Seth J. Bilodeau
Amesbury, MA01913 ************@*****.***
cell: 978-***-****
Work Experience
Kodiak Corporation Lawrence, Ma 4/2010- present
Foreman-Salem, Ma. present
Partial Demolition of an existing concrete bridge culvert over the tidal forest river and retrofitting precast footings, walls and roof to the existing pilings and floor structure.
1.1 million project value
Supervisor- Whipple rd bridge over the Shawsheen river -Tewksbury, Ma 2012
Completed Demolition of the bridge deck and pouring of new abutment caps
Placement of prefabricated bridge deck and pouring of deck slab
500 thousand project value
Supervisor- Rourke bridge rehabilitation Lowell, Ma. 2012
Replacement of multiple structural parts of the temporary bridge structure including a large percentage of the bridge deck panels using a Barge in the Merrimack river
Foreman-Ipswich, Ma 4/2010-2012
Accelerated demolition and reconstruction of a triple span bridge over the MBTA tracks
responsible for all aspects of bridge demolition and reconstruction
8million project value
Barstow Building and Remodeling Medway, MA 10/2008-4/2010
Carpenter Foreman-Norfolk, Ma.
Builder of a high end custom home
Responsible for all subcontractors onsite, construction meetings, planing,
layout, and job closure
1.75 million project value
Kodiak Corporation Lawrence, MA 5/2006-9/2008
Carpenter Foreman-Lawrence, MA 2008
Completed demolition and replacement of a single span bridge over the canal
Placement of prefabricated double lane with sidewalk steel bridge and railings
1.1 million project value
Carpenter Foreman-Gloucester, MA 2007-2008
Accelerated Demolition and reconstruction of a single span bridge over the Good Harbor marsh Responsible for Pile placement, Reconstruction of bridge abutments, Beam Placement, tying of structural rebar, deck placement, End post placement and forming of walls on the bridge
1.8 million project value
Roads Corporation Billerica, MA 1998-2005
Supervisor- Blackstone River - Grafton, MA 2005
Responsible for pre-construction meetings and job site preparation
Administered tree removal and erosion control
1.6 million project value
Supervisor-Rt. 290 Bridge-Auburn, MA 2004-2005
Completed two bridge rehabilitation including deck, parapet walls, wing walls, end post replacement
Constructed retrofit of structural steel and installation of two crossover lanes
Responsible for milling and paving of two miles of roadway eastbound and westbound
4.7 million project value
Carpenter Foreman/Supervisor -Arlington, MA 2002-2004
Rte. 2 Bridge over MBTA and Bikeway
Completed demolition of existing 3 span bridge
Finished replacement with single span integral abutment bridge with 3 miles of pile
Quality assurance and quality control job
4.1 million project value
Laborer/Carpenter Manchester, NH 1998-2001
Rtes. 93 &101
Completed 9 bridge rehabilitation
Constructed 7 bridge decks, brush curb, end post and railing replacements
Executed building of two complete bridges with new structural steel
Quality assurance and quality control job
Education
Amesbury High School 9-12 general studies
Plymouth State College 112 credits Business management
Additional Skills and certificates
10 hr OSHA training
3 hr Work Safe New England traffic management training
3 hr Work Safe New England trenching safety training
3 hr Work Safe New England confined space training
8 hr lead paint safety course