Anup Mallick
C/o Ashoke kr.Mallick
Hospital Para,
Memari, Burdwan
W .B.-713146.
Mob No: 980-***-****
Email ***********@**********.***
10th January.1974.
Date of Birth:
Sex / Marital Status : Male/Married.
Father s Name /Occupation: Late Sh. Abhaya Pada Mallick
Permanent Address: C/o Ashoke kr. Mallick
P.O. Memari, Distt.: Burdwan,
W est Bengal- 713146.
Professional Education: 1992-1995 Diploma in survey(Civil)
W est Bengal Survey Institute,Bandel,
Distt.: Hoogly.
(Secured: 71%)
Bachelor Degree in Civil Engineering
(Perusing)
Computer Literacy: W orking Knowledge of MS Office,
W orking knowledge of Auto-CAD
Language: Hindi, English, Bengali, Tamil.
17+YEARS WORKING EXPERIENCE AS BELOW:
A) A) J UNE 2011 to Till Date: Hindusthan Construction Limited,
Working as a Manager Survey (Civil) in HCC at Kashang H.E.P Stag-01, (195MW) on river Kashang
& Karang in Himachal Pradesh.
Client: H.P.P.C.L(Himachal Govt.)
Project Profile:
Kashang H.E.P.Stage-01 is a project of 195 MW, located on the river Kashang in Distt. Kinnaur,H.P, India.
Ø The major part of the Project, which is awarded to HCC, is 200 m long Trench wire,disilting Basin, 100 m
Power Channel, 2km D shaped HRT,360m Long Balancing Re servoir, two number of underground 55
Degree Inclined Pressure shafts (500m long each), Three numbers of Under Ground Penstocks,92x16x30
m Under ground Power House with three no s of unit,88x15.5x 25m under ground Transformer Hall,200 m
underground TRT,190m long underground Cable Tunnel.
Ø Civil & Hydro-mechanical works for Power House.
Contract Value : Rs 300 Cores.
Nature of Work:
Leader of the Survey Team of Kashang H.E.P Stage-01.
Manage to all survey staff for their requirement.
Initial survey, Layout Plan, Contour map, control point fixing Traversing.
Excellent command in advance Survey Instrument like Total Station & Trimble makes Profiler(S6).
Profile marking of tunnel, all related survey works.
Preparation of all cross section of related works & su bmitted to Billing Section.
Survey of 55 Degree Inclined Pressure Shaft (500m x 2Nos.) with raise climber, Leaser Beam and Trimble
S6 Profiler.
Preparation of x-section and Calculation of over breaks in underground tunnels and submitting to clients for
approval of Geological over breaks.
B) A) March 2010 to June 2011: Hindusthan Construction Limited,Mubai.
Working as a Manager Survey (Civil) in HCC at Teesta H.E.P.Stage VI(Lot-2 & 4), (500MW) on river
Teesta in East Sikkim.
Client: Lanco
Project Profile:
Teesta H.E.P.Stage VI(Lot-2 & 4), is a project of 500 MW, located on the river Teesta in Distt. East
Sikkim, India.
Ø The major part of the Project, which is awarded to HCC, is, 13 km Horsh Shoe Shaped HRT, two number
of underground vertical Pressure shafts Three numbers of Under Ground Penstocks, Under ground
Power House with three nos of unit, under ground Transformer Hall, TRT,Switch Yard.
Ø Civil & Hydro-mechanical works for Power House.
Contract Value : Rs 800 Cores.
Nature of Work:
Leader of the Survey Team of Teesta H.E.P Stage-6.
Manage to all survey staff for their requirement.
Excellent command in advance Survey Instrument like Total Station Machine.
Profile marking of tunnel, all related survey works.
Preparation of all cross section of related wo rks & submitted to Billing Section.
Execution of Civil work like Crusher Plant, Batching Plant and other Misllenious work.
C) Nov 2008 to March 2010: Energy infratechPvt.Ltd.,Gurgaon,Hariyana.
Working as a Dy.Manager (Civil) in Energy infratech Pvt.Ltd. at T eesta H.E.Project, (1200MW) on
river Teesta in North Sikkim on B.O.T. basis.
Client: Teesta Urja Ltd.
Project Profile:
Teesta H.E.Project is a mega project of 1200 MW, located on the river Teesta in Distt. Mangan,North Sikkim,
India.
Ø The major part of the Project, which is awarded to Teesta Urja Ltd., is two number of underground Inclined
Pressure shafts, six numbers of Under Ground Penstocks,(14.2 km long 7.5 m diameter horse shoe
shape) concrete line Head Race Tunnel & 160 m deep,15.50 m diameter surge shaft.
Ø Civil & Hydro-mechanical works for Power House.
Contract Value : Rs 5000 Crores.
Nature of Work :
Leader of the Survey Team of Teesta III site.
Manage to all survey staff for their requirement.
Initial survey, Layout Plan, Contour map, control point fixing.
Excellent command in advance Survey Instrument like Total Station Machine.
