Family Name: Ahmed Given Name (s): Adel Mahmoud
Year of Birth: 13.06.1977 Nationality: Egyptian
Profession: E & I Engineer
Language(s): English and Arabic
Educational B. Sc in Communications Engineering, Alexandria University,
June 1999.
PURPOSE & SCOPE:
Jobs at this level are responsible for understanding the Scope of Work and
carrying-out duties related to preparation and issue of engineering
deliverables for project implementation.
My duties comprise also preparation of scope of work, review detailed
engineering deliverables, purchase requisitions, FAT inspection,
construction Supervision and commissioning of electrical & instrumentation
systems.
Duties & responsibilities include and is not limited to the following:
. Receives allocated duties, FEED and studies Scope of Work to understand
what is required.
. Interfaces with other disciplines to ensure integration of activities.
. Prepares specifications, data sheets and undertakes calculations to meet
requirements of allocated tasks.
. Co-ordinates with the Drafting Office coordinator for the checking and
issuing of drawings.
. Prepares the PR, including the Bill of Materials; specifications;
datasheets/drawings; inspection test requirements; and vendor data
requirements for review by Senior Engineer.
. Undertakes technical evaluations of vendor offers and issue TBE to ensure
PR's technical details are satisfied.
. Undertakes pre-engineering site surveys in order to provide input
information to facilitate detailed engineering. . Reports on work
progress, bringing to notice potential problems or delays and recommends
solutions.
. Raises/receives queries where there is lack of clarity. Interfaces with
other disciplines to ensure integration of activities.
. Review detailed engineering deliverables and various developed documents
in order to meet the specification and international standards.
. Review the PR, including the Bill of Materials; specifications;
datasheets/drawings; inspection test requirements; and vendor data
requirements.
. Undertakes technical evaluations of construction works execution
complying with the approved drawings, specification and standards.
. Applying QA/QC inspection and fill out the relevant documents. (SQ, NCR
Etc).
. Provides reports on project progress against the approved plans and
budgets, bringing to notice potential problems or delays and recommends
solutions.
. Creates "as built" documents and provide project data registry.
. Knowledge with international standard related to E&I equipments and
systems.
. Worked with international projects specifications PB (GOC), Total
(OPERCOM, ICAP), Shell DEP, Technip Specs ..etc.
. Competence in using standard industry discipline related software.
Abroad activities:
1. FAT witness for LV Switchgears @ SIEMENS - LEIPZIG, GERMANY.
2. FAT witness for MV Switchgears @ SIEMENS - AMORA, PORTUGAL.
3. FAT witness for 33 KV GIS Switchgear @ SIEMENS - FRANKFURT, GEMANY.
4. FAT witness for fiber optic cable @ LEONI KERPEN- STOLBERG, GERMANY.
5. FAT witness for Neutral earthing resistor @ Metal Deploy - MONTBARD,
FRANCE.
6. FAT witness for AC/DC UPS @ BORRI - AREZZO - ITALY.
7. FAT witness for MV switchgears @ ABB - Czech Republic.
8. FAT witness of power transformers @ Schneider-electric - Turkey.
References & codes: -
IEC, IEEE, ISA, NFPA, API, BS, ISO ..etc.
Past Experiences;
Currently :
From : Jan 2011 till Now
Employer : National Petroleum Construction company (NPCC).
Position Held: Lead E&I quality Engineer.
Before : : Interim Third party gas facilities - state of QATAR
Project /
Location.
Time Period. : June. 2010 / Till Dec. 2010.
Client. : Dolphin Energy Limited
Concerning : Germanischer Lloyds - GL.
Company.
Position Held Senior E&I project Engineer.
Review all the engineering documents MRs, TBE, SOW, specifications,
schedules, drawings, data sheets, layout,
Review VDRL, FAT, ITP, .etc.
Raise TQ and queries, technical evaluation of offers, quotations.
Review HAZOP recommendations and close out report.
Review SIL review and integrity and protection layers of the shutdown
system implementation
Review the PR, including the Bill of Materials; specifications;
datasheets/drawings; inspection test requirements.
site surveys and data gathering of existing facilities to establish and
identify the actual requirements
Implementation and execution of the instrumentation activities.
Undertakes technical evaluations of construction works execution
complying with the approved drawings, specification and standards.
Provide technical support on all engineering as arising from
Instrumentation discipline during the construction phase of Projects.
Applying QA/QC inspection and fill out the relevant documents. (SQ, NCR
Etc).
Provides reports on project progress against the approved plans and
budgets, bringing to notice potential problems or delays and recommends
solutions.
Creates "as built" documents and provide project data registry.
Complete the mechanical completion certificates and Ready for
commissioning dossiers.
Executing the commissioning procedures, loop checks and run tests and
prepare ready for startup dossiers.
