Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Singapore, 568427, Singapore
Posted:
August 15, 2013

Contact this candidate

Resume:

RESUME

NAME Park, Song Hee Korean Identification 670***-*****

Number 11

Date of Birth 17 Aug., 1967

Address Blk 62 #10-08 Mei Hwan Dr Goldenhill Park cond.

Singapore.

Contact No. 65-8518-0457(mobile) E-mail ab4o0u@r.postjobfree.com

Permanent 312-109 Hwigyeong-dong Dongdaemun-gu Seoul

address

Career Summary

Extensive experience in Project management positions with over 12 years. 18

years solid Experience semiconductor industry included project direction,

Process development, device engineering, Product development and Yield

improvement. Also, control the schedule, project budget control and

management of staffs.

Key Skill & Capabilities

V Semiconductor Process Design

V Semiconductor Process Development

V Semiconductor Process Qualification

V Low Yield Analysis and Yield Enhancement plan and achievement

V Quality control at process

V 6 sigma Green belt & Black Belt Certificate

V SPC control to Process Data

V Process and Design FMEA

V Semiconductor Device DC Characterization and Device Engineering

V Semiconductor Marketing Team managing

V Semiconductor Marketing Team support

V Semiconductor New Process Line up Planning

V Project management

V Product management

V Control of Manufacture at Foundry Product

V Schedule management

V Risk management and Assessment

V Management of different culture member

V FA Analysis of SEM and FIB

Education Background

Choong Ang High School (Feb. 1986)

Bachelor of Engineering majored in electronics engineering Myongji

University (Feb. 1994)

Career Background

Hynix Semiconductor inc. www.hynix.com

tel 82-31-630-**** fax 82-31-630-****

18/July/1994 ~30/Nov./2004 research laboratory new device part / Principle

research engineer

Dongbuhitek www.dongbuhitek.co.kr

tel 82-2-3484-2888, 82-32-680-**** fax 82-2-3484-2818

30 Nov., 2004 ~ Sep. 2010 Display division /Process development team /

Deputy General Manager

Globalfoundries www.globalfoundries.com

tel +65 6362-2838 fax +65 6362-2938

Oct. 2010 ~ Nov. 2012

Silicon Manufacturing partners Pte. Ltd. process integration team, located

in Singapore/ MTS

Certificate

Certificate:

Ridership for Manager (01 Feb 1998 ~ 14 Feb 1998) Hynix

Project Control (12 Mar 1998 ~ 22 Mar 1998) Hynix

Doing important things first (Flanklin Covey) (01.Aug., 2005 ~ 30.Sep.,

2005) Korea leadership center

Marketing Essence (01 Oct., 2005 ~ 31 Oct., 2005) Dongbu Edulife

Industrial property (Patent) basic course (12 June, 2006 ~ 16 June, 2006)

Korean Intellectual Property Office

eMBA Vivid business administration (01 Mar., 2008 ~ 31 Aug, 2008) HUNET

Ms Project (04 May,2008 ~ 10 May, 2008) Dongbu Edulife

Kairos Course Certificate (Jan. 2013 ~ Mar 2013)

Patent certificate: the United States patent

200********/ SRAM device and method for manufacturing the same

200********/ Static random access memory and method for manufacturing the

same

200********/ NON-VOLATILE MEMORY DEVICE AND METHOD OF FABRICATING A

200********/ Method for fabricating a high voltage dual gate device

200******** / Method for fabricating ferroelectric random access memory

device with

Summary of Main Duties by Project

Sep. 2010 ~ Nov. 2012

- Globalfoundries, Silicon Manufacturing partners Pte. Ltd.

Process integration and Yield Enhancement team, located in Singapore.

- position : Member of technical staff

(accomplishments)

- 0.18um Embedded SONOS Process improvement planning and

management.

- 0.18um ICRF product improvement planning and management.

- 0.18um 1.8V+3.3V+ SONOS ICRF device engineering, Process Qual

and SONOS IP Qual achievement.

- 0.18um 1.8V+3.3V ICRF Product mass production.

- 0.18um 1.8V+3.3V ICRF Product yield improvement.

- 0.14um EEPROM embedded SOC Process and Production.

- 0.14um EEPROM embedded SOC Process Qual and Product Qual

achievement.

Nov. 2004 ~ Sep. 2010

- Dongbu hitek, Display operation division process development

team, located in Bucheon

- position : Deputy General Manager

(accomplishments)

- Marketing team management for sales

- Technical marketing management for sales

- 0.18um, 0.13um, 0.11um DDI Process & Product Planning

- 0.18um, 0.13um, 0.11um DDI Process & Product Team management

- 0.13um 1.5V+5.5V+30V DDI device engineering and Process

Qualification achievement.

- 0.13um DDI Process Option MTP(1Poly EEPROM) Cell achievement

- 0.13um DDI Process Embedded SRAM(2.03um2) Cell achievement

- 0.18um DDI Product mass production management.

- 0.18um Large Panel Process development (13.5V, 20V)

- 0.11um 1.2V+5.5V+30V device engineering and Process

Quaification achievement

- 0.11um DDI Process Option MTP(1Poly EEPROM) Cell achievement

- 0.11um DDI Process Embedded SRAM(1.4877um2) Cell achievement

- 6 sigma Green Belt grant

- 6 sigma Black Belt project complete

- ISO9001, ISO14000, TS16949 follow up.

June 2002 ~ Nov. 2004

- Hynix Memory Business Unit new element Part, located in Icheon

- Position : Principle research engineer (Sinner project Manager)

(accomplishments)

- FeRAM Tech-Line Planning and Process management

- P-RAM Tech-Line Planning and Process management

- 0.25um FeRAM Process development and device engineering.

- 0.18um FeRAM Process development and device engineering.

- 100nm P-RAM element development and device engineering.

April 1997 ~ June 2002

- Hynix System IC Business Unit process development team 3,

located in Cheongju

- Position : Principle Research Engineer ( project manager)

(accomplishment)

- 0.18um ADI Process development, device engineering, Product

development and Yield improvement

- 0.35um DDI Proces development, Product development and Yield

improvement

Include device engineering: 0.35um logic device+13.5V LDMOS+

7.5V Half VDD EDMOS + 10V EPROM Mixed Processing.

- 0.35um OTP Process development and element development

April '95 ~ April '97

- LG semiconductor System IC Business Unit process development team

3, located in Cheongju

- Position : Senior Research Engineer

(accomplishments)

- 0.5um FlatRoom Process development, device engineering, Product

development and Yield improvement.

- 0.5um MCU Process development, device engineering, Product

development and Yield improvement

- 0.5um NOR Flash device engineering, Product development

18 July, '94 ~ April '95

- LG semiconductor process 1 team PI Part, located in Cheongju

- position : Research Engineer

(accomplishments)

- 4M DRAM, 16M DRAM mass production maintenance and management, low

yield analysis and yield improvement work

- 256k SRAM, 1M SRAM mass production maintenance and management,

low yield analysis and yield improvement work

I certify the above statement is true.

Signature

[pic]



Contact this candidate