Carlos Lamont Williams

**** **** ***** ****

Raleigh, NC 27610

919-***-**** (C) 919-***-**** (H)

*.*.***********@*****.***

SUMMARY OF QUALIFICATIONS

. Prepare and maintain equipment before and after the completion of

manufacturing operations.

. Planner- Scheduler planning and executing the installation and

commission on complete systems

. Extensive knowledge and experience testing and maintaining a variety

of telecommunications, electrical, electronic and mechanical systems.

. Proven experience in reading mechanical and electrical wiring diagram

or product specification to determine and meet job requirements

. Install, test, repair and modify equipment including telecommunication-

switching and transmission products, fiber optic manufacturing systems, and

semiconductor high vacuum reactor systems.

. Use, calibrate and repair electrical and mechanical test equipment.

Replace faulty components per established corporate standards and

guidelines.

EXPERIENCE

AMCOR, YOUNGSVILLE, NC April 2012 to Present

Amcor a $10B international conglomerates that manufactures a wide range of

packaging solutions for a diverse number of industries. Products and

industries such as, polyethylene terephthalate containers for healthcare,

pharmaceutical, and chemical industries respectively.

Injection Blow Molding Extrusion Technician

Responsible for developing and executing best processes for injection, blow

molding and extrusion (EBM) equipment for manufacturing processes.

. Converts EBM equipment from one process setup to another and perform

equipment inspections and checks between setup changes, as necessary, or

as directed.

. Operate EBM equipment in accordance with GMP and company guidelines.

. Perform equipment upgrades and parts changes and installations per

guidelines or as directed.

. Work collaboratively regarding platforms scheduling, go-ahead decisions,

preventative maintenance activities, and provide input regarding

additional purchasing decisions

. Produce samples and make adjustments to process parameters to achieve

required manufacturing and QA objectives.

. Use interpersonal skills, teamwork and cooperation, active listening

skills and understanding to achieve the highest level of efficiency and

productivity.

COVIDIAN HEALTHCARE, RALEIGH, NC May 2011 to March 2012

Covidien is a $10+ billion healthcare pharmaceutical products and solutions

developer. Equipment Setup Operator

Equipment Setup Operator responsible for the setup and operation of the

filling line with minimal down time in accordance with FDA,EU SOP's and

quality controls applicable to that operation, making adjustments for size

and/or product as necessary. Monitor equipment during batch operations and

perform 100% visual inspection to insure quality and safety are

maintained.

. Perform all staging,setup, and cleaning using water for injection WFI, autoclave and sanitize production operating equipment.

. Monitor production equipment during operations.

. Ensure that production equipment is safe and operated safely.

. Prepare documentation in accordance with regulatory and cGMP

requirements.

. Provide assistance to management in coordinating maintenance

activities.

. Prevent waste of product and/or components by operating the equipment

in an efficient manner.

. Maintain production schedules.

. Work with groups in initiating and implementation of programs such as

continuous improvement (Lean) and autonomous maintenance (TPM).

JOHNSON CONTROLS INC., RTP, NC July 2007 to August

2010

A US $11 billion international company with headquarters in Milwaukee,

Wis., is a global market leader in automotive systems, building controls

and integrated facility management.

Planner- Scheduler

Function as on-site Planner- Scheduler to plan, execute, and complete

control systems projects in the Utilities Department for Glaxo Smith Kline.

Performs and delegates tasks as required to execute and fully complete

projects including: hardware design, system programming, installation

coordination, system and network commissioning and project closeout. Also,

have responsibility for the financial results of assigned projects

including: costs, project billings, and collections.

. Actively pursues selling change orders

. Maintains profitability goals and positive cash flow.

. Perform hardware and software installation, design, and programming

. Communicate design and system operational information to customers,

staff and subcontractors.

. Evaluate contractual scope of work and impact bulletins, field

directives or scheduling changes.

. Manage the selection, ordering, budget and delivery schedule of

materials to be procured

. Secure pricing from outside vendors and suppliers, mechanical and

electrical subcontractors

. Oversee subcontractor payment and billing processes.

. Ensures installation is in accordance with literature and project

requirements.

. Manage and complete device loading, verification, and commissioning

. Validate complete system functionality and resolves issues with

subcontractors and others to ensure proper operation.

. Provides accurate project as-built and commissioning documentation.

. Supervise and Provide technical assistance to subcontractors.

. Ensures that delegated tasks are done accurately, on-time, billed,

within budget and within scope of the contract.

