Post Job Free
Sign in

Manager Manufacturing

Location:
Faridabad, HR, 121006, India
Salary:
10000
Posted:
August 06, 2013

Contact this candidate

Resume:

ARUN KUMAR SINGH

Date of Birth *st Jan.****

H.No J-111, Sector 10

Faridabad, Haryana, Email: **************@*****.***

INDIA

(M) +91-987*******

To obtain leadership position in Manufacturing Company

preferably in Oil & Gas, Polyurethane, and Polymer Processing.

Professional Synopsis

1 Global Citizen, successfully setting new Manufacturing Facilities in various part of the

world.

2 Highly Experienced Professional imbibed with high professional ethics, diverse & prominent

skill set profusely amalgamated with “Every dollar spent is spent professionally” rich

industry experience in Procurement, Engineering, Manufacturing, Extrusion, Production and

Fabrication.

3 Technical Diligence to Company Goal, My generalist skills to relate to the implementation

of End to End Plant activities in polyurethane maufacturing operations & organization .

4 Polyurethane processing expert almost three decades of an extensive experience in

Projects, Plant operations Procurement, fabrication & Assembly.

5 Top management lead of managing Projects, engineering & development,Manufacturing

and Plant operations and ensuring most efficient consumption norms, quality standards,

optimum utilization of the available resources etc.

6 Successfully worked Green Projects their erection & commissioning across the illustrious

career path.

7 Proficiency in resource planning, deployment, vendor management, cost control, material

management and maintenance & operational control of manufacturing unit.

8 Lead supplier negotiations to attain the best Total Cost of Ownership (TCO), quality, and

delivery. Support cost reduction initiatives with suppliers.

9 Oversee, identify and direct negotiations for formal strategic supplier contracts (including

TCO, inventory, payment terms, and other key provisions) to support the company’s

business objectives.

10 Monitoring progress of developments and fast tracking implementation zero outage, reduce

cost, increase machine uptime and improve throughput facilities maintenance and upkeep

and liaise with Business Unit Management Team to agree ongoing priorities.

11 Proficiency in improving operational performances & efficiency with impressive record of

yielding consistency,

12 Pride to be processed a volume spray of Rigid Polyurethane Foam spray 50MT / Day, Yields

100% of the Plan and Managed Production &Delivery of Pre-insulated pipe worth of USD 240

million $ projects

13 Lead, the prestigious project of Cairn Energy India, world longest heavy crude oil pre –

insulated pipeline(800KM),Got honored & rewarded for especially in Accenture inputs to

process development, scale-up & pilot plant studies in the field of Pipe insulation & coating

synthesis lead role in manufacturing of Pre-Insulated pipes .

Core Competencies

Procurement, Production& Planning & Quality Management, Operation& delivery,

Team development and Clint support.

1 Overseeing production related tasks including planning, control & trouble shooting. Adapting

process improvement measures to maximise capacity utilization and setting up production

targets and achieving the planned production targets.

2 Addressing personnel related issues for escalating productivity and operational efficiency and

imparting continuous training, ensuring a high level of quality/ safety consciousness, &

discipline among the shift workers.

3 Scheduling material procurement plans and ensures optimum inventory level. Requisitioning

material, controlling material based on machine loading & orders received.

4 Managing and mentoring a dynamic team of purchasing professionals, Establishing and

maintaining measurable performance metrics for all levels of procurement activitiesManages

materials savings, initiatives in line with procurement profit plan and overall business

objectives. Negotiating with the vendor contracts as needed to support the critical business

needs.

5. Product conceptualization, definition, planning & execution throughout the product lifecycle,

Including gathering and prioritizing product & customer requirements, defining the product

Vision, working closely with engineering, sales, marketing & support teams to ensure revenue

and customer satisfaction goals are met.

Operations & Maintenance

1 Proactively identify areas of obstruction/ breakdowns and take steps to rectify the equipments

through application of trouble shooting tools.

2 Planning and effecting preventive maintenance schedules of various machineries and

instruments to increase machine up time and equipment reliability.

Process Enhancement, Procurement & Cost Control

1 Effective resource planning for optimising man & machines utilization.

2 Identifying & executing cost saving techniques/ measures and modifications to achieve

substantial reduction in O&M expenditures and work within the budget.

3 Manage the seven step sourcing process including team development, communications,

planning, Strategy deployment, negotiation, award and implementation

Quality Management

1 Improving Quality / Productivity / Reliability at manufacturing with continual improvement.

2 Ensuring adherence to quality standards, implementing stringent quality control systems and

reduce rejection level & rework through continuous improvement and up gradation of system

like ISO 2001.

Organizational Experience

Director (Plant & Projects)

Elegant Polywud (p) Limited

May 2011 – Present

Technology road-map – understanding the business needs, aligning and delivering a

technological road map.

Participate in business process and technology initiatives to improve business performance.

Advice the senior management of deviations from the plan, develop risk mitigation plan and

control cost.

Ensuring that the viability, resource requirement and risks involved in the development of new

products/projects are fully analyzed and considered by the management.

