Post Job Free
Sign in

Engineer Project

Location:
Fort Myers, FL, 33936
Salary:
40-50K
Posted:
August 06, 2013

Contact this candidate

Resume:

Frederick N. Wright

*** ******** **. *****: 305-***-****

Lehigh, Florida 33936

**********@*****.***

Objective

To obtain a position in project engineering, utilizing skills in

contract administration, risk management, financial analysis, and

scheduling.

Education

Georgia Institute of Technology, Atlanta, Georgia

B.S. Building Construction Technology

May 2004

Certificate in Business Finance

May 2004

Work Experience

DO IT WRIGHT LAWN SERVICE May 2012 - Present

Lawn Maintenance Worker

Experience with the following:

. Using commercial mowers from the following manufacturers: John

Deere, Husqvarna, and Kubota

. Use of hedge trimmers, string trimmers, and blowers

. Mulching

. Planting, Pruning and Trimming of trees and bushes

. Sodding

. Irrigation repair/troubleshooting

FLW, LLC September 2012 - November 2012

Freelance Writer

. Wrote game summaries and recorded statistics for various high

school football games for the News-Press

TURNER CONSTRUCTION COMPANY February 2003 -

June 2009

Superintendent

July 2008 - June 2009

CDC #23 NCID Laboratory/Vivarium

. Managed $25 million dollars in contracts in the following

trades: Earthwork, Masonry, Special Coatings (MMA Flooring),

Demolition and Structural/Misc. Steel

. Responsible for reconciliation of an owner allowance for

maintenance of a vital Cart Path (transportation for scientists,

animals and labwork)

. Submitted signed Action Plans to Owner for approval when New

Construction and existing work came together and would impact

daily CDC functions

. Conducted weekly meetings with the owner for construction issues

. Operated bobcat for leveling of temporary roads onsite, also

operated forklift, material hoist, and mechanical pallet jacks

to assist material deliveries

. Supplemented management for subcontractor of masonry wall touch-

up to satisfy stringent spec requirements

. Documented daily progress for contractor's I worked with and

devised solutions if production was behind to satisfy schedule

Cost Engineer December 2006 - June 2008

CDC #23 NCID Laboratory/Vivarium

. Assessed risks involved with scope and potential exposures for a

$300 million project to assist collaborating business unit's

earnings forecasts

. Supported scheduler to accurately forecast work in place and

manpower projections for all bid packages; Creating a cost

loaded schedule

. Executed and successfully audited budget/accounting sheets in

accordance with Turner Construction Co. cost/accounting

requirements

. Created and published Quarterly Earnings Reports to allow senior

management review of potential enhancement to the earnings

position for the project

. Designed studies to analyze costs incurred and used as a proxy

to defend projections, where forecasts remained consistent

. Due to $30million concrete bid package performed in-house, I

generated all unit cost projections for work and measured

labor/material costs to revise each pay period

. Tracked and estimated excavation for Caissons and footer

installations

. Managed labor costs of project, with use of projections to avoid

cost overruns

. Managed data entered and forecasting of project backpage, matrix

spreadsheet to track all general condition costs

Engineer/Superintendent October 2005 - December 2006

Gwinnett County Detention Center, Lawrenceville, Georgia

. Managed $30 Million in subcontracts from the following trades:

Security/Hardware, Electrical, Precast, Mechanical, Fire Alarm,

Painting, Metal Framing & Drywall, Flooring, Millwork, Final

Cleaning

. Created and implemented successful "Partnering" presentation

where final requirements were listed and explained prior to

Closeout/Commissioning phase, for Design Team and Subcontractors

. Mitigated risks by identifying any unbought contract items and

wrote missing scope for buyout

. Facilitated document control for RFIs, document revisions, and

submittals

. Distributed project documents to subcontractor for pricing

review and issued change to Owner once costs were received

. Developed proficiency in conflict resolution between subcontract

personnel, design team and Turner. Evidenced by job completion

on schedule and no additional subcontractor claims

. Generated Punchlist items for Owner and worked with

subcontractors to close 99% of all items created

. Scheduled and supervised final renovation requirements without

impact to Gwinnett County operations and with no other staff

Field Engineer/Asst. Engineer June 2004 - October 2005

1180 Peachtree, Atlanta, Georgia

. Managed six contracts with a total value of $32 Million dollars

in Landscaping, Hardscape, Miscellaneous Steel, Curtain Wall,

Overhead Doors, and Mechanical trades.

. Facilitated change order process and coordinated with design

team any information requests

. Consolidated submittals into online database for document

retention purposes

. Coordinated with local authorities for site permitting

. Documented design changes for potential cost changes and

obtained pricing exercises from subcontractors affect by change;

estimated when information was not available

. Conducted LEED compliancy review for certified Gold-status

. Maintained QA/QC log for cast in place concrete and recorded as-

builts

. Coordinated with concrete subcontractors to provide 10 control

lines to accommodate a 4-day pour schedule

. Used Total Stations with both HP48 and Data Collectors to Stake-

out control lines and record as-built information

. Responsible for layout/quality control of embed placement in

elevated slabs, columns, and walls

. Operator for bobcat and material hoist

Certifications

. Firestop Product Training February 2003

. Fall Protection Training

March 2003

. First Aid and CPR Training

January 2009

Special Skills

Computer

. Office tools: MS Word, Excel, PowerPoint, Outlook, Photo Editor

. Project tools: Prolog Manager, Primavera P6, Sure Track

. 3D Modeling Software: Micro Station 3-D Modeler

. Graphics Software: Adobe Acrobat, Photo Shop

. Layout/Survey Tools: Data Collectors, 2-second Theodolites, Leveling

Equipment

Volunteering Experience

Harry Chapin Food Bank March 2013 -

Present

Volunteer Worker

. Assisting with packaging of food to benefit local charities or

and for Octagon Wildlife project

Dekalb Habitat for Humanity October 2010 -

February 2011

Office Assistant

. Assisted in office work (taking calls, preparing fundraising

brochures and letters, and consolidating information for

prospective and current recipients of Habitat homes)



Contact this candidate