E/I Const Supervisor / Inspector

Location:
Indonesia
Salary:
Negiotable
Posted:
August 06, 2013

Contact this candidate

Resume:

Lead E&I Inspector / E & I Construction Supervisor

Name : Guntur Siregar

Resident : Perumahan Demangan Regency

Jl. Bougenville, No: 45 - Lamongan (East Java)

Citizenship : Indonesia

PC : Indonesia, English

Passport No : A 0232788

Date of Birth : 03 - 03 - 1969

Mobile Phone No: +62-81-331-***-***

Work Phone : +62-21-785*-**** Ext 4435

Email : *******.******@*****.***; ******.*******@*****.***

Education and Qualification:

- EEHA - COMPEX JTL Certificate No: 25773

- Indonesia Oil & Gas Electrical Inspector, Cert No: 041/IKM/MIGAS/2011

- Skill Certificate of Electrical QC Inspector Cert No:N.12/PT.TEC/855.60/490/III/1998

- Degrees in Electrical Engineering

Safety Training:

- Basic Fire Fighting (BFF)

- Basic First Aid (BFA)

- STOP (Safety Training Observation Program) By ConocoPhillips Indonesia

- Respiratory Protection By ConocoPhillips Indonesia

- PTW, Level 2, By ConocoPhillips Indonesia

- HAZID By ConocoPhillips Indonesia

- LOTO By ConocoPhillips Indonesia

- Hazardous Material Safe Handling By ConocoPhillips Indonesia

- Safety Leadership for Workforce By ConocoPhillips Indonesia

- Hearing Conservation By ConocoPhillips Indonesia

- Personal Protection Equipment (PPE) By ConocoPhillips Indonesia

Resume & Expertise

Objective:

Work with Sincerity, Commitment and hard work with Safety & Quality &

Ensure the growth of the Organization along with Personal growth

Work Experience:

Aug 2012 to Present

ConocoPhillips Indonesia Inc.Ltd via CUA

Sumpal Gas Gathering Expansion (CPGL) Project onshore at Sumpal Gas Gathering

Station in South Sumatra - Indonesia

As E/I Construction Supervisor (Client Rep)

- Responsible for ensuring safe and successful execution of construction

activities in their area.

- Participates in Project Management Team and leads E/I Construction

Execution Team.

- Responsible for effective coordination of construction activities with

other construction leads and functional and support efforts.

- Develops safety plans and construction execution plans.

- Defines key deliverables and timing to achieve construction

activities.

- Stewards performance to measures, including safety, quality, cost,

schedule, and operability

- Serves as management interface with construction contractors.

- Works with construction's safety and quality managers to ensure

project expectations are understood and necessary plans are in place.

- Responsible for ensuring construction plans and interfaces are

coordinated

- Works with functions and construction and engineering teams to resolve

sub-project construction issues

- Coordinates and monitors the activities of assigned contractors

performing work within the Instrumentation and Electrical disciplines

and ensures compliance with project safety, quality, schedule, cost,

engineering and specifications requirements

- Supervise the team for timely and accurate work execution

- Play an active role in the development of the safety culture on the

project making safety a Natural part of all work performed

- Assist contractor in early site construction planning/construction

planning prior to site mobilization

- Interface with QA/QC personnel to address quality issues/progress

- Monitors the day to day activities of the Contractor. Works with

Engineering to ensure that there is proper electrical and

instrumentation coverage in the field

- Provides expertise to Site Team to avoid/resolve electrical and

instrumentation quality issues

- Review and monitor project electrical and Instrument Field Design

Changes, Concession - Requests, and Non-conformance Reports

- Monitor and review Contractor's electrical and Instrument engineering construction effort and make recommendations to Engineering and Project Engineers

- Inspect construction and installation work within the discipline to ensure compliance with work orders including technical documents,procedures, International standard, specifications and codes

- Monitoring the contractor Progress activities, Inspection and test plans relating to construction

- Provide technical support and advice to project procurement and construction activities

- Monitor Contractor's and vendors' quality control effort, Works effectively within established policies and procedures, and participates in the further development of these to meet changing needs.

