capable of taking quick decision during plant emergency during the shift.

Prepare & review shift wise MIS report with plant GM and evaluation of different plant

performance parameter.

PROFESSIONAL EXPERIENCE

Organization : FACOR POWER LTD ( 2X50 MW ), Bhadrak, Orissa

Designation : SR. ENGG (operation)

Duration : From Oct 2010 till date

Website : www.facorgroup.in

Company profile: Facor group incorporated in 1955 is one of the India’s largest producer &

exporter of ferro alloys with a annual production capacity 65000 ton charge chrome &

250000 ton chrome ore. The Group’s First power project is developed by Facor Power Ltd

which is a subsidiary of Facor Group is a coal based thermal power plant of 2x50 MW at

Bhadrak, Orissa.

Current Expansion Project: The Group plan to expand in power sector and to capitalize

on the opportunity in this sector. Its major expansion plans are

45 MW thermal power plant at Garividi, Andhra Pradesh

600 MW super critical power plant at Chhattisgarh.

ROLES & RESPONSIBILITY

(SR.ENGG Operation)

Initially involve in pre commissioning and commissioning activity of (155x3) TPH Make

ThyssenKrupp COLD CYCLONE CFBC BOILER & (2X50) MW STEAM TURBINE Make

BHEL as well as BOP of the unit.

Complete knowledge of cold, warm & hot start up of overall unit.

Monitor critical operational parameters of CFBC Boiler including its water & coal quality, LOI

as well as for STG unit including sp. Steam consumption, turbine heat rate etc.

Monitor the TG loading & coordinate in load distribution including export to SLDC .

Prepare the shift wise MIS report and present the same to plant operation GM

PREVIOUS COMPANY PROFILE:

Organization : BHUSAN STEEL & POWER LTD (20MW STG, 12MW

BPTG3*9MW TB), Meramundali, Dhenkanal.

Designation : ENGINEER (operation)

Duration : From 14th October 2009 to 16th October 2010.

ROLES & RESPONSIBILITY (Engineering Operation)

Worked as assistant shift in charge of 20 MW STG,12MW BPTG & 3*9MW TB unit.

Complete operation & maintenance activity of 3*75 TPH AFBC boiler unit..

Monitor critical operational parameter of overall unit & take corrective action to avoid break

down time of overall unit.

Prepare shift wise MIS report and present the same to operation GM.

Prepare job list & bar chart of planned shutdown of the unit with spare parts requirement & its

availability & manpower management and try to complete the shutdown of the unit within

definite time & budget.

Organization : BHUSAN POWER & STEEL LTD (40MW ), Thelkuli,Sambalpur.

Designation : ASST. ENGINEER (operation)

Duration : From 1st April 2007 to 10th October 2009.

ROLES & RESPONSIBILITY (Engineering /Mechanical/Operation)

Worked as assistant engineer of boiler DCS operation of 40 MW unit.

Complete operation & maintenance activity of 4*55 TPH WHRB boiler unit.

Comfortable with cold startup, hot startup & emergency condition.

Monitor critical operational parameter of overall unit & take corrective action to avoid break

down time of overall unit.

Prepare shift report and present the same to operation Shift in charge.

Organization : M/S TEST METAL ENGINEERING PVT TLD.

Designation : ENGINEER (Maintenance)

Duration : From 10

th

February 2004 to 30th March 2007.

Worked as Maintenance Engineer in power plant. Responsible for Maintenance daily &

annual maintenance of our different clients at different sites from 10th February2004 to 30th March

2007.

EDUCATIONAL DETAIL

2003 Diploma in Mechanical Engineering

10th from Board of Secondary Education, Orissa

2000

Personal Dossier

Father’s name : Mr. Kartikeswar Nayak

Date of Birth : 08th April 1985

Religion : Hindu

Marital Status : Married

Nationality : Indian

Address : Sergarh,Balasore, Odisha.

Linguistic Abilities: English, Hindi & Oriya

Notice Period : 3 Months

Declaration

I, PRASANTA KUMAR NAYAK, hereby declare that the information furnished above is true to

the best of my knowledge

Place: Balasore (Prasanta Kumar Nayak)

Date:05/05/2013



Contact this candidate