Completion of project documentation and hand over procedures.
Project / : Strategic Gas Transmission pipeline - state of QATAR
Location.
Time Period. : Sep. 2009 / June 2010
Client. : Qatar Petroleum - QP
Concerning : Germanischer Lloyds - GL.
Company.
Position Held E&I Senior project Engineer.
. Review enquiry documentation from client together with Scope of Work to
understand what is required.
. Review specifications, data sheets and undertakes calculations to meet
requirements of allocated tasks
. Applying ITP, procedure and method of statement for Temporary & permanent
cathodic protection systems (sacrificial anodes- Impressed current).
. Reviewing procedures and methods of statement for FOC communication
systems.
. Review procedures and methods of statement for instrumentation and
control system & ESD valves, PSV valves ... etc.
. Pre-commissioning preparation, execution according to QP specifications
& method of statement in conjunction with the international standards.
. Pre-commissioning dossier review and approval.
. FOC laying, splicing, connection and OTDR testing.
. Temporary sacrificial anode Cathodic protection installation &
implementation.
. Permanent impressed current Cathodic protection installation &
implementation.
. Stations instrumentation & valves.
Project / : Laffan Refinery Project / Ras Laffan Industrial city
Location. - state of QATAR
Time Period. : Sep. 2008 / Aug. 2009.
Client. : Qatar Gas Company - QG
Concerning : Germanischer Lloyds - GL.
Company.
Position Held E&I Senior PMT Engineer.
. Review enquiry documentation from client together with Scope of Work to
understand what is required.
. Review specifications, data sheets and undertakes calculations to meet
requirements of allocated tasks
. Applying ITP for HV & LV switchgears, MCCs, HV & LV motors, HV & LV, HV &
LV transformers (dry, oil filled), HV & LV cable system,
telecommunication, fiber optic cables, earthing, lighting, cathodic
protection, UPS & DC systems.
. Applying ITP for instruments, Fire & gas, ESD, DCS, control & ESD
valves, PSV valves ... etc.
. Pre-commissioning preparation, execution according to TOTAL PRECOM &
ICAPS as integrated solution in conjunction with the international
standards.
. Pre-commissioning dossier review and approval.
. Project Content:
. 33 Kv/22 Kv/6.6 Kv/ 0.4 Kv main station and Substation.
. UPS systems, DC systems, interface panels, fire fighting system, HVAC,
PDPs.
. HV & LV motors and transformers.
. Fire Fighting system (water - foam) and pumps (diesel - electric).
. Earthing and lighting systems.
. Cathodic protection system (sacrificial anodes- Impressed current).
. Instrumentation devices (Indicators, transmitters, analyzers, detectors.
. Fire & Gas systems.
. DCS Installation & Pre-commissioning.
. ESD system.
: Ha`py plant development TAURT LNG train project &
Project / Akhent offshore plant
Location.
Time Period. : Nov. 2007 / June 2008.
Client. : Gulf of Suez Oil Co. (GUPCO)
Concerning : BP British Petroleum.
Company.
Position Held E&I PMT project Engineer
. Supervise the construction work, pre-Commissioning, Activities to the
related Power works.
. Inspection of electrical & instrumentation activities and applying the
all type of test procedures according to GOC & BP ETP.
Project Content:
. Complete Installation supervision & inspection Of a new LV Power
Substation containing 380 V MCC, UPS system, interface panels, fire
fighting system, HVAC system ... and the related power/control cables
Laying, Termination and Connection.
. Complete Installation supervision & inspection instruments, Fire & gas,
ESD, DCS...Etc for instrumentation activities.
. Offshore Cathodic protection system for platform
. Onshore Cathodic protection system for tanks and underground pipes.
. Installation of The Power / Control main Distribution Panels.
. Fabrication and installation of the cable trays and conduits.
. Tie-in to the existing power system.
. Installation of the lighting, grounding and lightning systems.
. Pre-commissioning & commissioning of MCC, MCC, UPS system, DC system,
interface panels, fire fighting system, HVAC.
. Fire Fighting system (water - foam) and pumps (diesel - electric).
. Fire & Gas systems.
. DCS Installation & Pre-commissioning.
. ESD system.
. Calibration of instruments.
. Telecommunication system & fiber optic cables.
Project / : Al Zaafarana FPSO.
Location. Al Zaafarana offshore Platform
Gemsa Onshore field.
Gemsa offshore platform.
Time Period. : June 2003 / Oct. 2007
Company : Gemsa Petroleum Company (GEMPETCO)
Position Held. : E & I Project Engineer.
Project / : Al Zaafarana FPSO.
Location. Al Zaafarana offshore Platform
Gemsa Onshore field.
Gemsa offshore platform.