- Keep management team informed of significant issues or developments identified during quality activities and actions taken to improve the situation

- Perform regular assessments and audits to ensure that each worker is qualified for work in accordance with the approved procedure records and ensures that the proper procedures are being applied

23 Dec 2011 to 20 June 2012

Energy Engineering Consultant. LLC (Third Party) to Petrofac International(UAE) LLC

South Yoloten Gas Field Development Project / Turkmenistan Gas Project

Locaton: Siemens Indonesia Factory

As QAQC Engineer Inspector (Electrical)

- Monitors the day to day activities of the vendor. Works with Engineering and Construction to ensure that there is proper electrical and instrumentation coverage in the field.

- Monitor that all electrical quality inspection activities are in accordance with the Project Quality Plan and Company QA/QC procedures

- Ensure that all electrical inspection is performed in the field in a consistent manner and that the inspection complies with the Company and Contractor Quality Assurance and Control Plans

- Keep the Site Quality Coordinator and the engineering updated of the status of electrical and instrumentation quality issues and problems with achieving electrical and instrumentation quality expectations

- Witnesses of FAT& FRT the MV Air Insulation Switchgear, 10KV, 2000A, 3Phase, 50 Hz with total 213 no's / 11 set Switchboards Panel

- Ensure all Panel assembly and accessories as per Purchase Contract Requirement

- Ensure Design as per Documentation including: General Arrangement,Single Line Diagram, Schematic Drawing, Equipment List, Bill of Material, LV Lay out Drawing

- Inspection and checked of Mechanical Operation for Inter lock,Operation of Moving Parts

- Checked Electrical and Pneumatic device for Operation of Correct sequence

- Witnesses of Function test, Resistance of Main Circuits testing, LV/MV dielectric test, Secondary injection test for protection and Metering,Auxiliary Electrical device testing, CT / VT Ratio polarity and Primary Injection test, Integrated FAT with IPCS

- Ensure equipment criticality ratings and/or Vendor Surveillance levels are evaluated with the relevant Engineering and SCM Personnel and agreed with Company as required

- Prepare a punch list of item requiring remedial work base upon finding from the FAT

- Ensure remedial works have been carry out in accordance with the agreed punch list

- Ensure document test complying with IEC 62271-200 clause 7 for each assembled transport unit according to the confirmed FAT ITP

Nov 2011 to 15 Dec 2011

BIE Australia / Campbell @ Associates Pte Ltd

ICV Stair Tower for Woodside NR2 Project

Location, Heerema Marine care of PT.McConnell Dowel Service at Batam -

Indonesia

As QAQC E/I Inspector

- Monitors the day to day activities of the contractor. Works with Engineering and Construction to ensure that there is proper electrical and instrumentation coverage in the field

- Monitor that all electrical and instrumentation quality inspection activities are in accordance with the Project Quality Plan and Company and Contractor QA/QC procedures

- Ensure that all electrical and instrumentation work is performed in accordance with the Specifications

- Inspected of Electrical and Instrument Equipment Installation in HAZARDOUS Area

- Ensure that all required E&I related inspections are performed properly

- Ensure remedial works have been carry out in accordance with the agreed punch list

- Ensure equipment criticality ratings and/or Vendor Surveillance levels are evaluated with the relevant Engineering and SCM Personnel and agreed with Company as required

25 Aug 2011 to 31 Oct 2011

BW Offshore - Singapore

Fabrication of the FPU TSB (Floating Process Unit Terang Sirasun Batur Field Project) Top Side Module for LP-Gas Compression Module, HP-Gas Compression Module, Gas Dehydration-Teg Regeneration Module, Inlet Gas and Condensate Separation Module at VME/Utraco Fabrication Yard in Batam-Indonesia

The FPSO will used by BW-Offshore / Kangean Energy for a Gas FPSO for the Terang Sirasun Batur Fields Offshore in Indonesia

As Sr QAQC E/I Inspector

- Monitors the day to day activities of the contractor. Works with Engineering and Construction to ensure that there is proper electrical and instrumentation coverage in the field

- Monitor that all electrical and instrumentation quality inspection activities are in accordance with the Project Quality Plan and Company and Contractor QA/QC procedures

- Monitor and ensure effective execution and implementation of QA/QC plan and activities requirements as set and or directed by QA/QC Manager

- Ensure that all electrical and instrumentation work is performed in accordance with the Specifications

- Keep the Site Quality Coordinator and the Construction Manager updated of the status of electrical and instrumentation quality issues and problems with achieving electrical and instrumentation quality

expectations

- Provides expertise to Site Team to avoid/resolve electrical and instrumentation quality issues

- Ensure that all electrical and instrumentation inspection is performed in the field in a consistent manner and that the inspection complies with the Company and Contractor Quality Assurance and Control Plans

- Perform QC of all daily electrical and instrumentation reports,engineering drawings, and inspection records

- Performs spot reviews and checks of Contractor's records and ensure proper documentation is maintained.

