Post Job Free
Sign in

RF Engineer

Location:
Rancho Santa Margarita, CA, 92688
Salary:
45/hr
Posted:
August 06, 2013

Contact this candidate

Resume:

CV / R E S U M E

MIEDO DONQUE

E-mail address: *********@*****.***

Address: ** ******** ****

Rancho Santa Margarita, CA 92688

Cell Number: 714-***-****

EMPLOYMENT RECORDS:

FROM: Jan 02, 2013

TO: PRESENT

MobileNet Services Inc.

RF Engineer

RF 3G CDMA Scripting ( Irvine, CA)

CACP and CPS Script RF Engineer (Ericsson tool)

CIQ, EVDO, GDO and Session file data tool

DBA_AEM; AEM_1302; AEM_1402 template tool

NLL tool

(BTS and RBS scenarios needs scripting)

1x Commercial/ DOM

1x Commercial/ EEGS

1x Commercial

1x Test

EEGS/ Metro Cell

1302 AEM conversion 1402 AEM

SNV - (TX,AR,LA,AL,GA,FL,TN,MS) Markets

RF field data tester 4G LTE - Data collection Drive Test

QXDM kit tester- ALU-Sprint Network Vision ( LA and OC Market) ( Las Vegas

Market)

QPST,WireShark & Filezilla tool

JDSU equipment kit tester- ALU- AT&T

in - Building DAS site ( 1 month OJT Las Vegas, NV)

QXDM kit tester- Ericsson & Verizon Project with Data Pro Scanner kit data

collection

From: March 23, 2011

To: Jan 01, 2013

Department: Engineering Services RSS

COMPANY: MYCOM NORTH AMERICA (AT&T PROJECT) California

JOB DESCRIPTIONS: Field Engineer 1

AT&T 4G LTE Integration (Los Angeles, CA)

Integrate Ericsson 4G LTE equipment DUL RBS6601 and DUW30 3G to DAS system

Scripts loading

Coordination with Switch support for proper activation, (at&t MPC MIC TIER

III and MYCOM NIC supports)

Data and Voice testing,

CID verification and actual data speed testing with screen shot for 4G LTE

Call testing with scrambling code and frequency carrier for 3G

Fiber connection check from the router and RRU's B2 and B5

CAT-5E connection check from the router

COAX RF jumpers check for proper sector assignment and connectors

Carrier Frequency check with Frequency Analyzer

Troubleshooting if needed due to alarms on each by Site ID equipment like

Link problems, RSSI Level and Fiber optic connections

Project Manager Training (Datalogix Texas - T Mobile Modernization)

1 Month Project Management

Daily Field Scheduling

Purchasing Electrical supplies and basic materials needed for the project

Daily bridge meeting with Ericsson Management

Timesheet approval for Field Engineers weekly

Ericsson Training Certification for DUG integration with RBS6601 and 6602

cabinets

Field Engineer applicants interview

Sprint Project / Black and Veatch (Samsung Equipments)

On Job Training on 3G, 4G/LTE and CSR integration

Conduit installation for fiber and _48vdc wiring path from Ciena terminal

box to

Equipments Cabinet

(SFR09 Market)

Level 2 T1 installations on copper, fiber optics and Microwave link system

to the Node B UMTS Ericsson Equipments

(Northern California, Western Nevada) SFR07 Market

T1 Reduction on GSM equipments Northern and Southern California with BSC

switch support.

(DALLAS 30 Market)

Cabinet Harvest on GSM cabinet 2206 and 2106

Integration and Reconfigure on GSM Ericsson equipments.

Also involves LMU and Antenna feeder line cable connection modifications

T1 connection modification at cabinet end for both straight and cascaded

connections Coordinate with the GSM Switch support department for

verifications on the planning of T1 swing over modified connections cabling

Hardware de-install and re-install like CDU's, dTRu's, ASU's if needed.

Inventory report on the de-install GSM cabinets to update hardware missing

and needed to order with

Basic software Print Screen Shot needed like OMT and Alarm view for

reporting

Take some photos on the equipment shoot and site information view after

reconfigurations

Take Inventory data on hardware from the recovered cabinets like asset tags

and part number with equipment status.