. Communicates project status to management as required and provides

forecasts of revenue, costs, and gross margin.

. Develops project plans and coordinates the required resources to

ensure timely and cost effective installation and completion of assigned

projects.

. Performs site-specific training for owner/operator on the total system

in full or with assistance.

JOHNSON CONTROLS INC., RTP, NC August 2004 to July

2007

Operations & Maintenance Specialist III

Monitor and Operate Chillers,Boilers,Air Compressors and Pumps for Glaxo

Smith Kline Facilities.

Performs a variety of service and repair work in a mechanical and

electrical/electronic skill area. Provide direction and training to less

experienced O&M Specialists. Work from drawings and schematics, blueprints,

job layouts or by verbal instruction and operate a variety of tools and

machines to complete assignments.

JOHNSON CONTROLS INC., RTP, NC June 1999 to August

2004

Telecommunications Engineering Technician

As Telecommunications Engineering Technician my responsibilities are

troubleshooting, maintenance, and repair of all Nortel telecommunications

and transmission facilities and systems at GlaxoSmithKline facilities in

the Research Triangle Park, NC and surrounding areas.

. Perform hardware and software installations and upgrades on Nortel

Meridian Option 81, Option 61 and Option 11 at customer premise.

. Work with GTE during installation, commissioning and acceptance

testing of TransportNode OC-48, OC-12, and Superloop systems

. Work with customer and Nortel Technical Support teams to ensure system

and network perform per specification

. Analyze traffic studies and implement network changes as required

. Use vendor's tools and documentation to effect hardware and software

upgrades as well as repairs.

JOHNSON CONTROLS INC., RTP, NC May 1998 to June 1999

Facility Management Engineering Technician III

As a Facility Management Engineering Technician my responsibilities are to

provide facility management and support services in the areas of

maintenance and surveillance for all electrical, electronic,

telecommunications and facility systems for Johnson Controls Fortune 500

corporate customers.

. Operate, analyze, and monitor automated facility equipment on the

Bailey, Metasys, and Crown systems, following defined guidelines and

procedures

. Generate and prepare system performance and operational trending

reports, which are used by Johnson Controls and clients to evaluate

performance and ensure contractual commitments are being met and exceeded.

. Assist system vendors during maintenance, calibration, and validation.

. Perform maintenance and repair of critical systems during on and off-

hour shifts.

. Implementation and execution processes and procedures which improving

facility performance and control facility costs.

CREE RESEARCH RTP NC Aug 1995 to May 1998

Semiconductor Technician

Responsible for operation and maintenance of High Vacuum Semiconductor

reactor equipment used to manufacture semiconductor devices. Perform

diagnostic test on reactor electronic sub-assemblies using various test

equipment such as multimeters, potentiometers, and ATE associated with

final test. Assist in the production, development, and fabrication of

semiconductor components. Use PC applications to generate reports. Work

interactively with engineering staff to develop, verify, and document test

procedures. Also, responsible for quality control and ISO compliance

within my functional area.

SUMITOMO ELECTRIC LIGHTWAVE Sept. 1994 to Aug.

1995

Fiber Optics Manufacturing Technician

Manufacture and test high-density single-mode telecommunication fiber optic

assemblies using a variety of manufacturing, test, and quality verification

equipment. Read and use manufacturing procedure documents to fulfill

customer order to specifications. Interface with manufacturing engineers

and management to identify faults, perform diagnostics and initiate

corrective actions.

NORTEL INC. RTP, NC Nov. 1991 to Sept.

1994

Telecommunication Systems Technician

Provide technical assistance and support to management, engineers and

technicians in the operational testing of Northern Telecom DMS-100 central

office switching systems. Duties include the construction of customize

cable assembles from engineering specs, performing operational system tests

on major and minor subassemblies of various Input Output Equipment using

computer automated systems test equipment and inspection of product for

quality compliance using statistical process control procedures. Duties

also include but are not limited to the handling of materials and customer

order tracking.

EDUCATION AND TRAINING

Over 1000 hours of specialized training and OJT in a multitude of areas.

June 1979 Graduated William G. Enloe High School

Sept.1979-Dec.1980 Raleigh School of Data Processing, Computer

Programming.

September 2000 Nortel Meridian Ops and Maintenance

February 1992 Computer Automated Testing, NTI Tech. Training

Center

February 1992 DMS-100 Technical Training, NTI Tech. Training

Center

August 1991 Team Directed Workforce Organization. NTI

July, 2008 Building Operator Certification, Durham Technical

Community College



Contact this candidate