- Inspected of Electrical and Instrument Equipment Installation in HAZARDOUS Area

- Ensure equipment criticality ratings and/or Vendor Surveillance levels are evaluated with the relevant Engineering and SCM Personnel and agreed with Company as required

- Working with the Electrical and Instrument team to develop inspection and test procedures and to monitor their implementation in the field

- Ensure that all E&I related activities are performed safely and in compliance with project -specifications, and regulatory requirements.

- Assess Subcontractor and Vendor capability to meet the Quality requirements of the Project

- Inspect construction and installation work within the discipline to ensure compliance with work orders including technical documents,procedures, International standard, specifications and codes

- Witnessing of Electrical and Instrument Testing

- Inspect, update, monitor and supervise the implementation of actions for closing punch items

- Perform regular assessments and audits to ensure that each worker is qualified for work in accordance with the approved procedure records and ensures that the proper procedures are being applied

March 2011 to 21 Aug 2011

ConocoPhillips Indonesia Inc.Ltd via Velosi

Construction of Dayung Early Gas Compression (DEGC) Project at Dayung Gas Gathering Station in South Sumatra - Indonesia

As QA/QC E/I Inspector (Client Rep)

- Supervise the team for timely and accurate work execution

- Monitors the day to day activities of the Contractor. Works with Engineering and Construction to ensure that there is proper electrical and instrumentation coverage in the field.

- Ensure that all electrical and instrumentation work is performed in accordance with the Specifications

- Monitor that all electrical and instrumentation quality inspection activities are in accordance with the Project Quality Plan and Company and Contractor QA/QC procedures.

- Inspected of Electrical and Instrument Equipment Installation in HAZARDOUS Area

- Keep the Site Quality Coordinator and the Construction Superintendent updated of the status of electrical and instrumentation quality issues and problems with achieving electrical and instrumentation quality expectations.

- Provides expertise to Site Team to avoid/resolve electrical and instrumentation quality issues

- Monitors contractor electrical and instrumentation crews working in the field to ensure compliance to specifications and procedures

- Provides technical guidance and ensure compliance with legal requirements and PDS Company standards for electrical and instrumentation documents.

- Ensure that all electrical and instrumentation inspection is performed in the field in a consistent manner and that the inspection complies with the Company and Contractor Quality Assurance and Control Plans

- Undertaking quality control surveillance of construction activities,including contractor's quality control arrangements as necessary

- Perform QC of all daily electrical and instrumentation reports,engineering drawings, and inspection records.

- Performs spot reviews and checks of Contractor's records and ensure proper documentation is maintained.

- Assist with quality assessments being performed in their area.

- Perform regular assessments and audits to ensure that each worker is qualified for work in accordance with the approved procedure records and ensures that the proper procedures are being applied.

- Monitoring the contractor Progress activities, Inspection and test plans relating to construction

- Witnessing of Electrical and Instrument Testing

- Checked and Monitoring the Mechanical Completion Inspection Test Report and Facilities Acceptance system

Dec 2009 to Nov 2010

Master-Marine ASA - Norway

Carry Over work construction of Service Jack-Tell Vessel (HAVEN) from Batam - Indonesia to Nimo AS Fabrication yard in Eydehavn - Norway

The vessel will use to Ekofisk by ConocoPhillips Norway

Fabrication of New Ship building for Service Jack-Tell Vessel at Drydocks

World Graha fabrication yard in Batam - Indonesia

As Sr QA/QC Inspector & Mechanical Completion Coordinator E/I/T (Owner Rep)

- Coordinates and monitors the activities of assigned contractors performing work within the Electrical, Instrumentation and Telecommunication disciplines and ensures compliance with project

safety, quality

- Monitors the day to day activities of the Contractor. Works with Engineering and Construction to ensure that there is proper E/I/T coverage in the field.