Profile marking of tunnel, all related survey works.
Preparation of all cross section of related works & submitted to client.
Initial & Final cross section of hill road works.
Calculation of over breaks in underground tunnels.
D) OCT 2002 TO OCT2008 GAMMON INDIA LIMITED, MUMBAI
W orking as an Assistant Manager-1 (Civil) in Gammon India Limited,Mumbai,India for their Parbati Hydro
Electric Power Project(Stage-II), is a 800 MW Power Project on river Parbati at Himachal Pradesh.
Client: National Hydro Power Corporation Limited.
Project Profile:
Parbati Hydro Electric Project is a mega project of 800 MW, located on the river Parbati in Distt. Kullu,
Himachal Pradesh, India.
Ø The major part of the Project, which is awarded to Gammon India Ltd., is two number of underground
Inclined Pressure shafts, four number of Under Ground Penstocks,(6.638 km long 6 m diameter horse
shoe shape) concrete line Head Race Tunnel &130 m deep,17m diameter surge shaft.
Ø Civil & Hidro-mechanical works for Power House.
Contract Value : Rs 603 Crores.
Nature of Work :
Initial survey, Layout Plan, Contour map, control point fixing.
Excellent command in advance Survey Instrument like Total Station Machine.
Profile marking of tunnel, valve house, surge shaft & all related survey works.
Preparation of all cross section of related works & submitted to client.
Initial & Final cross section of hill road works.
Survey works related to Tunnel Boring Machine.
Preparation of Monthly Running Account Bills including Quantity Survey and lessoning with clients.
Preparation of sub- Contractors Bills working on back to back basis.
Calculation of over breaks in underground tunnels.
ERP implementation for Billing Module.
E) NOV 1998 TO OCT 2002 GAMMON INDIA LIMITED,MUMBAI
W orked as assistant Engineer (Civil) in Gammon India Limited, Mumbai, India for their S.L.B.C. Lift
Scheme project. Pump House Project on river Krishna at Andhra Pradesh.
Client: A.P.S.E.B (A.P. Genko)
Project Profile:
S.L.B.C. Lift Scheme Project is a mega Project on the river Krishna in Andhra Pradesh, India.
Ø The major part of the project, the water of the river is divert through the tunnel & lifted through Pump into
the cannel for the purpose of Irrigation.
Ø 1.5 km long tunnel,6 m diameter concrete lined Head Race tunnel with 50x25 m with 4 m height five
numbers Draft Tube; 60x 25 m with 60 m depth Pump House & five numbers pump unit ; 80 m long,3.5
m diameter circular in 45 degree in five numbers delivery shaft.
Contract Value: Rs. 80 Cores.
Nature of works:
Profile Marking of delivery shaft, Draft Tube, Layout of Surge Pool & Pump House & other related works.
Calculation of over breaks in under ground Pump House, Surge Pool, and Delive ry Shaft, Draft Tube etc.
Joint measurement s with clients & preparation of Monthly running Account Bill of sub contractors.
Verifying volumes of excavation, lining, etc., with the help of Auto-CAD.
Skills:
Able to work with Auto CAD.
Excellent command in Advance Survey Instrument like Total Station Machine, Auto Level etc.
F) NOV 1996 TO 1998 TRAFALGAR HOUSE INDIA LIMITED.
W orked as survey Engineer (Civil) in Trafalgar House India Limited, Chennai, India for their Tuticorin Port
Trust at Seven Cargo Berth Project, Tamil Nadu.
Client:
Tamil Nadu Port Trust.
Project Profile :
Tuticorin Port Trust Project is a Mega Project on the Indian Ocean in Tamil Nadu, India.
Ø This Project includes is a 730 m long Jetty with 400x300 m &15 m depth reclamation area.
Ø This Project includes 150x 40 m & 10 m depth Shallow Draught Berth.
Contract Value : Rs. 150 Cores.
Nature of work:
Taking initial & final Sounding & Probing of sea bed.
Positioning of Drilling Platform over the sea.
Positioning of Dredging Platform over the sea.
Giving alignment & Level of Bed Frame.
Giving alignment of placing precast block under the sea.
Giving Layout of concrete area as well as interior details.
Giving Layout of reclamation area.
Layout of Pavement Blocks of reclamation area.
G) SEPT 1995 TO NOV 1996 TRAFALGAR HOUSE INDIA LIMITED
Worked as Survey Engineer (Civil) in Trafalgar house India Limited, Chennai, India for their S.J.K.
Steel Plant at Tadipatri in Andhra Pradesh.
Client: S.J.K. Steel Plant.
Project Profile: S.J.K. Steel Plant is a Mega Project in Andhra Pradesh, India
.
Nature of work:
Layout of Wagon Tunnel, wagon Tripler, C.R.S. Building etc.
Giving Alignment of Wagon Tunnel & Wagon Tripler, C.R.S. Building etc.
Other related survey works.
Taking initial level of ground.
v Last Salary Drawn: Rs.10.5 lacks per annum CTC