Responsible for the routine maintenance duties plus the smooth, efficient
running of the electrical supply, looking after all electronic and electric
equipments / systems, keeping up planned maintenance and spare lists for
machinery, compressors, transformers, motors, switchgears ...etc. Supervise
carrying out repairs, maintenance and inspection and diagnosis of faults to
component level. Responding immediately to equipment breakdowns and system
shutdown in addition compilation of written defect reports including
supporting documents, schematics and diagrams. Maintaining up-to-date
systems records. Inspection of equipments and systems for defects.
Performing and recording results of investigation, testing and restoring to
service. Installation modifications and recommending improvements
Main modifications and special projects have been implemented when I was in
charge: -
1. Upgrading of the LV power network.
2. Design the onshore / offshore lighting system.
3. New Fire Fighting system for oil storage tanks (water - foam) and pumps
(diesel - electric).
4. Gemsa field upgrading project (Replacing of the pneumatic control system
By PLC (Schneider) and SCADA in addition to replacement of all
instrumentations.
5. Telemetry system between FPSO and the production platform.
6. Synchronization, parallel with load sharing, demand and shedding
functions panels.
7. Replacement of submarine electrical & fiber optic cables.
Project / : Suez Refinery Petroleum Company
Location.
Time Period. : July. 2002 / May. 2003
Client. : Suez Processing Petroleum Co.
Main : Petromaint
Contractor.
Concerning Petromaint.
Company.
Position Held. : E & I Engineer.
. Review of engineering drawings, shop drawings.
. Supervision of construction, pre- commissioning Activities related to
electrical &instrumentation works of the plant. Power Distribution Panel,
HVAC system, UPS System, cabling... And instrumentation installation,
calibration, ESD, DCS, PLC Panels ...etc.
Project / : Acid Flare Plant - AMOC.
Location.
Time Period. : April. 2002 / Jun. 2002
Client. : Alexandria Mineral Oil Co. (AMOC)
Main : Petromaint.
Contractor.
Concerning Petromaint.
Company.
Position Held. : Instrument Engineer.
. Supervision of construction, pre- commissioning Activities related to
instrumentation works of the plant. And The Acid Flare & Knock out Drum,
Air Compressors
. The work included review of engineering drawing, supervision of
fabrication and installation of equipment / instrument supports,
installation of cable trays, laying, glanding, Termination of cables,
testing of panels, UPS System, ESD, DCS, PLC Panels etc ... routing and
. Installation of tubing, pressure testing of tubing etc and finally
preparation of mark up / as built drawing.
Project / : Gemsa offshore platform
Location.
Time Period. : Jan. 2002 / March 2002
Client. : Gemsa Petroleum Co. (GEMPETCO)
Main : Petromaint
Contractor.
Concerning Petromaint.
Company.
Position Held. : E & I Engineer.
. Installation of sacrificial anodes Cathodic protection system.
. Complete Installation supervision & inspection of a new LV Power
Substation containing 380 V MCC and the related power/control cables
Laying, Termination and Connection.
. Complete supervision for replacement of production facilities
instruments.
Location. : Akik Gas Plant
Time Period. : April. 2001 / Dec. 2001
Client. : APACHE Petroleum Corporation.
Main : HANOVER Petroleum Construction Company.
Contractor.
Concerning Petromaint.
Company.
Position Held. : E&I Engineer.
. Review of engineering drawing
. HVAC system
. Installation of 460 V / 60Hz - 240 V / 60 Hz - 110 V / 60 Hz Power
Distribution Panel.
. Installation of impressed current Cathodic protection system.
. Installation cable trays
. Installation JB's & instruments
. Laying multi core cable & secondary cables
. Installation of Hydraulic system
. Installation (F&G,RTU,WHCP) panel
. Hook-up for cables, instrument &termination
. Test & check system Final review of marked-up / as-built.
Project / : A.N.R.P.C Naphta Reformer Complex Project
Location.
Time Period. : April. 2000 / December. 2000
Client. : ANRPC -Alexandria, Egypt.
Con. Company. TECHNIP - Italy
Position Held. : Instrument QC engineer.
. Applying ITP, procedure and method of statement for instrumentation and
control system & ESD valves, PSV valves ... etc.
. Pre-commissioning preparation, execution according to approved
specifications & method of statement in conjunction with the international
standards.
. Pre-commissioning dossier review and approval.
: Electrical Heat Tracing For Wax & Asphalt Storage
Project Tanks.
Time Period. : July. 1999 / April. 2000
Client. : Alexandria Petroleum Co. (APC)
Main : Klopper / Electromach.
Contractor.
Position Held E & I construction Engineer.
. Supervise the construction work, pre-Commissioning Activities to the
related elect. / Instrumentation works.[pic]