- Monitoring the contractor Progress activities, Inspection and test plans relating to construction

- Supervise the team for timely and accurate work execution

- Undertaking quality control surveillance of construction activities,including contractor's quality control arrangements as necessary

- Assess Subcontractor and Vendor capability to meet the Quality requirements of the Project

- Analysis and review of Project Completions Dossiers and system reports relating to the commissioning and start up scope.

- Verify that all Electrical equipment hardware systems are commissioned, handed over and accepted in a timely manner, ensuring quality and completion of handover dossiers and agreed punch lists.

- Ensure equipment criticality ratings and/or Vendor Surveillance levels are evaluated with the relevant Engineering and SCM Personnel and agreed with Company as required

- Ensure that all E/I/T work is performed in accordance with the Specifications

- Monitor that all E/I/T quality inspection activities are in accordance with the Project Quality Plan and Company and Contractor QA/QC procedures.

- Ensure that all E/I/T inspection is performed in the field in a consistent manner and that the inspection complies with the Company and Contractor Quality Assurance and Control Plans

- Monitor and ensure effective execution and implementation of QA/QC

plan and activities requirements as set and or directed by QA/QC Manager

- Inspected of Electrical, Instrumentation & Telecom Installation in the: Electrical Building, Living Quarter (LQ) and Module

- Keep the Site Quality Coordinator and the engineering updated of the status of electrical and instrumentation quality issues and problems with achieving electrical and instrumentation quality expectations

- Coordinated of E/I/T Mechanical Completion Package

- Prepare the Subsystems MC report to Commissioning

- Responsible for all E/I/T Mechanical Completion regarding all punch out of the systems and check final paper work from the contractor

- Ensure all E/I/T equipment installation according to Norsok rules and regulation

- Inspect construction and installation work within the discipline to ensure compliance with -work orders including technical documents,procedures, international specifications, standard and codes.

- Raise, inspect, update, monitor and supervise the implementation of agreed corrective and preventive actions for closing NCR reports.

- Review relevant Inspection/Test reports from Contractors.

- Keep management team informed of significant issues or developments identified during quality activities and actions taken to improve the situation.

- All the Installation and testing as Marine standards, ABS and Norsok Standards

- Responsible for E / I / T quality control matters, MC test package and subsystem relating to site

Oct 2008 to Nov 2009

ConocoPhillips Indonesia Inc.Ltd via Velosi

Gelam Gas Compression Project (GC-1) at Gelam Gas Gathering Station in South Sumatra - Indonesia

As QA/QC E/I Inspector (Client Rep)

- Supervise the team for timely and accurate work execution

- Monitors the day to day activities of the Contractor. Works with Engineering and Construction to ensure that there is proper electrical and instrumentation coverage in the field.

- Ensure that all electrical and instrumentation work is performed in accordance with the Specifications

- Monitor that all electrical and instrumentation quality inspection activities are in accordance with the Project Quality Plan and Company and Contractor QA/QC procedures.

- Inspected of Electrical and Instrument Equipment Installation in HAZARDOUS Area

- Keep the Site Quality Coordinator and the Construction Superintendent updated of the status of electrical and instrumentation quality issues and problems with achieving electrical and instrumentation quality expectations.

- Provides expertise to Site Team to avoid/resolve electrical and instrumentation quality issues

- Monitors contractor electrical and instrumentation crews working in the field to ensure compliance to specifications and procedures

- Provides technical guidance and ensure compliance with legal requirements and PDS Company standards for electrical and instrumentation documents.

- Ensure that all electrical and instrumentation inspection is performed in the field in a consistent manner and that the inspection complies with the Company and Contractor Quality Assurance and Control Plans

- Undertaking quality control surveillance of construction activities,including contractor's quality control arrangements as necessary

- Perform QC of all daily electrical and instrumentation reports,engineering drawings, and inspection records.

- Performs spot reviews and checks of Contractor's records and ensure proper documentation is maintained.

- Assist with quality assessments being performed in their area.

- Perform regular assessments and audits to ensure that each worker is qualified for work in accordance with the approved procedure records and ensures that the proper procedures are being applied.

