Multifaceted construction/engineering professional with broad experience in structural/architectural

construction, design/build management, and project management from Owner’s and Contractor’s side.

Involved in preconstruction for all phases of healthcare (OSHPD), education, corrections, electronic

manufacturing, and public agencies. Direct experience in estimating, scope preparation, procurement,

contracting and project delivery during construction phase. Experience in construction of new buildings,

seismic/structural upgrades, renovations, and tenant improvement projects.

EXPERIENCE

Jacobs Global Building

2009- 2012

Rideout Memorial Hospital Addition- Marysville, Ca.

Project Manager-Project is a $240 million, 254,000 square foot, 6 story

hospital addition. Involved in preconstruction estimating, design review, and

preliminary design work of new structure (exterior wall systems). Prepared

structural steel and concrete scopes, and the work required to phase in new

design with existing occupied hospital space. Involved in interior MEP overhead

coordination work utilizing BIM. Also participated in Preconstruction Review of

San Francisco General Hospital and several Kaiser Hospital Projects.

2002-2009 Swinerton Builders

UC Davis Medical Center SESP, Sacramento

Project Manager- Involved in pre-construction and construction of $400 million,

465,000 s.f. Surgery and Emergency Services Pavilion Project. Prepared

estimates for Structural and Architectural scopes in preconstruction. Project was

built under OSHPD jurisdiction. Extent of project involved Emergency Rooms,

Radiology, Burn Unit, Clinical Lab, and 24 Operating Rooms. Preconstruction

involved writing bid packages for exterior skin scopes (precast and aluminum

windows), and structural core packages. Also involved in preparation and over

sight of interior wall and ceiling scopes. Interior work also required participation

in overhead MEP coordination process with BIM utilization. Oversaw the work

of supporting project engineering and administrative staff.

2000-2002 Clark Construction Group

Capitol Area East Complex, Sacramento

Project Manager- Project was $225 million design/build office complex.

Responsible for entire scope of exterior skin work from design through

completion. Exterior wall work included precast cladding, stone on metal stud

framing, and seven different curtain wall systems. Extensive coordination among

the different systems and the building structure was required. During course of

project, involved in several lump sum bids for Federal Prison, State University

Buildings, and Office Facilities.

1997-2000 Turner Construction Co

Hearst Memorial Mining Building, UC Berkeley

Project Engineer (12/98-6/2000) On-site on seismic rehab/historical restoration

project. Responsible for structural work. Involved in planning, scheduling and

buying out design/ build perimeter shoring and load transfer work for base

isolator installation.

California State Seismic Project, Sacramento

Construction Coordinator (10/97-11/98) On-site owner's representative for

seismic upgrade project at Preston School of Industry in Ione. Also involved in

the review of structural reports and prepared conceptual estimates for seismic

upgrades on existing State Buildings.

Intel GSS Site Service Contract Folsom, Ca

Project Engineer (2/97-9/97) Administrative and supervisory work for interior

revisions and semi conductor testing equipment installation projects.

1995 - 1997 Paragon Project Management

Document Control Engineer

Tower II - U.C. Davis Medical Center, Sacramento

Project is 14-story structural steel frame building with precast concrete and

curtain wall exterior. Project value over $80 million. Four separate bid packages

were issued on this project. Company was consultant to UCDMC and Architect.

Chief Estimator

Corcoran II State Prison

Lead Estimator for the Corcoran II Design Development, Intermediate

Construction Documents, and Construction Document Design Packages.

Estimated work included all design disciplines for the six major building

packages.

1993 - 1994 SD Deacon Corp.

Project Manager

Sierra View District Hospital, Porterville

6000 sq.ft. Emergency room addition. Project was broken into five phases,

including remodeling of existing facilities. Project also includes new 1800kw

electrical distribution and a new medical gas bulk storage and distribution system

for emergency room and 110,000 sq.ft. hospital addition.

1987 - 1992 Allen L. Bender, Inc.

Estimator/Project Manager

Managed projects and participated in estimates for projects ranging from a value

of $200,000 to over $20,000,000. Majority of bids were public bids. Bidding

responsibilities involved concrete and wood frame take-offs and procurement and

analysis of subcontractor bids.

Prior experience with Continental-Heller Corporation and Caltrans.

Registered Civil Engineer- Ca., No. 54118

EDUCATION California State University Long Beach

Bachelor of Science, Civil Engineering



Contact this candidate