Ensuring full execution of the development/operations team plans and compliance with

the defined budget, as well as, proposing and initiating corrective measures in the event of

deviations between expected and actual results.

Work with Sales team on pre sales activities.

Manage vendor relationships that support development and operations, deciding when and

where to buy versus build and when and where to employ new technologies within our

business. This may be done alongside other technical team members in the organization

Technical Director

PERMA-PIPE MIDDLE EAST UAE

From Nov‘05 to April’2011, PERMA-PIPE MIDDLE EAST FZE FUJAIRAH UAE joined as Head of Productions

promoted to Head of Procurement, Materials Director and Technical Director (International)

A US Based company manufacturing PUR/PIR injection/ sprayed pre insulating pipes for district

cooling,oil & gas with most modern continuous spray foaming Technology cater 2” to 72” Dia. Annual

capacity 100’000 running meter pipe per shift basis. Accountable for all manufacturing activities, Grown

with the organization from single location operation to Multi–Location operations.

Major Projects Undertaken:

Cairn Energy India, world longest heavy crude oil pre – insulated pipeline(800KM)

Qatar gas II-Sulphur Project, Qatar

NEC Project – Kuwait : District Cooling

KOC Office Complex, Kuwait : District Cooling

New Doha International Airport, Qatar : District Cooling

Dolphin Energy, Kuwait : Sulphur Dropline

Burj Dubai lake Hotel, Dubai : District Cooling

General Manager (Manufacturing)

FOAM UDYOG

From Apr’04 with Oct’05, FOAM UDYOG as General Manager (Operations); the company is engaged

in manufacturing Cold Cured Moulded polyurethane foam articles and is OE supplier for BUS Seats &

furniture market. Operation Specialist in Polyurethane foam processing (Rigid, Flexible, Integral and

Micro cellular foam).

Accountable for the complete manufacturing operations, with focus on strategic utilization of the

resources & accountability on ROI.

Notable Contributions;

1 Converted PU moulding from manual to semi automatic operations to enhance productivity by 20%

2 In house mould & carrier development.

3 Break through development of Elastoflex FUF Bus seats, leading to a 20% cost reduction over other

bus seats, with additional advantages of very low sag factor.

4 Anything tools or mechanical

Plant Manager

Krishna Pads Limited

Sept’96-Apr’04 with Krishna Pads Ltd.; Unit of Krishna Maruti Ltd., Gurgaon; the company is an O.E.

supplier for 60% volume of Head Rest a PU product for Maruti Udyog Ltd., Gurgaon (Haryana) and is

also an OE supplier of Trims (Fabric & PVC seat Cover) of all the models and have a share of 60% of

total Maruti requirement; having a plant turnover of over Rs. 40 crores.

Joined as Manager – Headrest Section & rose to the position of Manager (Plant) in 4

years, total more than 7 years

Spearheaded the entire plant operations with a team of 160 workers & 40 staff members.

The position reported to Executive Director

Notable Contributions;

• Optimized tack time & process sequences leading to a YoY productivity increase of 5-10%

every year

• In house mould / carriers/ conveyors designing

• Optimized raw material consumption to achieve total 5% raw material savings.

• Played a key role in the erection & operations of

Head Rest Plant for 3000 unit/ shift basis

Stitching Unit for Car Seat Covers/ Trims 600 seat sets/ shift basis

• Monitored stringent adherence to ISO quality systems & the relevant documentation.

• Functioning as Part of the Implementation Team for

TQM, 5S, kaizen practices

Cost Savings through Continuous Process Improvement Programme

Suggestion Scheme

Production Manager

Best Plastronics (P) Ltd.

Sept’89-Aug’96 with Best Plastronics (P) Ltd., Parwanoo (HP) ; The company is involved in the

manufacturing of rigid Poly-Urethanes Articles as slabs, pipe sections, panels, blocks which find their

application in Thermal Insulation of various Projects.

Joined as production Executive & rose to Manager (Production) in 4 years

Notable Contributions;

• Line balancing through serial analysis/individual analysis

• Handled various erection & end to end operations of Rigid Polyurethane Foam Plants.

• Range developed for pipe sections inches to 28 inches insulation thickness 25mm to

200mm

• Part of development of hydraulic press to make sandwich panels import substitute save

Rs15 lac

Sr. Engineer

Synthetic Foam Ltd.

Jun’83-Aug’89 with Synthetic Foam Ltd., Sikandrabad (UP); Expertise in sandwich panels,Pipe

Sections,continuous laminated panels and other allied Insulations. Company was involved in

manufacturing continuous laminated panels, sandwhich panels, other insulations articles & scooter

seats for LML, Kanpur.

Joined as Supervisor & rose to the position of Sr. Engineer in 5 year

Notable Contributions;

• Gained knowledge over blending of polyol as per the application & pride to work over

continuous laminated panels (Substrates) trained by ICI UK

• In housing blending of polyol saving 5 % of the cost

• First Indian who made sandwich panel in India trained by Samifi Babcock France.

Last Salary Drawn: USD 8000/PM

Education: Diploma in Mechanical Engineering from U P Technical Board, Lucknow, India in year 1983



Contact this candidate