CURRICULUM VITAE
AMRESH KUMAR SHRIWASTVA
Engg - Mechanical
Email:-************@*****.***
ph.no:-083********
OBJECTIVE:
To make a breakthrough in the field of project execution, facilitating
the generation of power by optimum utilization of existing resources
and latest innovative ideas in a cost-effective manner.
SUMMARY:
> Currently working with Lanco Solar Energy Pvt Ltd as an Engineer
From 15 May 2012 till now.
> Total 4+ years of Experience as a Mechanical Engineer. Expertise in
field of execution & Erection work of Boiler Pressure Parts,
structural's, piping and overall knowledge on Coal based Thermal Power
Plant, Solar PV Plant, Solar Thermal Power Plant.
ACADEMIC QUALIFICATION:
> Post Graduate Diploma Course in Thermal Power Plant from NPTI Nangal
in 2009-10 Batch with 82.33%.
> Bachelor of Technology in Mechanical Engineering from Rai Foundation
College.
University : Pt.Ravishankar Shukla
University, Raipur (C.G.)
Aggregate : 79.47%
> Higher Secondary School Certificate 12th from J.L.N.College Dehri on
Sone (Bihar)
Board : Inter Council Bihar
Aggregate : 65.22%
> High School Certificate 10th from Govt. High School Basahi (Bihar)
Board :
Bihar school examination Board, Patna
Aggregate : 59.28%
PRESENT STATUS
Company: Lanco Solar Energy (P) Ltd. (Lanco group)
Designation: Engineer
Duration: May 2012 to till date
> Photovoltaic Power Plant (3X25 MW), Dhule (Maharashtra).
> CSP-SOLAR THERMAL POWER PLANT (2 X 100 MW), ASKANDARA (RAJASTHAN).
. COMPANY PROFILE:
. LANCO solar energy pvt. Ltd is Company of LANCO group. LANCO
is one of the fastest growing integrated infrastructure enterprises of
India, operating across a synergistic chain of strategic business
units comprising Power, EPC, Renewable, Resources, Non-Power
Infrastructure, Property Development and CSR. LANCO is fast emerging
as one of the top three private sector power developers in India with
2092 mw under operation, 7153 mw under construction, and 11070 mw of
projects under development. LSEPL is focused on commercializing
alternate technologies for green and efficient energy generation
systems such as solar thermal and solar photovoltaic (PV) Power
projects.
JOB PROFILE:
> Erection of Module Mounting Structures with proper alignment.
> Preparation of checkpoints in structure erection & punch points for
work executed by agencies.
> Coordination with other departments i.e. Civil & Electrical for the
various changes as per the site situation to provide the smooth
running of Project.
> To achieve & monitor over all work progress of erection as per the set
schedule by planning dept.
> To ensure smooth working, Mutual co-ordination, and co-operation among
erection groups and with all concern involved in erection activities.
> To be in touch with planning section so as to get required documents
needed for erection and to follow up for any details required.
> To prepare Review Notes for Monthly and Weekly co-ordination meetings.
> To give feedback to all superiors about site activities and progress
details related to erection as and when required or as per feedback
schedule.
> Responsible for handling the stores and update the inward materials
and to highlight critical items in advance to ensure sequential
erection.
> To make aware all those involved in erection regarding Safety and
precautions to be taken during course of erection.
EXPERIENCE SUMMARY
> Organization: M/s KVK ENERGY
Project: 3 X 350 MW KVK Nilachal Thermal Power plant,
Cuttack, Orissa.
Period: Aug 2010 to May 2012.
Position: Engineer project.
Responsibilities: Erection alignment & Inspection of Boiler Pressure
parts, Critical Piping, Non Pressure parts like
Boiler structure, Air Preheater, Ducting.
. COMPANY PROFILE:
KVK Energy has proven expertise in power includes conventional as well
as non-conventional sources of energy such as Natural Gas, LSHS, Coal
/ Coal rejects, Biomass etc. Currently executing projects of about
1500 MW under various location.
JOB PROFILE:
> Erection alignment & Inspection of Boiler Pressure parts, Critical
Piping, Non Pressure parts like Boiler structure, Air Preheater,
Ducting, Oil system & Coal piping.
> Ensure planning, scheduling, monitoring & timely execution of erection
of Boiler.
> Proper co-ordination with civil agencies to get civil foundations for
erection, sequentially and priority wise.
> Organization: M/s Aarti Steel and Power Ltd. Athagarh, Orissa
Project: 50 MW CFBC BOILER.
Period: July-2008 to July-2009.
Position: Graduate Engineer Trainee
Responsibilities: Operation of CFBC Boiler (200 TPH).
. COMPANY PROFILE:
. M/S Aarti Steel and Power Ltd.. Athgarh (Cuttack),
Orissa. Having 90 MW (40mwCPP and 50mw Ipp), with A.F.B.C. boiler,
Cethar Vessels make, Capacity 115 TPH, 87 ata, 515 0C. and Waste Heat
Recovery Boiler (W.H.R.B.) 52 TPH with same pressure and temperature
for Siemens make TG and C.F.B.C Boiler 200 tph&92 kg/cm2 make wuxi
(CHINA).
COMPUTER PROFICIENCY:
> Languages : C, C+
> Package : M.S.-Office, Auto CAD
> Operating System : Windows 98/2000 NT/XP/Vista/7
INDUSTRIAL TRAINING:
> Two Week Simulator training of 210 MW thermal power plant in NPTI
Badarpur based on the IVth unit of Badarpur Thermal Power Station, New
Delhi as a part of PGDC Curriculum.
> Three Week scheme tracing training in Indraprasth Power
Station(2x67.5MW), New Delhi as a part of PGDC Curriculum.
> Four week On Job Training on operation and Four Week On Job Training
on Maintenance in GGSSTPP (6X210MW), Ropar, Punjab as a part of PGDC
Curriculum.
> Two week vocational training in Bhilai Steel Plant, Bhilai
(C.G.).
EXTRA CURRICULAM AND ACHIEVMENTS:
> Won first prize in a quiz organized by School.
> Won first prize in chess championship organized by university.
PERSONSL PROFILE:
Name : Amresh
Kumar Shriwastva
Father's Name : Mr. Manindra Prasad
Shriwastva
DOB : 20 jan 1983
Sex : Male
Marital Status : Single
Languages Known : English & Hindi.
Permanent Address : Amresh kumar Shriwastva
Kandihra, Pipra, Kudra
Kaimur,
Bihar
Pin co.
-821108
Phone
No- 083********, 086********,
PLACE:
DATE:
(Amresh kumar shriwastva)
Reference: -
Mr. P K Das (Executive Director - KVK Nilachal Thermal Power Pvt Ltd)
Mb No. - +919*********
Mr. P Khosal (Sr. DGM - LANCO Solar Energy Pvt Ltd)
Mb No. - +918*********