PRESENT ORGANIZATION MARUTI COAL CLEANING & POWER LTD (300MW PF BOILER).
POST:-ASSIST MANAGER MECH (OPERATION SHIFT INCHARGE) IN 300 MW
POWER PLANT
DURATION: - 29.05.2012 to till date.
MY TOTAL EXPERIENCE
17YEAR EXPERIENCE(13year in power plant operation and 4year experience in maintance work in
210mw and 500mw pf power plant boiler and auxiliary( such as air heater coal mill fan) and chp
crusher
Equipment Handling Experience
BOILER
Thermal Power Plant, Capacity 451*2=902 TPH, 141 kg/cm^2 Pressure, Main stream and reheat
steam temperature of 540
Turbine:
135*2=270mw steam turbine (HURBINE) is a high pressure, intermediate reheat single cylinder,
single rotor, impulse and condensing type, turbine
Also we(shift in charge) are handle Ash handling plant
MY JOB RESPONSIBILITY
1 My main object operation of thermal power plants, and balance of plant with optimum
efficiency.
2 Supervision of Cold startup, hot startup, Warm startup, Normal operation and emergency
handling and safe shut down of unit.
3 Minimization generation cost.
4 Supervision plant performance in shift and power generation as per target and achieved desired
PLF.
5 Guide to desk Engineer for safe operation and at the time of emergency operation.
6 Analysis of trouble shooting and arresting it by coordination of electrical,C&I and mechanical
maintenance
7 Proper maintain safety standard to under worked manpower
8 To coordinate different department and associate man proper utilization.
9 Reduction of down time of machinery/equipment by preventive maintenance
10 To improve the efficiency of the plant by Monitoring and regular operational parameter of
plant.
11 To help in addressing in maintenance problems arising.
12 Load scheduling of plant for next day,to see of plant condition
13 To assist in addressing in maintenance problems arising. Monitoring any abnormality
equipment such a My main object operation of thermal power plants, and balance of plant with
optimum efficiency.
14 Supervision of Cold startup, hot startup, Warm startup, Normal operation and emergency
handling and safe shut down of unit.
15 Planning & implementing the preventive & breakdown maintenance schedules; conducting
failure investigation analysis to identify gaps & take corrective measures so as to reduce
equipment downtime & maximize plant availability.
16 Monitoring and optimizing processes, troubleshooting problems of Boiler Feed Pumps, Cooling
Tower pumps, Gate Valves & Globe Valves.
17 Directing, leading and motivating workforce; imparting continuous on job training for
accomplishing greater operational effectiveness/ efficiency.
18 Responsible for operation of boiler water-treatment, Cooling tower and other utilities to
maintain the quality of steam and water.
19 Responsible for proper isolations of equipment/system for preparing permit to work, sanction
to work, and Access permits.
20 Coordination with Maintenance staff in resolving the plant problems.
21 Within the sphere of power plant administration I am responsible for administration of permit
to work system, reporting of plant incidents, production of generation statistics and log sheets.
22 Responsible for bringing back the station to normal in station blackout as soon as possible in a
safe and efficient manner.
23 Monitoring of overall station performance, monitoring of equipment’s performance which
includes steam turbine compressors, steam turbine condenser, Heat recovery boiler, cooling
tower etc for any degradation and to take corrective action for the improvement of station PLF
and efficiency.
24 Coordination with field operation engineers in monitoring field activities and instructing them
as and when required.
25 Responsible for the safety and fire protections in the plant area and periodic checking for their
healthiness.
26 Inspections of steam drum internals.
27 Drum and Main steam line safety valve internal inspection.
28 Checking of Steam, Water & Auxiliary Turbine Piping as per IBR Standards.
29 Pre-commissioning checking of fans,Pump, Piping and its supports,duct supports,
30 Checking of starting permissive and trip logic of boiler.
31 Inspections of Main stream line and boiler supports inspection and set the spring hanger
supports.