- Monitoring the contractor Progress activities, Inspection and test plans relating to construction

- Witnessing of Electrical and Instrumentation Testing

- Reviewed Electrical and Instrumentation for As built Drawing

- Checked and Monitoring the Mechanical Completion Inspection Test Report and Facilities Acceptance system

Sept' 2008 to Oct 2008

ConocoPhillips Indonesia Inc.Ltd via Sarku Engineering Utama

North Belut Offshore Hook Up & Commissioning of Wellhead Platform D, Natuna Sea - Indonesia

As E & I Commissioning Engineer (Client Rep)

- Ensure that all electrical and instrumentation work is performed in accordance with the Specifications

- Ensure that all electrical and instrumentation inspection is performed in the field in a consistent manner and that the inspection complies with the Company and Contractor Quality Assurance and Control Plans

- Perform regular assessments and audits to ensure that each worker is qualified for work in accordance with the approved procedure records and ensures that the proper procedures are being applied.

- Pre-commissioning & Commissioning of the Power to Platform, Air Supply to Platform, Sea & Fire water supply, Navigation Aid, Sea / Service Water System, Closed Drain System, Open Drain System, Instrument Air Distribution System, Diesel System, Fresh Water System, Fire & Gas

System, Fire Water Equipment, Fire Fighting Equipment System, Deluge System, Material Handling System, Safety System, HVAC System,Electrical Control System, LV Switchboard, Building & Emergency

Lighting (LV & LP System), Lighting Small Power, UPS System (UPS -120VAC), Telecommunication System, Telecomm PAGA System, Automation System, Earthing System, Passive Fire Protection System, Building &

Topside Structure Appurtenance & LER, Miscellaneous System - Electrical

- Checked and Monitoring the Mechanical Completion Inspection Test Report

Sept' 2007 to July '2008

CUU LONG JOINT OPERATING COMPANY (ConocoPhillips/Petro Vietnam JV) via Brunel Energy

Fabrication of Oil & Gas CPP (Central Processing Platform) for Su Tu Vang Field Development Project at McDermott Batam Fabrication yard - Indonesia

As QA/QC E/I Inspector (Client Rep)

- Monitors the day to day activities of the contractor. Works with Engineering and Construction to ensure that there is proper electrical and instrumentation coverage in the field

- Monitor that all electrical and instrumentation quality inspection activities are in accordance with the Project Quality Plan and Company and Contractor QA/QC procedures

- Monitor and ensure effective execution and implementation of QA/QC plan and activities requirements as set and or directed by QA/QC Manager

- Ensure that all electrical and instrumentation work is performed in accordance with the Specifications

- Keep the Site Quality Coordinator and the Construction Manager updated of the status of electrical and instrumentation quality issues and problems with achieving electrical and instrumentation quality

expectations

- Ensure that all electrical and instrumentation inspection is performed in the field in a consistent manner and that the inspection complies with the Company and Contractor Quality Assurance and Control Plans

- Performs spot reviews and checks of Contractor's records and ensure proper documentation is maintained.

- Inspected of Electrical and Instrument Equipment Installation in HAZARDOUS Area

- Ensure equipment criticality ratings and/or Vendor Surveillance levels are evaluated with the relevant Engineering and SCM Personnel and agreed with Company as required

- Working with the Electrical and Instrument team to develop inspection and test procedures and to monitor their implementation in the field

- Ensure that all E&I related activities are performed safely and in compliance with project specifications, and regulatory requirements.

- Inspect construction and installation work within the discipline to ensure compliance with work orders including technical documents,procedures, International standard, specifications and codes

- Witnessing of Electrical and Instrument Testing

- Inspect, update, monitor and supervise the implementation of actions for closing punch items

- Perform regular assessments and audits to ensure that each worker is qualified for work in accordance with the approved procedure records and ensures that the proper procedures are being applied

- Inspected of Electrical & Instrumentation Installation in the: Electrical Building, Living Quarter(LQ), Main Deck, Intermediate,Cellar Deck and Sub Cellar Deck for Generator, Emergency Diesel

Generator, 4160V/480V Oil Transformer, 4160V SWGR, 4160V MCC, 480V MCC, 4160V / 220V Motor, Lighting Transformer, Distribution Panel Board, Lift Gas Compressor, Heat Tracing, Batteries, UPS, HVAC, Cable

Tray, Cable Installation, Cable Glanding, Cable Termination and Grounding System

- Inspected of Instrumentation Installation for Pressure Indicator,Transmitter, PAGA System, Gas Detector, Telecommunication, PLC

- Monitoring the contractor Progress activities, Inspection and test plans relating to construction

