Frederick N. Wright
*** ******** **. *****: 305-***-****
Lehigh, Florida 33936
**********@*****.***
Objective
To obtain a position in project engineering, utilizing skills in
contract administration, risk management, financial analysis, and
scheduling.
Education
Georgia Institute of Technology, Atlanta, Georgia
B.S. Building Construction Technology
May 2004
Certificate in Business Finance
May 2004
Work Experience
DO IT WRIGHT LAWN SERVICE May 2012 - Present
Lawn Maintenance Worker
Experience with the following:
. Using commercial mowers from the following manufacturers: John
Deere, Husqvarna, and Kubota
. Use of hedge trimmers, string trimmers, and blowers
. Mulching
. Planting, Pruning and Trimming of trees and bushes
. Sodding
. Irrigation repair/troubleshooting
FLW, LLC September 2012 - November 2012
Freelance Writer
. Wrote game summaries and recorded statistics for various high
school football games for the News-Press
TURNER CONSTRUCTION COMPANY February 2003 -
June 2009
Superintendent
July 2008 - June 2009
CDC #23 NCID Laboratory/Vivarium
. Managed $25 million dollars in contracts in the following
trades: Earthwork, Masonry, Special Coatings (MMA Flooring),
Demolition and Structural/Misc. Steel
. Responsible for reconciliation of an owner allowance for
maintenance of a vital Cart Path (transportation for scientists,
animals and labwork)
. Submitted signed Action Plans to Owner for approval when New
Construction and existing work came together and would impact
daily CDC functions
. Conducted weekly meetings with the owner for construction issues
. Operated bobcat for leveling of temporary roads onsite, also
operated forklift, material hoist, and mechanical pallet jacks
to assist material deliveries
. Supplemented management for subcontractor of masonry wall touch-
up to satisfy stringent spec requirements
. Documented daily progress for contractor's I worked with and
devised solutions if production was behind to satisfy schedule
Cost Engineer December 2006 - June 2008
CDC #23 NCID Laboratory/Vivarium
. Assessed risks involved with scope and potential exposures for a
$300 million project to assist collaborating business unit's
earnings forecasts
. Supported scheduler to accurately forecast work in place and
manpower projections for all bid packages; Creating a cost
loaded schedule
. Executed and successfully audited budget/accounting sheets in
accordance with Turner Construction Co. cost/accounting
requirements
. Created and published Quarterly Earnings Reports to allow senior
management review of potential enhancement to the earnings
position for the project
. Designed studies to analyze costs incurred and used as a proxy
to defend projections, where forecasts remained consistent
. Due to $30million concrete bid package performed in-house, I
generated all unit cost projections for work and measured
labor/material costs to revise each pay period
. Tracked and estimated excavation for Caissons and footer
installations
. Managed labor costs of project, with use of projections to avoid
cost overruns
. Managed data entered and forecasting of project backpage, matrix
spreadsheet to track all general condition costs
Engineer/Superintendent October 2005 - December 2006
Gwinnett County Detention Center, Lawrenceville, Georgia
. Managed $30 Million in subcontracts from the following trades:
Security/Hardware, Electrical, Precast, Mechanical, Fire Alarm,
Painting, Metal Framing & Drywall, Flooring, Millwork, Final
Cleaning
. Created and implemented successful "Partnering" presentation
where final requirements were listed and explained prior to
Closeout/Commissioning phase, for Design Team and Subcontractors
. Mitigated risks by identifying any unbought contract items and
wrote missing scope for buyout
. Facilitated document control for RFIs, document revisions, and
submittals
. Distributed project documents to subcontractor for pricing
review and issued change to Owner once costs were received
. Developed proficiency in conflict resolution between subcontract
personnel, design team and Turner. Evidenced by job completion
on schedule and no additional subcontractor claims
. Generated Punchlist items for Owner and worked with
subcontractors to close 99% of all items created
. Scheduled and supervised final renovation requirements without
impact to Gwinnett County operations and with no other staff
Field Engineer/Asst. Engineer June 2004 - October 2005
1180 Peachtree, Atlanta, Georgia
. Managed six contracts with a total value of $32 Million dollars
in Landscaping, Hardscape, Miscellaneous Steel, Curtain Wall,
Overhead Doors, and Mechanical trades.
. Facilitated change order process and coordinated with design
team any information requests
. Consolidated submittals into online database for document
retention purposes
. Coordinated with local authorities for site permitting
. Documented design changes for potential cost changes and
obtained pricing exercises from subcontractors affect by change;
estimated when information was not available
. Conducted LEED compliancy review for certified Gold-status
. Maintained QA/QC log for cast in place concrete and recorded as-
builts
. Coordinated with concrete subcontractors to provide 10 control
lines to accommodate a 4-day pour schedule
. Used Total Stations with both HP48 and Data Collectors to Stake-
out control lines and record as-built information
. Responsible for layout/quality control of embed placement in
elevated slabs, columns, and walls
. Operator for bobcat and material hoist
Certifications
. Firestop Product Training February 2003
. Fall Protection Training
March 2003
. First Aid and CPR Training
January 2009
Special Skills
Computer
. Office tools: MS Word, Excel, PowerPoint, Outlook, Photo Editor
. Project tools: Prolog Manager, Primavera P6, Sure Track
. 3D Modeling Software: Micro Station 3-D Modeler
. Graphics Software: Adobe Acrobat, Photo Shop
. Layout/Survey Tools: Data Collectors, 2-second Theodolites, Leveling
Equipment
Volunteering Experience
Harry Chapin Food Bank March 2013 -
Present
Volunteer Worker
. Assisting with packaging of food to benefit local charities or
and for Octagon Wildlife project
Dekalb Habitat for Humanity October 2010 -
February 2011
Office Assistant
. Assisted in office work (taking calls, preparing fundraising
brochures and letters, and consolidating information for
prospective and current recipients of Habitat homes)