Basic new site installation on COW (Communication on Wheels) mobile cell

site cabinet and cabling GSM equipments

GSM 2206 Cabinets Complete New Site Installation

Commissioning, Integration and fault clearing on both GSM 1900 & 850

Ericsson Equipment cabinets for 2 months in Atlanta, Georgia (ATL 25&27)

market

Calibration on Anritsu equipment (Site Master) for Return Loss path test on

antenna jumper cables for 3 sectors. E911 Test call

Level 1 & 2 tester and trouble shooter for T1 extension for Node B (UMTS)

3G equipment interface and activation preparation for 3 months

Birmingham, AL (ALM02) market.

From : Nov 8, 2010

To: March 22, 2011

Mycom North California - Datalogix Texas Project

Cabinet Harvest on GSM cabinet 2206 and 2106

Integration and Reconfigure on GSM Ericsson equipments.

Also involves LMU and Antenna feeder line cable connection modifications

T1 connection modification at cabinet end for both straight and cascaded

connections Coordinate with the GSM Switch support department for

verifications on the planning of T1 swing over modified connections cabling

Hardware de-install and re-install like CDU's, dTRu's, ASU's if needed.

Inventory report on the de-install GSM cabinets to update hardware missing

and needed to order with

Basic software Print Screen Shot needed like OMT and Alarm view for

reporting

Take some photos on the equipment shoot and site information view after

reconfigurations

Take Inventory data on hardware from the recovered cabinets like asset tags

and part number with equipment status.

FROM: MARCH 12, 2003

TO: Nov 2010

POSITION: SHIPPING MANAGER AND QUALITY CONTROL

COMPANY: CHAMPION SIDE CARS INC.

11841 MONARCH ST. GARDEN GROVE CA 92841

JOB DESCRIPTIONS: From July 2006 to November 2010

Shipping Manager

In charges on Data entry and packages preparation for shipping out small

packages using UPS WorldShip 12.0 software system as a primary shipping

tool on a daily basis.

Using LTL shipping carrier which involves phone scheduling, create bill of

lading online and creating shipping labels.

Quality Control

I check all the finished products from the production line such as paint

quality, audio system and making sure all the ordered items are in place

and safe before shipping out.

Basic computer maintenance job for both hardware and software improvements

like virus clean up.

Plan a daily to weekly crating schedule using MS Excel, Word and Power

point for documentation and shipping labels.

Previous assignments: From March 2003- June 2006

Production Manager at the Fiberglass department

Planning and Scheduling for the weekly production schedule.

Body Preparation Department, Painting Shop, and up to the Polishing Shop

department which is the final process before the assembly area.

Make forms and data documentations on the production line using MS Excel

office program such the product identification traveler form.

Shipping Manager using UPS World Ship program.

FROM: OCT. 2002

TO: NOV. 2002

POSITION: RNE-RF SURVEYOR ENGINEER

COMPANY: MAGELLAN COMMUNICATIONS Corp.

JOB DESCRIPTION: ALCATEL- DIGITEL (SUN CELLULAR)

GSM 1800 ALCATEL

DUTIES AND RESPOSPONSIBILITIES

To get the precise coordinates of the three (3) candidates per coverage

ring

To evaluate the assign cell site for radio link and signal coverage

To take panoramic picture of both field and building roof top sites

Drawing of cell site location and its possible high rise obstructions

Equipment Used:

GPS (global positioning system)

COMPASS

SURVEY MAP Scale: 50,000

BINOCULAR

DIGITAL CAMERA

LAPTOP COMPUTER

Area of assignments: Samar Island, Southern Cebu Island, Panay Island,

Negros Island

FROM: JAN 2001

TO: MAY 2001

POSITION: TRANSMISSION RF ENGINEER

COMPANY: LUCENT TECHNOLOGIES PHILIPPINES

(DOTC TSB (Telepono Sa Baranggay) Luzon Project)

JOB DESCRIPTION:

DUTIES AND RESPONSIBILITIES

SURVEY PREPERATION

Preparation of photographic maps to be used in the field

Map study - includes identifications of sites, Network Diagram, Path

profile, Azimuth Diagram

Preparation of site survey equipment

Drawing of actual site location such as proposed payphone location, tower

location and height, if need solar panel location

To designate radio equipment suitable to the sites requirements

To design outside plant wiring layout for payphones if needed

GPS (global positioning system)

ALTEMETER

COMPASS

SURVEY MAP

BINOCULAR, STILL CAMERA, LAPTOP COMPUTER

Area assignment: Abra Province, Benguet province

FROM: APRIL 1997

TO: JULY 1999

POSITION: SWITCHING INSTALLER

COMPANY: (ETSI) SIEMENS

JOB DESCRIPTION (Islacom and PLDT project)

DECTLINK commissioning and receiver trouble shooting

Subscribers Installation of RNT (Radio Network Terminal) of

D.E.C.T.LINK(Digitally Enhance Cordless Telephone Link)Radio Local Loop for

6 months

Initialization (software download) of RNT

Telephone coordination with the switch personnel at the central office for

phone number assignment and initialization for newly install unit.