- All the Installation and testing as per CLJOC Specification,Engineering Drawing, Vietnam standard (VIRES) and Oil & Gas System

January' 2007 to Aug' 2007

ConocoPhillips Indonesia Inc.Ltd via Germanischer Lloyd- Nusantara

Fabrication of KERISI Central processing Platform (CPP) MSF Substructure

Project in McDermott Fabrication yard, Batam Island - Indonesia

As QA/QC E/I Inspector (Client Rep)

- Monitors the day to day activities of the contractor. Works with Engineering and Construction to ensure that there is proper electrical and instrumentation coverage in the field

- Monitor that all electrical and instrumentation quality inspection activities are in accordance with the Project Quality Plan and Company and Contractor QA/QC procedures

- Monitor and ensure effective execution and implementation of QA/QC plan and activities requirements as set and or directed by QA/QC Manager

- Ensure that all electrical and instrumentation work is performed in accordance with the Specifications

- Responsible to E&I quality control matters relating to site

- Responsible for QC technical integrity of the project, installation and Testing

- Witnessing of Instrumentation Calibration, Function test, Pneumatic test and Piping hydro test

- Field verifying and witnessing of hold points associated with all electrical work including installation of cable trays and associated wiring, installation of all electrical equipment, termination of all wiring in accordance with the Project specifications

- Undertaking quality control surveillance of construction activities,including contractor's quality control arrangements as necessary

- Inspected of Electrical & Instrument Equipment Installation in HAZARDOUS Area

- Ensure that all E&I related activities are performed safely and in compliance with project specifications, and regulatory requirements

- Inspected of Instrumentation Installation and Piping Reinstatement

- Monitoring the contractor inspection and test plans relating to construction, pre-commissioning activities on site

- Checked and Monitoring the Mechanical Completion Inspection Test Report

- Reviewed as build drawing

Oct' 2006 to Dec' 2006

ConocoPhillips Indonesia Inc.Ltd via Germanischer Lloyd- Nusantara

Hangtuah Offshore Gas Filter & Gas Metering Modification, Natuna Sea - Indonesia

As QA/QC E/I Inspector (Client Rep)

- Monitors the day to day activities of the Contractor. Works with Engineering and Construction to ensure that there is proper electrical and instrumentation coverage in the field.

- Ensure that all electrical and instrumentation work is performed in accordance with the Specifications

- Monitor that all electrical and instrumentation quality inspection activities are in accordance with the Project Quality Plan and Company and Contractor QA/QC procedures.

- Keep the Site Quality Coordinator and the Construction Superintendent updated of the status of electrical and instrumentation quality issues and problems with achieving electrical and instrumentation quality expectations.

- Provides expertise to Site Team to avoid/resolve electrical and instrumentation quality issues

- Monitors contractor electrical and instrumentation crews working in the field to ensure compliance to specifications and procedures

- Ensure that all electrical and instrumentation inspection is performed in the field in a consistent manner and that the inspection complies with the Company and Contractor Quality Assurance and Control Plans

- Perform QC of all daily electrical and instrumentation reports,engineering drawings, and inspection records.

- Performs spot reviews and checks of Contractor's records and ensure proper documentation is maintained.

- Assist with quality assessments being performed in their area.

- Perform regular assessments and audits to ensure that each worker is qualified for work in accordance with the approved procedure records and ensures that the proper procedures are being applied

- Inspected of Electrical & Instrument Equipment Installation in HAZARDOUS Area

- Inspected of Cable Installation, Termination, Tubing Installation,Piping Reinstatement

- Witnessing for Cable Testing, Pneumatic test and Instruments Calibration, Instrument Loop test system, Hook-Up for Flow Transmitter- Gas service, Pressure Transmitter & Indicator-Gas service, Control Valve with SOV( Senior Orifice valve), Limit switch of Blow Down Valve(BDV) and Shut Down Valve(SDV)

Feb' 2004 to Sept' 2006

Sumitomo Wasamitra Joint Operation (Sumitomo Corp)

Construction of 2 X 660 MW Coal Fired Power Station Project Tanjung Jati"B" Jepara - Indonesia

As QA/QC E/I Engineer (Owner Rep)

- Responsible to implement Project Quality Plan in assigned scope of work

- Ensure execution of Surveillance Programs through development of Surveillance Plans and through ongoing monitoring and auditing

- Report quality issues, status