32 Inspections of turbine lube oil and control oil, overhead oil piping and acid cleaning of above oil
system piping.
33 Checking of starting permissive and tripping logic of Turbine.
34 Reduction of down time of machinery/equipment by preventive maintenance
35 To assist in addressing in maintenance problems arising. Monitoring any abnormality
equipment such as Boiler, Turbine and their auxiliary, of plant,.
36 To make overhouling job list(equipment defact list) s Boiler, Turbine and their auxiliary, of
plant,.
PAST EXPERIENCE :-
1 Worked in M/s Prakash Industry LTD.Champa (C.G.) (AFBC Boiler & Turbine Operation) from 04
April 2000 to 25 May 2012 (12 Years) as Sr. Engineer power plant
2 Worked in M/s U. B. Engineering Ltd. (PF Boiler Maintenance) from 07 May 1996 to 30 Sep.1996 (5
Months) as Maintenance supervisor.
3 Worked in M/s Precision Engineering (Coal Mills and Coal Crusher maintenance) from Jan. 1997 to
15 April 1999 (2.4 years) as Maintenance supervisor.
4 Worked in M/s Mitsui Babcock Energy (India) Pvt.Ltd (Maintenance of Boiler & its auxiliary ) from
20 April 1999 to 22 Oct. 1999 (6 Months)
PAST WORK EXPERIENCE
1. I had worked 2year as turbine and boiler field engineer
2. Operating knowledge of 25mwX04 simens make impulse reaction turbine.
3. Operating of AFBC BHEL make 110TPH boiler and its working pressures 100Kg/cm. and temp
480+
4. Operating of knowledge of ion exchange principal DM. plant and their capacity 12 TPH and
25TPH X 2NO
5. Overhauling & Maintenance of B.H.E.L. make 500 MW and 210mw Boiler such as (super
heater water wall economizer and steam cool wall and their header)
6. Maintenance of coal crusher machine in NTPC its. Crushing capacity 1250 T/Hr. crushing size
200 mm. to 20 mm.
7. Maintenance of roller pulverized coal mill in NTPC Korba in 500 MW. Coal mill pulverized
capacity 70 T/Hr. per coal mill in 200 MW coal mill pulverization capacities 450 T/Hr. per coal
mill
8. Doing Both type(tubular and rotary type) Air heater maintance
9. Overhauling & Maintenance of F.D P.A FAN
10. Knowledge of Valve maintenance of pressure parts
11. Operating of 10 mw wasting house make impulse turbine operating of 10 mw wasting house
make impulse turbine operating of 10 mw wasting house make impulse turbine.
12. Operating of was heat recovery boiler BHEL making 46.8TPH X 02no & it’s working
pressure42.kg/cm & temp 410’C.
11Commissioning knowledge of waste heat recovery boiler
PRESENT COMPANY PROFILE:-
ISO, 14001:2004 & OHSAS 18001 certified company, a reputed .coal cleaning & power company in
Dipka Korba (C.G.), with 270 MW cfbc boiler running and 300 MW PF Boiler under project. it will be
complete to march2014.
TECHNICAL QUALIFICATON
Boiler Operation Engineer : B.O.E. LIECENCE NO58/2012from Chhattisgarh Boiler Board
DIPLOMA : Diploma in Mechanical Engineering
Board : M.P. Board of technical education Bhopal
Year of Passing : 1995
Degree B.A : from gurughasidas vishvidalay
PERSONNEL PROFILE:
MOTHER’NAME : LATE SMT PHIRATIN KASHYAP
Father’s name : LATE SHRI D.L.KASHYAP
Date of Birth : 01.07.1975
Nationality : Indian
Sex : Male
Marital status : Married
Address : BHAGIRATHI KASHYAP
ARYAN COLONY DIPKA BATARI
POST- DIPAKA DISTIC KORBA C.G
DECLARATION :-
I hereby declare that all the statement above are true and correct to the best of my knowledge
and belief.
Thanking you Signature of
candidate
Date - …11/08/2013 (Bhagirathi