Installation of EWSD switching equipment, rack to rack cabling

a) Installation of (EWSD) Equipment for ISLACOM Van

1) Installation of Compact Remote Exchange (CRE) Equipment (20,000 lines)

2) Installation of Small Digital Exchange (SDE) Equipment (15,000 lines)

3) Installation of Digital Line Unit (DLU) Equipment

b) Installation of Main Distribution Frame metal support and Cable Pair

Testing at Terminal Block

Rack to MDF (Main Distribution Frame) color code cabling

c) Installation of Power Supplies (AC / DC)

d) Installation of(BBS)Battery Branching Set

at O.N.U(Optical Network Unit)without power failure

FROM: OCT 1991

TO: DEC 1994

POSITION: JUNIOR SWITCHMAN AND FIELD SURVEYOR (Central Office XBX)

COMPANY: PHILIPPINE LONG DISTANCE TELEPHONE

1993 TO 1994 JUNIOR SWITCHMAN PLDT (COEM) ANALOG

JOB DESCRIPTION

Test board man

MDF wiring jobs

Coordinate with outside plant personnel for

Cable testing and cable pair verifications

PREVIOUS ASSIGNMENTS:

1991 TO 1993 COORDINATOR & SURVEYOR (Reserve Applicant Survey) PLDT

JOB DESCRIPTION

Site evaluation for wiring path and distance

Site evaluation for lines availability

Cable Assignment verification coordinates with the cable assigner

Customer assistance

Preparation of Reserve Applicant Form and daily destination schedule for

the Surveyors daily assignment

EDUCATIONAL ATTAINMENT:

YEAR SCHOOL / ADDRESS

1980 - 1984 CEBU STATE COLLEGE OF SCIENCE AND TECHNOLOGY

Address: M.J.Cuenco Ave; CEBU CITY

(High School)

1984 - 1990 UNIVERSITY OF SAN CARLOS TECHNOLOGICAL CENTER

Address: Talamban, Cebu City

(COLLEGE)

DEGREE EARNED: Bachelor of Science of Electronics and Communications

Engineer

September - December 10, 2005

Address: STA. ANA COLLEGE

Computer technician

GOV'T EXAM TAKEN:

NATIONAL COLLEGE ENTRANCE EXAMINATION

- 1983 -PASSED

ELECTRONICS AND COMMUNICATION ENGINEERING BOARD EXAMINATION

- 1990 -PASSED

PRC LICENSE NO. ECE NO. 7043

SEMINARS ATTENDED:

T-Mobile Integration DUG DUL DUW (Rip and Replace)

Digitally Enhance Cordless Telephone Link (Windows NT 4.0)

D.E.C.T.LINK COMMISSIONING ENGINEER Nov., 1997 Dr. Sascha Nieber (SIEMENS

AG; Germany)

TOTAL QUALITY MANAGEMENT (ISO 9000) Apr., 1999 Engr. Arnold Z. David (ETSI

HRD)

On-the-job-Training:

ABS CBN TV CHN3 TRX Department Cor. Leon Kilat ; Pelaez Ext., Cebu City

SPECIAL SKILLS

: Repair and assemble some of electronic home appliances

: Computer literate - Windows MSOffice, Windows OS installation

: CS3 PhotoShop

CHARACTER REFERENCES:

Engr. Joel Madera

AT&T MOBILITY, CA

RAN Project SR. Manager

Engr. Ronnie Canimo

MYCOM NORTH AMERICA

Implementation Project Manager (AT&T Los Angeles, CA)

Dr.Sascha Nieber

Technical Instructor

Siemens AG, Public Communication Networks Service Training Center

******.******@***.*******.**

Michel Schmit

Survey Consultant,Lucent Technologies

Radio Path and Site Surveyor

*******@*******.***.**

Engr. Cyril Dinopol

RF Engineer

Ericsson, PA

Engr. Ronald Villaflores

Project Manager

EXI-Parsons, CA



Contact this candidate